The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 165: | Line 165: | ||
''' Site Specific Costs ''' | ''' Site Specific Costs ''' | ||
The estimated up-front costs for the hydro systems designed at each location were an important part of the RetScreen analysis, they were used to determine a payback period | The estimated up-front costs for the hydro systems designed at each location were an important part of the RetScreen analysis, they were used to determine a payback period. | ||
<center><gallery> | <center><gallery> |