(Created page with "== WP Essentials == This is a Work Package as part of the OSSTIP project. '''Inputs''': BZE’s Proposed updated network and frequency information, Working OSSTIP platf...") |
(→Requirements Summary: - initial version) |
||
Line 9: | Line 9: | ||
== Requirements Summary == | == Requirements Summary == | ||
In this Work Package, the previous work to set up a display and analysis capability for [[Melbourne]]’s current public transport network in [[OSSTIP/WP4]] will be applied to the first version of the new proposed public transport network and preliminary timetable that [[BZE]] have developed. | |||
Note: whilst this work package is going on, we expect considerable effort will be needed to refine the proposed network into a full [[GTFS]]-compatible timetable, even with the supporting tools developed in [[OSSTIP/WP5]]. This will primarily be the responsibility of BZE team members, although [[user:PatSunter]] will support this process throughout this work package. | |||
== Results == | == Results == | ||
(TODO) | (TODO) |
Revision as of 08:19, 25 July 2013
WP Essentials
This is a Work Package as part of the OSSTIP project.
Inputs: BZE’s Proposed updated network and frequency information, Working OSSTIP platform for display of existing PT timetable (OSSTIP/WP4), Network->timetable conversion tools (OSSTIP/WP5). Outputs: Installed instance of OSSTIP with relevant GIS data uploaded, Created map-based analysis, and updated documentation.
Estimated Time: Small-Medium
Requirements Summary
In this Work Package, the previous work to set up a display and analysis capability for Melbourne’s current public transport network in OSSTIP/WP4 will be applied to the first version of the new proposed public transport network and preliminary timetable that BZE have developed.
Note: whilst this work package is going on, we expect considerable effort will be needed to refine the proposed network into a full GTFS-compatible timetable, even with the supporting tools developed in OSSTIP/WP5. This will primarily be the responsibility of BZE team members, although user:PatSunter will support this process throughout this work package.
Results
(TODO)