Our project consisted of creating a new rainwater catchment system located at the pharmacy in Las Malvinas. Our group made the appropriate calculations and developed an easily accessible rainwater catchment system that captures, filters, and distributes water that can be used by the local community. It is our goal that available rainwater can be captured efficiently and filtered sufficiently to be used for a variety of other purposes, thus providing the community with a cost effective solution to their water shortage, with the cost of the materials listed below.
This appropriate technology project is located in the Dominican Republic in the Las Malvinas neighborhood of Santo Domingo. The team includes 3 students from Cal Poly Humboldt and 4 students from UNIBE and is taking place in the month of June, 2014. Concurrent to the project, the Humboldt State students are taking classes at UNIBE in Santo Domingo. The classes are focused on appropriate technology and engineering and are paired with one Spanish class. The system in Las Malvinas is a new rainwater catchment system which has been developed using spare parts from the La Yuca System.
Our objective for the water project for the 2014 Practivistas Dominicana Program at the Las Malvinas pharmacy is to design a new catchment system using spare parts from previous systems and make non-potable water readily available for the community.
Here is the link for the information we collected to help us understand and review information that will allow us to build the appropriate rainwater catchment system in Las Malvinas for the 2014 practivistas dominicana program.
An Interactive Map for Las Malvinas.
The table below shows the cost table for the pharmacy's rainwater catchment system in Las Malvinas.
| Material | Quantity | Unit Cost (DOP) | Total Cost (DOP) |
|---|---|---|---|
| PVC Gutter [9 ft.] | 2 | 1600 | 3200 |
| Botellon [5 gal.] | 1 | 195 | 195 |
| Botellon PVC adapter [2] | 1 | 31.12 | 31.12 |
| Botellon PVC adapter [4] | 1 | 60.00 | 60.00 |
| Botellon PVC adapter [6] | 1 | 80.00 | 80.00 |
| Bag of nuts [25 mm.] | 1 | 92.00 | 92.00 |
| Bag of bolts [40mm.] | 1 | 67.00 | 67.00 |
| Outdoor L-brackets | 3 | 320 | 960 |
| Metal mesh for botellon [6 Yrd.] | 1 | 48.12 | 48.12 |
| Gutter connector | 2 | 168.00 | 336.20 |
| 90 degree turn for gutter | 1 | 520.10 | 520.10 |
| Total Cost | 5,589.54 | ||
This system needs maintenance year-round to ensure that everything works properly and stays clean, especially when taking into account cleanliness of a potable system.
Weekly
Monthly
Yearly/Biyearly
To replace filters refer to this table to find AQUA TEC:
AQUA TEC SRL La Julia Santo Domingo de Guzman 10107 Republica Dominicana info@aquatec.com.dom 809-732-1572 http://www.aquatec.com.do
Here is a quick run-through of the Las Malvinas system.