Product development encompasses a number of concerns that are not always easily captured in saying that something is “ready.” Four separate readiness scales are listed for each item in this story along with a consideration of risk. The five categories are explained below along with the readiness scales on the following pages to provide users of this story with a clear understanding of how the system works.

Field readiness level:

Maker readiness level:

User readiness level:

Technology readiness level:

These categories and measures are captured in the small tables with each entry of this story.

What makes a product ‘field ready’?

Field ready's Readiness Level Likert-Type Scale

Five criteria determine the level of an items field readiness.

Essential:

Quality & Safety Checked:

Easy to use:

Robust:

Replicable:

How is ‘maker readiness’ measured?

This category indicates the level of complication in ‘making’ (i.e. manufacturing or fabricating) a particular item. It captures a sense of the degree of knowledge, skill, technical input, and sophistication of tools and equipment needed to reproduce the item. All levels are relative.

1 - Expert

2 - Very Hard



3 - Hard



4 - Normal



5 - Easy



What makes a product ‘user ready’?

Five criteria determine the level of an item’s user readiness

Field ready's Readiness Level Likert-Type Scale

Commonly used or needed:

Meets or exceeds standards and/or user demands:

In existing catalogs:

Suitable replacements alright:

Desirable:

What indicates ‘technology readiness’?

Technology readiness is a measure referring to the stage of an items maturity. Our Technology readiness considerations are based on a scale of 1-5 and take into consideration safety concerns. Please refer to the scale on each item.

1 - Basic

2 - Proof of Concept

3 - Working Prototype

4 - Tested but more work needed

5 - Proven Tech

How is the degree of ‘risk’ measured?

A number of questions are used to assess risk for both those used in making the item and, especially, the end user:

What are the hazards involved?

What are the vulnerabilities?

What are the severity and likelihood?

What are the control and mitigation measures?

Additional considerations?

Based on these questions, it’s possible to determine a Likert-type scale with a rating from 1 to 5 as follows:

Important Note

Field Ready does not undertake work that is very high risk. The organization undertakes a documented risk assessment for all items it considers making and carefully follows a detailed procedure to ensure the safety for those concerned. Further, the organization does not make or distribute items that are medically invasive or have other noted risk concerns.

Page data
License CC-BY-SA-4.0
Language English ()
Related 0 subpages, 0 pages link here
Views 4 page views (analytics)
Created August 24, 2026 by Charles Vincent Barrete
Last edit August 24, 2026 by StandardWikitext bot