(→Instructions: delete) |
(→Maintenance: schedule/instructions jdr) |
||
Line 179: | Line 179: | ||
===Maintenance=== | ===Maintenance=== | ||
The system needs to be properly maintained in order to run properly and at full power. For full detail on the past full maintenance of the PV system project, refer to " ". General maintenance includes: | The system needs to be properly maintained in order to run properly and at full power. For full detail on the past full maintenance of the PV system project, refer to " ". | ||
===Schedule=== | |||
;Yearly | |||
*Perform checks on the SunSaver | |||
*Test voltage/amperes in full sun | |||
*Check all terminals and wires for loose, broken, corroded or burnt connections or components | |||
;Monthly | |||
*Clear PV panel on roof of any debris | |||
===Instructions=== | |||
General maintenance includes: | |||
*The PV panel tasks and signs of damage | |||
*The yearly SunSaver-10 PV controller tasks | |||
*Any battery testing and replacement | |||
*Light failure dimming analysis and testing | |||
New maintenance tasks include: | New maintenance tasks include: | ||
*Continuing general maintenance listed above | |||
*Monitor the new LED DC lights for dimming and failure | |||
-If failure, examine wiring connections, battery load and/or solar panel input | -If failure, examine wiring connections, battery load and/or solar panel input | ||
-If dimming, test socket load output. | -If dimming, test socket load output. | ||
-Socket Load | |||
;-Socket Output Load Testing- | |||
1 | {{How to | ||
2 | |title=How to Test a Socket Output Load | ||
3 | |File: | |1 |Disconnect the fixture canopy (if one is used) to the electrical box and expose the electrical wiring. | ||
|File: | |2 |Set multimeter to DC 15 - 20 V DC. | |||
|File: | |3 |Touch one probe to the side of the socket while touching the bottom of the socket with the other probe; you should receive a reading of 12V DC. | |||
|File: | |4 |Disconnect the fixture wires if you find the connections were good and to check the continuity. With the meter set on the ohms function, check for continuity between the white fixture wire and the metal shell inside the light socket. he meter will display “0.000” on its LCD if there is continuity. If the socket is bad, the LCD will display “O.L.” Then check for continuity between the black fixture wire and the brass button in the lamp socket. The LCD will either display “0.000” or “O.L.” | |||
--If the socket checks out OK but the light still does not work, the brass contact of the socket is not making contact with the base of the bulb and needs to be pried away from the base of the socket. | --If the socket checks out OK but the light still does not work, the brass contact of the socket is not making contact with the base of the bulb and needs to be pried away from the base of the socket. | ||
}} | |||
Read more at: | Read more at: | ||
1. http://www.ehow.com/how_7882922_use-multimeter-test-light-fixtures.html | 1. http://www.ehow.com/how_7882922_use-multimeter-test-light-fixtures.html | ||
2. http://www.instructables.com/id/EVERYONE-Needs-a-Multi-Meter/step5/Light-bulbs/ | 2. http://www.instructables.com/id/EVERYONE-Needs-a-Multi-Meter/step5/Light-bulbs/ | ||
==Conclusion== | ==Conclusion== | ||
Revision as of 17:08, 30 April 2015
Background
This page was added by a Humboldt State University Engineering class January-May 2015:
CCAT (Campus Center for Appropriate Technology) is an appropriate technology demonstration house on the Humboldt State University campus in Arcata, California. Student staff and volunteers work weekly at CCAT to keep it running smoothly. The Greenshed is a building where the workers store tools and work on small projects. The Greenshed solar panel powers a solar lighting system that workers can use to light the shed at night. The solar lighting system was installed in early 2013. There are eight lights powered by the panel that hang inside the shed. CCAT workers would like to use the shed at night, especially when it gets dark early in the day.
Problem statement
Problem: CCAT staff let us know the lights in the shed are too dim for workers to use the shed at night.
Our goal is to keep the lights bright at night. This project is for our Engineering 305 class (which ends May 2015). We will be investigating the solar panel, its location, the battery, wiring, and light fixtures for problems. The CCAT workers would like us to try to power their tools with the solar panel. If we find an easy solution to the brightness problem we will look into having the system power tools in the shed, adding a shut-off timer, and a data logging device.
