Abstract
Text and pictures will be inserted later
Acoustic Dampening Project Plan
More text and figures will be inserted here as well.
Background
Problem Statement and Criteria
Criteria | Weight | Description | |||
---|---|---|---|---|---|
Safety | 10 | Must be designed to... | |||
Aesthetics | Design must be aesthetically pleasing | ||||
Cost | 3 | Entire design must cost less than $400. | |||
Durability | 5 | Must last until Humboldt Coastal Nature Center's remodel | |||
Inspiration | 7 | Design inspirational quality of using alternative building methods. | |||
Ease of Maintenance and Installation | 7 | Design must be easy to install and free of a lot of maintenance | Functionality | 10 | Design must improve acoustics within Humboldt Coastal Nature Center. |
Description of final project
Costs
Costs
Material | What We Paid | Retail Price |
---|---|---|
Bike Stand | $50.00 | $299.99 |
Shipping and Handling | $24.00 | $24.00 |
DC Motor | $65.00 | $404.99 |
Fuse | $0.99 | $0.99 |
Fuse holder | $2.69 | $2.69 |
12 gauge wire(15 ft) | $4.99 | $4.99 |
Voltmeter | $9.99 | $9.99 |
Diode | Free | $1.59 |
Voltage Regulator | Free | $19.99 |
Total | $157.66 | $769.22 |