The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 425: | Line 425: | ||
File:J-gnarly-firstflush2.jpg | Joint of first flush with a racket ball regulating the flow of the system. | File:J-gnarly-firstflush2.jpg | Joint of first flush with a racket ball regulating the flow of the system. | ||
File:Site ready for the stand to be build.JPG | Site ready for stand to be constructed | File:Site ready for the stand to be build.JPG | Site ready for stand to be constructed | ||
File:Top view of Stand built.JPG | Top view of constructed stand | File:Top view of Stand built.JPG | Top view of constructed stand | ||
File:Sizing the bung pipes to the platform.JPG | | File:Sizing the bung pipes to the platform.JPG | Installing pipes into bungs to connect drums | ||
File:Kyle creating spray paint master pieces.JPG | Kyle creating spray paint master pieces | File:Kyle creating spray paint master pieces.JPG | Kyle creating spray paint master pieces | ||
File:J-gnarly-firstflush3.jpg | First trial of first flush system | File:J-gnarly-firstflush3.jpg | First trial of first flush system |