The objective of this project is to: -Create better lighting in the CCAT tool shed -Find the best location for the solar panel to intake it's maximum -Replace and fix any poorly functioning or broken equipment -Add improvements to the system if time/resources allow (tool powering ability, shut-off timer, data-logging device)
Criteria
Below are the Project Evaluation Criteria. We will use them to judge the success of our project. We, the students working on this project, created these criteria with the help of the project manager. These criteria will help everyone working on the project know what is most important (10 being most important/non-negotiable; 1 being least important).
Criteria | Weight | Contraints |
---|---|---|
Funtionality | 10 | Produces and stores enough to sufficiently light the green-shed |
Safety/Placement | 10 | Must be constructed and placed in risk-free positions (no hazards) |
Cost | 9 | Does not exceed project budget |
Maintainability | 8 | Easy to preserve equipment |
Aethetics | 7 | Looks professional |
Educational | 5 | Includes educational piece for community/CCAT demonstration house |
Reproducibility | 5 | Can be reproduced by local builders |
Costs
The following table displays the costs for the Green Shed Solar Lighting project. Equipment is purchased after testing so costs may fluctuate.
Proposed budget.
Quantity | Material | Source | Cost ($) | Total ($) |
---|---|---|---|---|
6 | Lights Bulbs | Ace Hardware | $5.00 | $30.00 |
6 | Light Housings | Ace Hardware | $2.50 | $15.00 |
1 | 12V 12 Ah Battery | Interstate Battery | $60.00 | $60.00 |
1 | Southwire 14YEL-SOLX500 Solid Copper THHN, 10 Gauge | Ace Hardware | $54.00 | $54.00 |
1 | 25ft flexible conduit | Ace Hardware | $25.00 | $25.00 |
1 | CanaKit Raspberry Pi 2 Complete Starter Kit with WiFi | Amazon | $70 | $70 |
1 | Motion Sensor | Ace Hardware | $20 | $20 |
Total Cost | $274.00 |
Rough Timeline
Objectives | Relative Week |
---|---|
Group forms | Week 1 Jan 19th |
Research literature and prepare criteria | Week 3 Feb 2nd |
Go to CCAT and evaluate project | Week 4 Feb 9th |
Perform a Solar Pathfinder Analysis(best location Study) | Week 5 Feb 16th |
Create temporary timeline and budget | Week 6 Feb 23rd |
Identify best location and test battery, lights, system efficiency with tools(multimeter), consult with CCAT on data logging and order Raspberry PI data logger | Week 7 Mar 3rd |
Review and identify issue 1. If lights: order new efficient lights 2. If location: order equipment needed to move to new location 3. If battery: unknown | Week 8 Mar 9th |
If new equipment arrives, install and test | Week 10 Mar 23rd |
If new equipment arrives, install and test | Week 11 Mar 30th |
Install Raspberry PI and motion sensor | Week 12 Apr 6th |
Test system with data logger in best location and evaluate | Week 13 Apr 13th |
Write up review and handbook for operating the system- including data logger and motion sensor | Week 14 Apr 20th |
Final evaluation of system | Week 15 Apr 27 |
Final Report and Appropedia page complete | Week 16 May 4th |
Literature Review
This is a summation of the literature reviewed to work on the lighting system for the CCAT Green-shed January-May, 2015.
Photovoltaic Systems Overview
The photovoltaic (PV) system converts solar radiation into thermal energy and direct electrical current (dc). The direct current can be converted to alternate current (ac) through an inverter. [1]
Energy, Electricity, & Circuits
"OHM's LAW: Voltage (electrical pressure) pushes amperage (current) through a resistance" [2]
Equation: V=IR
V (voltage, sometimes written as E, measured in volts), I (current, measured in amps), R (resistance, measured in ohms) [3]
Off Grid Power
CCAT’s photovoltaic system is classified as a stand-alone system. This system connects the battery to the modules through a charge controller. This controller switches off the PV array when the battery is fully charged. This battery must be large enough to store enough charge for night use, when the lights are necessary. There is no back-up supply or main grid connection. [4]
Orientation and Location of Panel
Power output by the module will change based on the angle of sunlight striking the module. [5] The output will rise as sunlight striking angle increases until the sun reaches its peak, then decreases as the sun goes down and the angle decreases once again.
