Introduction
This project is a solar blah blah blah.
PV Array
describe array and components.
- Panel
- Mount
- Roof
- Inverter
Wiring
describe wiring... maybe some photos,, yada yada.
Construction
describe in general
- First we had to dig a hole deep enough to support the stand. Due to the size of the array this hole had to be five feet deep. We dug the hole with Daniels tractor which is run off bio-diesel. (See Fig: #1 and 2)
- In the bottom of the hole we laid 6 inches of gravel. This gravel is to allow for the drainage of any water that might find its way into the post.
- Poured concrete.
- Be careful of blah
- Get weather report and check for sun
- Install rack
-
Digging hole. I wonder how much test will still look good in this caption? Let's see what this looks like with word wrap.
-
-
-
-
-
-
-