Get our free book (in Spanish or English) on rainwater now - To Catch the Rain.

Motor force protocol

From Appropedia
Revision as of 20:42, 7 December 2013 by Ejhunt (Talk | Contributions) (Created page with "{{MOST}} ===Force Testing Protocol:=== DOES NOT NEED CALIBRATION #Set the raspberry pi to max current. #Only put the plunger of the syringe in the pump, not the entire syringe...")

(Difference) ← Older revision | Latest revision (Difference) | Newer revision → (Difference)
Jump to: navigation, search

Sunhusky.png By Michigan Tech's Open Sustainability Technology Lab.

Wanted: Students to make a distributed future with solar-powered open-source 3-D printing.
Currently looking for PhD or MSC student interested in solar energy policy- apply now!
Contact Dr. Joshua Pearce - Apply here

MOST: Projects & Publications, Methods, Lit. reviews, People, Sponsors, News
Updates: Twitter, Instagram, YouTube

OSL.jpg

Force Testing Protocol:

DOES NOT NEED CALIBRATION

  1. Set the raspberry pi to max current.
  2. Only put the plunger of the syringe in the pump, not the entire syringe.
  3. Place the pump, motor down, in a tensile strength tester. Set height to be just above the pump.
  4. Then tell the pump to push past the top plate.
  5. Record the force given in Newtons.