Factors Affecting Output
Standard test conditions: Industry conditions under which a solar panel is tested and a production tolerance of +/-5%, meaning that the total wattage expressed is 95 Watts/ 100 Watt module. [5]
Temperature: Module output power reduces as modular temperature increases. [5]
Dirt and dust: Accumulation of the substances blocks sunlight, which reduces the final output.
Wiring and mismatch: Inconsistencies in performance from one module to another results in a 2% loss in the system’s power.
DC to AC conversion loss: The DC power generated by the photovoltaic system loses power during the conversion process.
Weather/Climate: The panels need solar radiation to produce energy, shade (by objects or clouds) decreases output [6]
Operation
This is the how to section explaining how and when to maintain the new system in the greenshed with the new added features.
Maintenance
The system needs to be properly maintained in order to run properly and at full power. For full detail on the past full maintenance of the PV system project, refer to " ".
Schedule
- Yearly
- Perform checks on the SunSaver
- Test voltage/amperes in full sun
- Check all terminals and wires for loose, broken, corroded or burnt connections or components
- Monthly
- Clear PV panel on roof of any debris
Instructions
General maintenance includes:
- The PV panel tasks and signs of damage
- The yearly SunSaver-10 PV controller tasks
- Any battery testing and replacement
- Light failure dimming analysis and testing
New maintenance tasks include:
- Continuing general maintenance listed above
- Monitor the new LED DC lights for dimming and failure
-If failure, examine wiring connections, battery load and/or solar panel input -If dimming, test socket load output.
- -Socket Output Load Testing-
Read more at: 1. http://www.ehow.com/how_7882922_use-multimeter-test-light-fixtures.html 2. http://www.instructables.com/id/EVERYONE-Needs-a-Multi-Meter/step5/Light-bulbs/
Conclusion
Testing
The system requires each feature functioning to run, so we tested every feature that may be the cause of the lights running dim. We tested the battery load, the lights in the system at the start, and the position of the solar panel.
Processes
Battery Load Test: The battery load test was necessary to confirm the battery was still providing it's full power it can provide.
Light Power Test: Although CCAT requested for lighting through sockets, we tested the replaced hard-wired lights to show that they still produced their full power output. This testing was done with the help of the Humboldt State Physics lab staff and equipment. Professors Terry Halmo and " " tested that the lights could produce more Wattage (" "W) than what they were producing in the greenshed through the PV system (" ").
Solar Pathfinder:
Location of Sunlight/ 2 hours: This test involved showing up bi-hourly, and recording the location of the sunlight along the roof to show which location received the most solar insolation. The following figures are based on the sunrise-sunset period of May 1, 2015: 6:14 - 20:00.
7:00
9:00
11:00
13:00
15:00
17:00
19:00
Results
Battery Load Test:
Light Power Test:
Solar Pathfinder:
Discussion
Next Step
Team
References
- ↑ Tiwari, G. N.(2006). Solar Energy Technology Advances. New York: New York.
- ↑ Sullivan, Daniel (2011). "What are VOLTs, OHMs & AMPs?" Youtube, <https://www.youtube.com/watch?v=zYS9kdS56l8> (Feb. 2, 2015).
- ↑ Turner, R.P.(1978).Solar Cells and Photocells, Indianapolis, Indiana.
- ↑ Reddy, P. Jayarama.(2010). Science Technology of Photovoltaics. 2nd ed. Hyderabad, India.
- ↑ 5.0 5.1 5.2 (2001)."A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION".Energy Council of Canada <http://www.energy.ca.gov/reports/2001-09-04_500-01-020.PDF>.(Feb. 9,2015)
- ↑ Solar Energy International (2004).Photovoltaics: Design and Installation Manual, Gabriola Island, British Columbia.