Designed and Built by Peace Corps Volunteer, Dan Retz, April, 2004
Details available on request: dan_retz
-
Picture of the house
-
View Showing location of composter
-
Composting Chamber in basement/storage area
-
Urine line to be linked with gray water system, Screened air inlets.
-
Detail showing movable lid to remove and install the barrel.
-
Detail of a “bag” made from flour sacks designed to support and maximize ventilation of compost ( bag is to be mounted inside of barrel).
-
Picture of the installed toilet stool and ventilation pipe. Fan is installed inside the pipe just above the ceiling.
-
Detail of urine diversion funnel. The funnel is plumbed to a 1” pipe which exits the toilet chute via a 90 degree fitting, and later is plumbed to a gray water system.
-
Detail of vent pipe attachment.
-
Another view of the composting bag.
-
Picture showing foam mattress used as a air gasket and protection from flies. Detail of urine line combined with gray water system. Later project will be to divert this combined system for usage in the garden.
-
Design drawings
-
Design drawings
-
Design drawings
Word doc with images:
Try exporting from Open Office in MediaWiki format to post here, or post the .doc instead of the .docx.
Excel Cost schedule
Should be able to upload here as a .xls.
Powerpoint presentation on situation in Armenia
Should be able to upload here as a .ppt, or try http://www.slideshare.net/. Template:PeaceCorpspage