The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 104: | Line 104: | ||
=== Screens === | === Screens === | ||
Once the rainwater runs off of the roof(catchment surface) it is caught in the gutters | Once the rainwater runs off of the roof(catchment surface) it is caught in the gutters and gets redirected to the gutter drop( the spot where the gutter converges vertically). This is where the screen will be placed at a 45-degree angle, for easy maintenance and simple visual representation of how much debris has been accumulated, not to mention this is where most of the particulates will be caught. We chose to use chicken wire to catch the larger bits of sticks and twigs, and as the system continues flowing to the conveyance pipes. The second screen for this system will be placed right before the first flush, but this second screen will be made of finer mesh material so to ensure that all of the dirt will be extracted before entering the storage tank. | ||
=== First Flush === | === First Flush === |