No edit summary
Line 79: Line 79:


== Ravi ==
== Ravi ==
* order last parts!!
* <s>order last parts!!</s>
* fill in method [[Oscilloscope protocol: MOST]]
* fill in method [[Oscilloscope protocol: MOST]]
* construct welder
* construct welder

Revision as of 06:36, 8 June 2013


  • Please complete the task and either 1) hyperlink to the page in our Appropedia space or 2) email Dr. Pearce and cross off the result
  • Update task list every Wednesday by midnight.

Allie

Bas

  • MOST RepRap
  • nephalometer
    • lit review
    • outline
  • print weak elec. material
  • hard drive order recommendation
  • learn mech test from Brennan
  • recyclebot operation

Ben

Brennan

  • Finish solar racking paper
  • Dial in laser speed and current
  • Weld HXs
  • Pull tensile samples
  • teach Bas mech tests

Chenlong

  • finish PV class write up only on the atmospheric conditions + albedo
  • setup PL system (today!) - black spray paint box

  • new glass etch - print Dr. Frost - verify - make sure it works on our own for PLA on normal glass
- The best recipe we have is:
- 1. clean slide with ethanol (200 proof is what we used)
- 2. soak in neat  [3-92-aminoethylamino)propyl]trimethoxysilane for 15 min.
- 3. rinse with toluene
- 4. let dry under ambient conditions over night

Halley

  • finish redesign of tent peg - email JMP
  • contact First Solar about module return - strip wires give to Ravi
  • finish openscad of framed module xwire
  • print spikes, print xwire clips
  • install at KRC in line of camera, time setup and document KRC data:MOST
  • survey of roof racks
  • survey of variable angle ground mounts
  • lit review on 20 year outdoor polymer testing-- ABS, HDPE, PLA, Polycarbonate -- current printable materials

Joseph

  • finish PVT paper - email to JMP with new figs
  • make cost comparison chart for IV/solar simulator
  • help Mosaic with new depositions

Jephias

  • finish PV class write up only on the atmospheric conditions with Chenlong
  • help Chenlong set up PL

Ravi



Publications

Dr. Pearce

(W= waiting on reply) (add to bottom of list before waiting/triggers)


Deadlines

  • June 10 IEEE PVSC
  • June 24 EE lecture
  • July 28 printer camp
  • July 31 final draft book

grants


To do

  • rewrite PL/ellip

  • pv annuity - w
  • fuel cell - W
  • trigger Queens PV
  • Salt 2
  • PV mount

Pending Projects

open design

spectral pv

Open source hardware projects

Cookies help us deliver our services. By using our services, you agree to our use of cookies.