AEM Electrolyzer setup (3 cell version)

Safety Training Requirements

Safety Instructions

1. Always protect your eyes and skin

In this setup, 1M KOH solution serves as the electrolyte. KOH is alkaline and, while not considered dangerous, it can irritate the skin and eyes. Avoid prolonged contact with the skin and keep the electrolyte away from your eyes. If the electrolyte comes into contact with your eyes or skin, promptly rinse it off with plenty of cold water. If any discomfort persists, seek medical attention to prevent any potential issues. To avoid problems,

2. Always apply accurate voltage to the electrolyzer

This electrolyzer membrane is highly sensitive to voltage. The recommended voltage is 2V per cell and 6V for this setup. Under no circumstances should this voltage level be exceeded, as it may result in membrane damage.

3. Avoid being electrocuted

4. Always keep the membrane hydrated

5. Prevent accumulation of explosive hydrogen and oxygen gases

When there is inadequate ventilation and high concentrations of hydrogen and oxygen gases are mixed, a highly flammable and explosive mixture can form. A single spark between a power clamp and an electrode can result in a violent explosion, with the fire burning at approximately 4280 °F (2360 °C), potentially causing serious injuries.

To prevent the accumulation of explosive hydrogen and oxygen gases, please follow these precautions:

6. Keep the electrolysis setup undisturbed

Electrolysis process should be carried out in the mentioned designated location. For relocation,

Working Environment

Temperature

Ventilation

Hazardous material and electrical equipment

Care

Cleaning

Please follow these steps to regularly change the electrolyte and clean the setup (after 16 hours of electrolyzer operation):

AEM Electrolyzer

  1. Location: FAST laboratory, Room TEB 06, Thomson Engineering Building, Western University, London, Ontario, Canada
  2. Vendor: Cipher Neutron
Contact details
  • Name: Cipher Neutron
  • Address: 501 Alliance Ave, Toronto, ON M6N 2J1
  • Phone: +1 647 803 0002
  • Email: info@cipherneutron.com
  • Website: cipherneutron.com/

3. AEM Electrolyzer specifications:

Installation & Maintenance

Installation process:

Electrolyte changing requirement:

Operation & Procedure

Follow these steps for operating and shutting down the system safely:

  1. Activate the ventilation system: Before starting the system, ensure that the ventilation system is functioning properly, and check for any accumulated hydrogen inside the fume hood.
  2. Power up the pump supply and inspect the water flow: Start by turning on the pump and examine the water flow through the electrolyzer. The voltage supply knob should already be set at 10V, which is suitable for this system. If the water flow appears to be low, gradually increase the voltage if necessary.
  3. Check for any leaks: Verify that there are no leaks in the electrolyzer's pipes. Proceed to the next stage only after confirming everything is leak-free.
  4. Activate the stack power supply: Turn on the power supply and slowly increase the supply voltage and current. Initially, set the voltage to 6V and adjust the current to its maximum, allowing for a current of 14-15A, depending on the temperature. Use a multi-meter to measure the voltage across the stack. Although the DC voltage supply is fixed at 6V, there will be some voltage drop in the wires. Adjust the voltage to ensure that the voltage across the stack remains at 6V. At this stage, hydrogen should be produced in the system, so always ensure that there isn't an excessive accumulation of hydrogen inside the fume hood.
  5. Monitor temperature: While the system is in operation, continuously monitor the temperature and ensure that the temperature remains well below 70 degrees at all times.
  6. Shutdown procedure: When shutting down the system, first slowly reduce the power supply to the stack to zero. Then, check the system's temperature. Do not turn off the pump until the system's temperature has decreased to room temperature. Allow the pump to continue running, and as soon as the temperature has reduced, turn off the pump and unplug all power supplies from the wall outlets

References

    Page data
    Keywords safety, laboratory
    License CC-BY-SA-4.0
    Organizations FAST
    Language English ()
    Translations Turkish, Chinese
    Related 2 subpages, 4 pages link here
    Views 136 page views (analytics)
    Created October 21, 2023 by Md. Motakabbir Rahman
    Last edit September 18, 2025 by 190.150.146.164