002.jpg (640 × 435 pixels, file size: 132 KB, MIME type: image/jpeg)
Because the yard is on a slant we had to level it to lay the foundation. On the side farthest away form the blue house we had to dig down about three feet. Moving all of the soil by hand took much longer then we originally thought and if I were to do it again I would consider renting a small bulldozer.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:18, 23 October 2006 | 640 × 435 (132 KB) | Soysinlimites (talk | contribs) | Because the yard is on a slant we had to level it to lay the foundation. On the side farthest away form the blue house we had to dig down about three feet. Moving all of the soil by hand took much longer then we originally thought and if I were to do it |
You cannot overwrite this file.
File usage
The following page uses this file: