The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 165: | Line 165: | ||
We have developed instructions and a brief schedule one should follow if implementing the system. | We have developed instructions and a brief schedule one should follow if implementing the system. | ||
==Construction== | |||
Very complete description of how final project is made. This large section should have lots of pictures. Use the [[Help:Images#Galleries]] and probably [[Template:How_to]] (e.g. [[Barrel O' Fun Worm Bin Instructions]]). | |||
=== Maintenance === | |||
Introduce this maintenance section. | |||
=== Schedule === | === Schedule === |