(added 6/18 and 6/19 due dates)
(added project due dates)
Line 1: Line 1:
Homework assignments for Parras Program Summer 2006.
This is a homework page for the Parras Program that lists:
*Upcoming trips
*Reading assignments
*Big due dates posted far in advance
*Assignments posted outside of classroom hours
**Assignments assigned during class are still due regardless to whether they are posted here
Please put this page on your watchlist so that you know when assignments have been posted outside of classroom hours.
 
==Tentative Schedule of Extra Events==
==Tentative Schedule of Extra Events==
*Thursday, 6/8, 5-10PM: Meet at UTC, walk to Perote, bring bathing suit, sun protection, water, climbing shoes.
*Thursday, 6/8, 5-10PM: Meet at UTC, walk to Perote, bring bathing suit, sun protection, water, climbing shoes.
Line 5: Line 12:


==Gaviotas Reading==
==Gaviotas Reading==
*Week 2: To page 39 - "In Columbia, we've got enough problems as is."
*Week 2 (5/30): To page 39 - "In Columbia, we've got enough problems as is."
*Week 3: To page 71 - "...Gaviotas was such an infinitesimal antidote."
*Week 3 (6/06): To page 71 - "...Gaviotas was such an infinitesimal antidote."
*Week 4: To page 103 - "That's how we learn..."
*Week 4 (6/13): To page 103 - "That's how we learn..."
*Week 5: To page 127 - "The world needed to know about Gaviotas..."
*Week 5 (6/20): To page 127 - "The world needed to know about Gaviotas..."
*Week 6: To page 159 - The Trees
*Week 6 (6/27): To page 159 - The Trees
*Week 7: To page 181 - "...toasting each other for never giving up."
*Week 7 (7/04): To page 181 - "...toasting each other for never giving up."
*Week 8: To el final. Page 222
*Week 8 (7/11): To el final. Page 222


==Assignments==
==Assignments==
Line 33: Line 40:
*Before class
*Before class
**Electricity assignment
**Electricity assignment
**Read about [[:Category:Electricity_Basics|Electricity Basics]]
**Read about [[:Category:Electricity_basics|Electricity Basics]]


===Due Monday 6/5===
===Due Monday 6/5===
*Before class
*Before class
**Read more about [[:Category:Electricity_Basics|Electricity Basics]]
**Read more about [[:Category:Electricity_basics|Electricity Basics]]
**Electricity Problemset
**Electricity Problemset
**Post your two AT implementations to [[:Category:Parras AT|Parras AT]].  Make sure to log in to your own account before posting and to follow the directions at the [[:Category:Parras AT|Parras AT]] page.
**Post your two AT implementations to [[:Category:Parras AT|Parras AT]].  Make sure to log in to your own account before posting and to follow the directions at the [[:Category:Parras AT|Parras AT]] page.
Line 70: Line 77:
****Remember that the project is due in Week 9 and the writeup in Week 10.
****Remember that the project is due in Week 9 and the writeup in Week 10.


==Due Monday 7/3 ==
Final reading on [[:Category:Photovoltaic|Photovoltaic]]
==Due Monday 7/10==
Read on Agriculture
==Due Tuesday 7/11==
*Before class
**Finish reading Gaviotas
**Poetry assignment regarding Gaviotas as assigned by Lilianet Brintrup


==Assignments to Lonny==
=='''Due Thursday 7/20'''==
===How much water is in Estanque de la Luz?===
*Set an appointment with me to come make a final inspection of your projectCelebrate!
Daniel took 89 steps for the width and 96 steps for the length.  His stride is 2.5 ft/step.  The depth of Estanque de la Luz is 3.7 meters according to the sign there.
'''Width:''' 89 steps * 2.5 ft/step = 225.5 ft
'''Length:''' 96 steps * 2.5 ft/step = 240 ft
'''Depth:''' 3.7 meters * 0.3048 feet/meter = 12.1 ft
'''Volume:''' 225.5 ft * 240 ft * 12.1 ft = 654852 ft<sup>3</sup>
'''Volume in gallons:''' 654852 ft<sup>3</sup> * 7.48 gallons/ft<sup>3</sup> = 4898293 gallons
Therefore, the Estanque de la Luz holds about 4,900,000 gallons of waterThank you for the assignment, if you have any changes to the lenght or width values please post them here.


====At 200 GPM out and 0 GPM in, how long would Estanque de la Luz take to go dry?====
=='''Due Thursday 7/27'''==
At approximately 4,900,000 gallons of water stored and only the one canal of 200 GPM outflow:
*By midnight
Minutes held = 4,900,000 gal / 200 GPM = 24500 min
**Final project writeup due.
Hours held = 24500 min / 60 min/hr = 408.333 hrs
Days held = 408.333 hrs / 24 hr/day = 17.01 days
Therefore there are about 17 days of storage in Estanque de la Luz.


