Combined display of all available logs of Appropedia. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 06:21, 5 December 2016 Caleb Wegener talk contribs uploaded File:Water enters the black hole.jpg (Photo of the finished design. This shows where the water flows from the gutters into the first flush water diverter before flowing under the walk path and then back up into the secondary storage(not pictured).)
- 05:56, 5 December 2016 Caleb Wegener talk contribs uploaded a new version of File:Foundation.jpg (Pictured is the foundation for the secondary storage tank of "The Black Hole" rainwater catchment design solution. This foundation was laid to keep the tank from settling unevenly and tipping over.)
- 05:55, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole in progress overflow.jpg (This photo was taken during the implementation phase of "The Black Hole" rainwater catchment design solution. The photo shows boards covering the hole and trench heading downhill for the system overflow drain.)
- 05:53, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole in progress carpet.jpg (Photo taken after the digging of "The Black Hole" is completed and filled with used carpet. The carpet was installed to protect the pond liner from rock and root damage.)
- 05:51, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole in progress.jpg (Picture taken during the digging phase of "The Black Hole" design implementation.)
- 05:51, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole finished.jpg (Final picture of "The Black Hole" rainwater catchment design solution.)
- 05:50, 5 December 2016 Caleb Wegener talk contribs uploaded File:Before the black hole gutter.jpg (Photo shows the previous gutter configuration prior to installation of "The Black Hole" rainwater catchment system.)
- 05:45, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole quick disconnect.jpg (Quick disconnect for the secondary storage of "The Black Hole" rainwater catchment system.)
- 05:44, 5 December 2016 Caleb Wegener talk contribs uploaded File:Before the black hole.jpg (Before picture of the area where "The Black Hole" is to be installed.)
- 05:44, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole secondary overview.jpg (Secondary storage and plumbing leading into "The Black Hole." The hole is covered with a wooden top.)
- 05:42, 5 December 2016 Caleb Wegener talk contribs uploaded File:Black hole secondary.jpg (Secondary storage for "The Black Hole.")
- 05:29, 5 December 2016 Caleb Wegener talk contribs uploaded File:The Black Hole In Progress.JPG (This is another photo of the hole during the digging phase.)
- 05:28, 5 December 2016 Caleb Wegener talk contribs uploaded File:The Black Hole Takes Form.JPG (This photo was taken during the digging phase and shows how the hole was covered during times of work to keep individuals from falling and injuring themselves.)
- 05:26, 5 December 2016 Caleb Wegener talk contribs uploaded File:The Black Hole Secondary Storage.jpg (This is a picture which shows the pipes where the water flows back up from under the walkway and into the secondary storage before flowing into the primary storage pond. There are two quick disconnect rubber fittings so that the horizontal pipe and fit...)
- 05:21, 5 December 2016 Caleb Wegener talk contribs uploaded File:Water Enters The Black Hole.JPG (Here is pictured the inflow for "The Black Hole." This shows how the water flows into the 20 gal. barrel before filling the barrel and continuing to the secondary storage. This barrel is fitted with a quick disconnect fitting for ease of maintenance.)
- 05:19, 5 December 2016 Caleb Wegener talk contribs uploaded File:Before The Black Hole.jpg (This is a before photo of the area where "The Black Hole" is to be installed)
- 05:16, 5 December 2016 Caleb Wegener talk contribs uploaded File:The Black Hole Finished.jpeg (This photo shows the top of the pond with the two blue barrels and the plumbing which was not buried. The smaller barrel to the left is a 20 gal. first flush diverter and the other barrel on the right side of the photo is the 55 gallon secondary storage.)
- 03:35, 5 December 2016 User account Caleb Wegener talk contribs was created