Nice work so far. See below for comments on some sections:
*Abstract
** Include an abstract that summarizes the whole project
*Background
** Include team members appropedia page links
** explain where Arcata is in California
*Problem statement
** Good introduction
*Criteria
** redo the constraint for aesthetics
*Literature Review
** Very good start, maybe include some detail on some construction materials used
*Construction
** include a table describing the steps taken during construction, with figures and descriptions
*Timeline
** Very good timeline
*Costs
** Looks good, list a price for soil if it were to be bought at store
* Operation
** include a table that describes the steps of operation of the final design, include figures and detail
* Maintenance
** good introduction, proof read and include some more detail to why it needs to be maintained
* Schedule
** good schedule of maintenance
* Instructions
** put instructions into a table to organize a little better
* Conclusion
** include these section with more detail in next appropedia upoad
*Testing results
*Discussion
*Lessons learned
*Next steps
*Troubleshooting
** very good troubleshooting table
*References
** very good format
** possibly add more references

Latest revision as of 06:30, 27 April 2015

Add links for user pages in background

-List criteria in table by weight from largest to smallest

Feedback sections/template[edit source]

Nice work so far. See below for comments on some sections:

  • Abstract
    • Include an abstract that summarizes the whole project
  • Background
    • Include team members appropedia page links
    • explain where Arcata is in California
  • Problem statement
    • Good introduction
  • Criteria
    • redo the constraint for aesthetics
  • Literature Review
    • Very good start, maybe include some detail on some construction materials used
  • Construction
    • include a table describing the steps taken during construction, with figures and descriptions
  • Timeline
    • Very good timeline
  • Costs
    • Looks good, list a price for soil if it were to be bought at store
  • Operation
    • include a table that describes the steps of operation of the final design, include figures and detail
  • Maintenance
    • good introduction, proof read and include some more detail to why it needs to be maintained
  • Schedule
    • good schedule of maintenance
  • Instructions
    • put instructions into a table to organize a little better
  • Conclusion
    • include these section with more detail in next appropedia upoad
  • Testing results
  • Discussion
  • Lessons learned
  • Next steps
  • Troubleshooting
    • very good troubleshooting table
  • References
    • very good format
    • possibly add more references