1

During setup, the anesthesia machine is missing its backup oxygen cylinder, one suction bottle is already half-full, and the OR lights are slightly dim. The first case is scheduled in 15 minutes. What is the priority action?

Replace the backup oxygen cylinder
Proceed since the primary oxygen line is functioning
Adjust the lighting
Empty and disinfect the suction bottle

2

Why is it essential to standardize OR layout for common procedures?

To reduce time spent teaching new nurses
To ensure all staff can anticipate equipment location and preserve sterile workflow
To make the OR easier to clean
To minimize the number of staff needed

3

The circulating nurse finds unopened sterile packs placed on a damp surface during cleaning. Equipment checks are otherwise complete. What is the correct response?

Continue because equipment function outweighs sterile risk
Dry the outer wrappers and present them
Replace the packs immediately
Leave the packs in place since they are unopened

4

What is the main reason waste bins should be replaced during turnover, even if they are not yet full?

To avoid confusing staff
To comply with waste policy
To save time during the next turnover
To prevent cross-contamination and reset zones between cases

5

During turnover between cases, the floor is visibly soiled, suction is functional but nearly full, and sterile drapes are not yet restocked. The surgeon arrives early and pressures the team to bring the patient in. What should the circulating nurse prioritize?

Replace suction bottles first
Proceed with patient entry while finishing tasks
Cleaning and disinfecting the floor
Restocking sterile drapes first

6

Why is the defibrillator tested during preprocedure setup even if it is rarely used?

To document nursing diligence
Because cardiac emergencies can occur in any procedure
Because surgeons prefer it for certain cases
To comply with international accreditation

7

After a procedure, the team disinfects surfaces, replaces waste bins, and restocks supplies. However, they leave the suction bottle unchanged because it was only used briefly. For the next patient, what risk does this pose?

Unnecessary duplication of effort
Delayed turnover in the following case
No significant risk if bottle is less than half-full
Cross-infection between patients

8

Which of the following best describes the principle of ergonomics in OR setup?

Storing heavy equipment in clean utility areas
Minimizing walking distance for circulating staff
Placing all equipment within the sterile zone
Arranging equipment to reduce strain and allow smooth workflow

9

The hospital generator is unreliable, and during setup you discover the backup UPS for OR lights has a weak battery. Suction and anesthesia are functional. Which adaptation is safest?

Proceed since overhead lights are currently functional
Proceed but ensure portable emergency lamps are present
Borrow a UPS from non-clinical equipment
Postpone all cases until UPS is repaired

10

Why must OR logbooks document equipment checks, restocking, and turnover actions?

To meet auditing requirements
To protect staff legally in case of an adverse event
To ensure accountability and continuity across cases and shifts
To record staff productivity


Return to main

Page data
Part of Setting Up the Operating Room - ECSACONM
SDG
Authors
License CC-BY-SA-4.0
Language English (en)
Related 0 subpages, 2 pages link here
Views 7 page views (analytics)
Created August 22, 2025 by KatKor
Last edit September 19, 2025 by Felipe Schenone
Cookies help us deliver our services. By using our services, you agree to our use of cookies.