= Literature Search on PV Penetration = | |||
[http://jrse.aip.org/authors#preMan Journal of Renewable and Sustainable Energy] | [http://jrse.aip.org/authors#preMan Journal of Renewable and Sustainable Energy] | ||
Line 12: | Line 15: | ||
* Names, "Title", ''source'', vol. '''1''', Iss. 2, pp. 888 (year). ([[hyperlinked title]]) | * Names, "Title", ''source'', vol. '''1''', Iss. 2, pp. 888 (year). ([[hyperlinked title]]) | ||
=Articles= | = Articles = | ||
* http://spectrum.ieee.org/energywise/energy/policy/calculating-the-full-cost-of-electricity-rooftop-solar-pv/ new study showing at least 15% without costing utilities any $ full study http://energy.utexas.edu/files/2016/09/UTAustin_FCe_Int_PV_Generation_2016.pdf | |||
* P. Denholm and R. Margolis, "'''Very Large-Scale Deployment of Grid-Connected Solar Photovoltaics in the United States: Challenges and Opportunities'''", U.S. Department of Energy, NREL (National Renewable Energy Laboratory), Conference Paper Preprint for Solar 2006 (2006)([[http://www.nrel.gov/pv/pdfs/39683.pdf]]) | * P. Denholm and R. Margolis, "'''Very Large-Scale Deployment of Grid-Connected Solar Photovoltaics in the United States: Challenges and Opportunities'''", U.S. Department of Energy, NREL (National Renewable Energy Laboratory), Conference Paper Preprint for Solar 2006 (2006)([[http://www.nrel.gov/pv/pdfs/39683.pdf]]) | ||
Line 28: | Line 32: | ||
** CONCLUSIONS: | ** CONCLUSIONS: | ||
*** 'it would take very little in terms of back-up storage or end-use load management associated with PV to provide the equivalent of firm PV capacity up to significant load penetration levels.' | *** 'it would take very little in terms of back-up storage or end-use load management associated with PV to provide the equivalent of firm PV capacity up to significant load penetration levels.' | ||
-------------------------- | |||
* P. Denholm, R.M. Margolis, "'''Evaluating the limits of solar photovoltaics (PV) in traditional electric power systems'''", ''Energy Policy'', vol.'''35''', Iss.5, pp. 2852-2861 (2007). ([[http://www.sciencedirect.com/science?_ob=ArticleURL&_udi=B6V2W-4MFCW7V-2&_user=1025668&_rdoc=1&_fmt=&_orig=search&_sort=d&view=c&_acct=C000050549&_version=1&_urlVersion=0&_userid=1025668&md5=b08bd315411486c6a58d391d74163d0c]]) | |||
** NOTES: | |||
*** 'we evaluate the ability of PV to provide a large fraction (up to 50%) of a utility system’s energy by comparing hourly output of a simulated large PV system to the amount of electricity actually usable.' | |||
** CONCLUSIONS: | |||
*** 'The limited flexibility of base load generators produces increasingly large amounts of unusable PV generation when PV provides perhaps 10–20% of a system’s energy.' | |||
------------------------------ | |||
* M. Thomson and D.G. Infield, "'''Network Power-Flow Analysis for a High Penetration of Distributed Generation'''", ''IEEE Transactions on Power Systems'', vol.'''22''', Iss. 3, pp.1157-1162 (2007). ([[http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=04282058]]) | |||
**NOTES: | |||
***This paper discusses and analyses the impact of micro-generation (in particular, PV+CHP hybrid residential systems) on the voltage rise in a test-network in the UK. | |||
***The authors created an unbalanced load-flow engine using Matlab, which takes modelled load and generation data and saves the calculated voltages as minute-by-minute data for all nodes across the network. | |||
***'we considered the European Standard, EN 50160, which states that, under normal operating conditions, all ten-minute mean values shall be within the range 195.5 V to 253 V. The 50% PV and 100% CHP scenarios, already discussed, lead to voltages that exceed this range, and thus, accommodating penetrations of this order would require some adjustment or re-engineering of network voltage control systems. The next two rows of Table I (30% PV and 23% CHP, respectively) show scenarios that would be acceptable under EN 50160 without any changes to voltage control systems.' (pp.1161) | |||
[[Category:Queens Applied Sustainability Group Literature Reviews]] | |||
[[Category:Photovoltaics]] |
Revision as of 12:53, 11 February 2017
Literature Search on PV Penetration
Journal of Renewable and Sustainable Energy
Keep alphabetized list of references with notes after in the following format: S. E. Shaheen, C. J. Brabec, N. S. Sariciftci, F. Padinger, T. Fromherz, and J. C. Hummelen, Appl. Phys. Lett. 78, 841 (2001) (hyperlinked title).