[[Category:Parras 2006]]
[[Category:Parras 2006]]

Revision as of 00:07, 3 July 2006

This is a homework page for the Parras Program that lists:

  • Upcoming trips
  • Reading assignments
  • Big due dates posted far in advance
  • Assignments posted outside of classroom hours
    • Assignments assigned during class are still due regardless to whether they are posted here

Please put this page on your watchlist so that you know when assignments have been posted outside of classroom hours.

Tentative Schedule of Extra Events

  • Thursday, 6/8, 5-10PM: Meet at UTC, walk to Perote, bring bathing suit, sun protection, water, climbing shoes.
  • Saturday, 6/17, 8AM: - Meet at UTC, all day trip to Nariqua, bring sun protection, alot of water, climbing shoes.

Gaviotas Reading

  • Week 2 (5/30): To page 39 - "In Columbia, we've got enough problems as is."
  • Week 3 (6/06): To page 71 - "...Gaviotas was such an infinitesimal antidote."
  • Week 4 (6/13): To page 103 - "That's how we learn..."
  • Week 5 (6/20): To page 127 - "The world needed to know about Gaviotas..."
  • Week 6 (6/27): To page 159 - The Trees
  • Week 7 (7/04): To page 181 - "...toasting each other for never giving up."
  • Week 8 (7/11): To el final. Page 222

Assignments

Due Saturday 5/27

Upload your 2 pictures of resources (make sure to do this with your own login). For the picture description - copy and paste the following into notepad. Make the appropriate edits (replace allcap text) and then paste into the description window:

'''Type of Resource:''' PUT RESOURCE DESCRIPTION HERE <br />
'''What is Available:''' WHAT KIND OF STUFF OR RESOURCES DO THEY HAVE OR OFFER <br />
'''Location:''' WHERE IS IT LOCATED? ADDRESS, CROSSSTREETS, LANDMARKS <br />
'''Notes:''' ADDITIONAL NOTES

Due Monday 5/29

  • Before class
    • Microhydro homework based upon values we collected and agreed upon in lab.
    • Read about Microhydro.
  • Before 8PM
    • Update the collective work page Parras Supplies as per the instruction on that category page (and its subordinate article pages). Note that what you are asked to cut and paste is very similar to what you wrote in the picture description page (i.e. you may want to copy picture description text from its edit window).

Due Wednesday 5/31

Due Monday 6/5

  • Before class
    • Read more about Electricity Basics
    • Electricity Problemset
    • Post your two AT implementations to Parras AT. Make sure to log in to your own account before posting and to follow the directions at the Parras AT page.

Due Wednesday 6/7

  • Before class
    • One scrap piece of paper containing an error in the HowStuffWorks article on Hydropower.
      • If you can not find an error, just turn in a scrap stating that you tried.
  • Before end of day
    • Introduction writeup of your project
      • Include answers to the questions who/what/why/when/where as best as you can. Be specific when possible, but I understand that some of this may change in the next week or two.
      • Review literature, provide links for internet resources and resource names for print media, describe your findings.
        • This is to educate yourself on your project.
        • Do not use this literature review for editorilizing or making design decisions.
        • Review multiple sources.... okay, okay.... Review at least five different, credible sources.
        • Review different parts of your project, e.g. building a vermiculture system for a local school necessitates information on vermiculuture, construction, curriculum integration and more.

Due Sunday 6/18

Read on Adobe

Due Monday 6/19

  • Before class
    • Next update of your project.
    • Should include:
      • All of the steps that you have taken so far.
        • Photos will augment the delineation of your steps nicely. See DIF Adobe Senior Center for an example of the gallery tool.
      • A proposed list of materials and budget.
        • This will take some time to figure out.
        • Use the Parras Supplies page to help find what you need.
      • A detailed timeline of activities .
        • I understand that this timeline will be just tentative. This timeline will help us foresee problems. Please adjust, as the project proceeds, to reflect reality and highlight problems, e.g. bottlenecks and underestimations.
        • Remember that the project is due in Week 9 and the writeup in Week 10.

Due Monday 7/3

Final reading on Photovoltaic

Due Monday 7/10

Read on Agriculture

Due Tuesday 7/11

  • Before class
    • Finish reading Gaviotas
    • Poetry assignment regarding Gaviotas as assigned by Lilianet Brintrup

Due Thursday 7/20

  • Set an appointment with me to come make a final inspection of your project. Celebrate!

Due Thursday 7/27

  • By midnight
    • Final project writeup due.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.