No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
===General Notes=== | ===General Notes=== | ||
*Use the [[Practivistas Dominicana/Page template and criteria]] page for as a formatting template, and refer to it for specific grading criteria. | *Use the [[Practivistas Dominicana/Page template and criteria]] page for as a formatting template, and refer to it for specific grading criteria. | ||
*Your page needs some TLC! | |||
*Add a picture to the top of your page | |||
===Abstract=== | ===Abstract=== | ||
Line 9: | Line 11: | ||
===Background=== | ===Background=== | ||
*Needs way more information... expand on who/what/when/where/why | *Needs way more information... expand on who/what/when/where/why | ||
*Talk to Gregorio about this project for some more content | |||
===Problem Statement=== | ===Problem Statement=== | ||
Line 36: | Line 39: | ||
===Literature Review=== | ===Literature Review=== | ||
* | *Expand | ||
*Fill in weather, eco-block procedure, and add a little about ''testing'' blocks | |||
====Budget==== | |||
*UPDATE | |||
====Timeline==== | ====Timeline==== | ||
* | *Provide an introduction | ||
==== | *Turn this section into a table. Click the edit tab to copy and paste the following table into your timeline section and replace with your own words. | ||
{| class="wikitable" | |||
|+<small>.</small> | |||
! Task | |||
! Date Proposed | |||
! Date Completed | |||
|- | |||
| Complete literature review | |||
| 06/06/14 | |||
| 06/07/14 | |||
|- | |||
| Establish site location | |||
| 06/06/14 | |||
| 06/13/14 | |||
|- | |||
| Start digging foundation | |||
| 06/06/14 | |||
| 06/14/14 | |||
|- | |||
| Design destacamento | |||
| 06/13/14 | |||
| 06/15/14 | |||
|- | |||
| Finish budget | |||
| 06/13/14 | |||
| 06/15/14 | |||
|- | |||
| Locate supplies | |||
| 06/13/14 | |||
| 06/15/14 | |||
|- | |||
| Purchase supplies | |||
| 06/15/14 | |||
| 06/20/14 | |||
|- | |||
| Finish digging foundation | |||
| 06/20/14 | |||
| 06/20/14 | |||
|- | |||
| Level ground | |||
| 06/20/14 | |||
| 06/21/14 | |||
|- | |||
| Tamp ground | |||
| 06/20/14 | |||
| | |||
|- | |||
| Finish tying rebar | |||
| 06/22/14 | |||
| 06/24/14 | |||
|- | |||
| Dig bathroom hole | |||
| 06/21/14 | |||
| | |||
|- | |||
| Reinforce bathroom hole | |||
| 06/21/14 | |||
| | |||
|- | |||
| Pour concrete for foundation | |||
| 06/21/14 | |||
| 06/24/14 | |||
|- | |||
| Lay brick | |||
| 06/22/14 | |||
| 07/5/14 | |||
|- | |||
| Finish foundation | |||
| 06/23/14 | |||
| 07/5/14 | |||
|- | |||
| Create platform | |||
| 06/24/14 | |||
| | |||
|- | |||
| Install pillars | |||
| 06/25/14 | |||
| | |||
|- | |||
| Install roof | |||
| 06/25/14 | |||
| | |||
|- | |||
| Lay bricks for walls | |||
| 06/25/14 | |||
| 07/05/14 | |||
|- | |||
|} | |||
===Prototypes=== | |||
*I created this tab for you as it seems more appropriate than "construction" you could use "final designs" or something like that instead | |||
*I moved the table with your recipe here... it's a great way to show what went into each of your prototypes | |||
*Include images | |||
===Test Results=== | |||
Add information and results about your testing process and results | |||
===Conclusions=== | |||
ADD | |||
=== | ===Team=== | ||
ADD | |||
Revision as of 00:24, 3 July 2014
Notes for Improvement
General Notes
- Use the Practivistas Dominicana/Page template and criteria page for as a formatting template, and refer to it for specific grading criteria.
- Your page needs some TLC!
- Add a picture to the top of your page
Abstract
- Needs more - expand as your project progesses
- Don't include any new information here that is not mentioned elsewhere in your page. The abstract is a summary of your page.
Background
- Needs way more information... expand on who/what/when/where/why
- Talk to Gregorio about this project for some more content
Problem Statement
- Ok start...objective is more than to just "recreate"...be more specific
Criteria
- Use a sortable table.
- ex:
Run # | Temperature (°F) | Humidity (%) |
---|---|---|
1 | 78 | 42 |
2 | 76 | 55 |
3 | 74 | 41 |
Literature Review
- Expand
- Fill in weather, eco-block procedure, and add a little about testing blocks
Budget
- UPDATE
Timeline
- Provide an introduction
- Turn this section into a table. Click the edit tab to copy and paste the following table into your timeline section and replace with your own words.
Task | Date Proposed | Date Completed |
---|---|---|
Complete literature review | 06/06/14 | 06/07/14 |
Establish site location | 06/06/14 | 06/13/14 |
Start digging foundation | 06/06/14 | 06/14/14 |
Design destacamento | 06/13/14 | 06/15/14 |
Finish budget | 06/13/14 | 06/15/14 |
Locate supplies | 06/13/14 | 06/15/14 |
Purchase supplies | 06/15/14 | 06/20/14 |
Finish digging foundation | 06/20/14 | 06/20/14 |
Level ground | 06/20/14 | 06/21/14 |
Tamp ground | 06/20/14 | |
Finish tying rebar | 06/22/14 | 06/24/14 |
Dig bathroom hole | 06/21/14 | |
Reinforce bathroom hole | 06/21/14 | |
Pour concrete for foundation | 06/21/14 | 06/24/14 |
Lay brick | 06/22/14 | 07/5/14 |
Finish foundation | 06/23/14 | 07/5/14 |
Create platform | 06/24/14 | |
Install pillars | 06/25/14 | |
Install roof | 06/25/14 | |
Lay bricks for walls | 06/25/14 | 07/05/14 |
Prototypes
- I created this tab for you as it seems more appropriate than "construction" you could use "final designs" or something like that instead
- I moved the table with your recipe here... it's a great way to show what went into each of your prototypes
- Include images
Test Results
Add information and results about your testing process and results
Conclusions
ADD
Team
ADD