See also: User:J.M.Pearce/PV+CHP
This is a list of refs for PV penetration levels (also try solar, photovoltaic, intermittent, or distributed generation penetration/percent/) - this refers to the maximum amount of solar photovoltaic electricity able to be provided reliably on the grid.
- Names, "Title", source, vol. 1, Iss. 2, pp. 888 (year). (hyperlinked title)
Articles
- http://spectrum.ieee.org/energywise/energy/policy/calculating-the-full-cost-of-electricity-rooftop-solar-pv/ new study showing at least 15% without costing utilities any $ full study http://energy.utexas.edu/files/2016/09/UTAustin_FCe_Int_PV_Generation_2016.pdf
- P. Denholm and R. Margolis, "Very Large-Scale Deployment of Grid-Connected Solar Photovoltaics in the United States: Challenges and Opportunities", U.S. Department of Energy, NREL (National Renewable Energy Laboratory), Conference Paper Preprint for Solar 2006 (2006)([[1]])
- NOTES:
- Figures of System Load with and without large PV systems on two summer and two spring days.
- Model to analyze the impacts of large-scale PV deployment.
- CONCLUSIONS:
- 'By increasing the system flexibility, it now becomes at least theoretically possible to provide 50% of the system's energy from PV - although this requires the ability to completely turn off all conventional generation for short periods of time without cost penalty.'
- 'We found that increasing the flexibility of the electric power system in the simulated system could increase the contribution of PV to perhaps 20%-30%. Beyond this contribution, enabling technologies such as fuel switching in "smart" appliances, dispatchable load from plug-in hybrid or other electric vehicles, or stationary energy storage would be required to enable very high levels of PV contribution to the electric power system.'
- NOTES:
- R. Perez, S. Letendre, and C. Herig, "PV and Grid Reliability: Availability of PV Power during Capacity Shortfalls", University of Albany (2001)([[2]])
- NOTES:
- Figure of PV Availability during major summer 1999-2000 outages.
- CONCLUSIONS:
- 'it would take very little in terms of back-up storage or end-use load management associated with PV to provide the equivalent of firm PV capacity up to significant load penetration levels.'
- NOTES:
- P. Denholm, R.M. Margolis, "Evaluating the limits of solar photovoltaics (PV) in traditional electric power systems", Energy Policy, vol.35, Iss.5, pp. 2852-2861 (2007). ([[3]])
- NOTES:
- 'we evaluate the ability of PV to provide a large fraction (up to 50%) of a utility system’s energy by comparing hourly output of a simulated large PV system to the amount of electricity actually usable.'
- CONCLUSIONS:
- 'The limited flexibility of base load generators produces increasingly large amounts of unusable PV generation when PV provides perhaps 10–20% of a system’s energy.'
- NOTES:
- M. Thomson and D.G. Infield, "Network Power-Flow Analysis for a High Penetration of Distributed Generation", IEEE Transactions on Power Systems, vol.22, Iss. 3, pp.1157-1162 (2007). ([[4]])
- NOTES:
- This paper discusses and analyses the impact of micro-generation (in particular, PV+CHP hybrid residential systems) on the voltage rise in a test-network in the UK.
- The authors created an unbalanced load-flow engine using Matlab, which takes modelled load and generation data and saves the calculated voltages as minute-by-minute data for all nodes across the network.
- 'we considered the European Standard, EN 50160, which states that, under normal operating conditions, all ten-minute mean values shall be within the range 195.5 V to 253 V. The 50% PV and 100% CHP scenarios, already discussed, lead to voltages that exceed this range, and thus, accommodating penetrations of this order would require some adjustment or re-engineering of network voltage control systems. The next two rows of Table I (30% PV and 23% CHP, respectively) show scenarios that would be acceptable under EN 50160 without any changes to voltage control systems.' (pp.1161)