8 August 2006
- 01:4001:40, 8 August 2006 diff hist +21 N File:SunFrostPlate.jpg SunFrost unit placard current
- 01:3901:39, 8 August 2006 diff hist +19 N File:SFCompressor.jpg SunFrost compressor current
- 01:3801:38, 8 August 2006 diff hist +24 N File:FridgeTop.jpg top of the SunFrost unit current
- 01:3501:35, 8 August 2006 diff hist +41 N File:FridgeConnection.jpg Connection from PV system to refrigerator current
- 01:3201:32, 8 August 2006 diff hist +36 N File:Fridge1.jpg The refrigerator system with battery current
- 01:3101:31, 8 August 2006 diff hist +48 N File:Finalnspection.jpg Final inspection of the unit. Good work Antonio! current
- 01:2501:25, 8 August 2006 diff hist +1,682 m UTC Solar Distiller →Future Changes and Upgrades
- 01:2501:25, 8 August 2006 diff hist +15 N File:EmptyFridge.jpg No vaccines yet current
- 01:2401:24, 8 August 2006 diff hist +84 N File:CarefulWithThatFridgeEugene.jpg Cute sign indicating not to mess with the extremely important vaccine refridgerators current
- 01:2301:23, 8 August 2006 diff hist +64 N File:AntonioFridge.jpg Antonio the technician and his SunFrost DC vaccine refridgerator
- 01:1501:15, 8 August 2006 diff hist −1,679 m UTC Solar Distiller →Conclusion
- 01:0901:09, 8 August 2006 diff hist +1,085 Photovoltaic vaccine refrigeration at Centro De Salud →The Mount
- 01:0901:09, 8 August 2006 diff hist +197 UTC Solar Distiller →What Failed
- 00:0600:06, 8 August 2006 diff hist +665 UTC Solar Distiller →Testing
7 August 2006
- 02:4902:49, 7 August 2006 diff hist +775 UTC Solar Distiller →Day 3
- 02:1402:14, 7 August 2006 diff hist +146 UTC Solar Distiller →Future Changes and Upgrades
- 02:0602:06, 7 August 2006 diff hist +11 UTC Solar Distiller →Maintenence
- 02:0402:04, 7 August 2006 diff hist +181 UTC Solar Distiller →Use
- 01:5701:57, 7 August 2006 diff hist −19 UTC Solar Distiller →Future Changes and Upgrades
- 01:5301:53, 7 August 2006 diff hist +146 UTC Solar Distiller →Possible Points of Failure