The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 154: | Line 154: | ||
Image:con14.jpg|The final gutter system and placement 'final design'' | Image:con14.jpg|The final gutter system and placement 'final design'' | ||
Image:con15.jpg|The final placement of the overflow which waters the hugelkulture ''final design'' | Image:con15.jpg|The final placement of the overflow which waters the hugelkulture ''final design'' | ||
Image:con15 (1).jpg|The final placement of the overflow, first flush, and one storage tank ''final design'' | Image:con15(1).jpg|The final placement of the overflow, first flush, and one storage tank ''final design'' | ||
Image:con16.jpg|The bottom of the first flush with a drainage hole to empty the water in the first flush ''final design'' | Image:con16.jpg|The bottom of the first flush with a drainage hole to empty the water in the first flush ''final design'' | ||
Image:con17.jpg|Flexseal on the bottom of one of the storage tanks ''construction'' | Image:con17.jpg|Flexseal on the bottom of one of the storage tanks ''construction'' |