Abstract
The Smart Cart design project's result is the implementation of a new and improved concession cart for Bernie Levy of Zane middle school. The cart will allow him to more efficiently transport goods and snacks from the cart's storage and loading zone to the outdoor area where kids will purchase such goods. Pending.
One paragraph summary of your project from background to discussion and next steps.
There should be an image near the top.
Background
Bernie Levy at Zane Middle School in Eureka has employed our project design project group, The Concession Cart Crew, to solve an issue within the concession cart system that the school currently uses to sell snacks during their daily break. He presented criteria that he expects us to implement into the design of a new concession cart. His main goal is for it to be a dependable and efficient way to transport snacks and goods across the school campus.
Problem statement and criteria
Our clients biggest concern for the new cart is the noise level that it will make when being pushed across the campus and past classrooms. Other criteria that our client is concerned about is: handles for easy transportation, the weight of the carts being too heavy for students to push, the strength of the shelves on the cart not being able to withstand the weight of the supplies being sold, reducing the four carts they have now into one or two, creating lips around the shelves so that objects will not fall off, creating cushions on the perimeter of the cart to prevent damaging doorways, and creating a cover for when the carts are being stored.
Description of final project
Pending
Photos and descriptions. Use gallery.
Include a how to use and maintain section. See the how to template below.
Costs
Quantity | Material | Source | Cost ($) | Total ($) |
---|---|---|---|---|
1 | Road sign shelf (3'x2') | Arcata Scrapyard | 5.45 | 5.45 |
4 | Road sign shelf (1.5'x2') | Scrapyard | 2.76 | 10.90 |
1 | Wire rack | Scrapyard | .50 | .50 |
1 | Plywood (2'x4'x1/4") | Ace | 17.55 | 17.55 |
25 | Fender washers (1/4)" | Mill Yard | by lb | 1.00 |
2 | Hinges | Ace | 6.00 | 6.00 |
1 | Lumber (2"x4") | Mill Yard | 4.76 | 4.76 |
1 | Lumber (2"x2") | Mill Yard | 5.60 | 5.60 |
1 | Slot Angle Post (1.25"x1.25") | Ace | 35.00 | 35.00 |
100 | Screws | Mill Yard | 4.18 | 4.18 |
3 | Tire Inner tubes | Revolution Bicycle Repair | 0.00 | Donated |
1 | Bedsheet | Arcata Hospice | 4.00 | 4.00 |
Total Cost | $96.39 |
Use Help:Table_examples#Cost_Table.
Testing Results
Pending
How to build
Use Template:How_to
Pending
Discussion and next steps
Pending
References
Pending
See Help:Footnotes for more. Template:Reflist