No edit summary
No edit summary
Line 1: Line 1:
{{Template:the Hyphae Journal}}
{{Template:the Hyphae Journal}}


[[image:Steel Orca Painting|Concept drawing of Steel Orca data center]]
[[image:Steel orca painting|Concept drawing of Steel Orca data center]]


Hyphae was selected as the Design Architect and Design Engineer for a new  6-acre data center in Pennsylvania.
Hyphae was selected as the Design Architect and Design Engineer for a new  6-acre data center in Pennsylvania.

Revision as of 23:42, 8 October 2010

File:Steel orca painting

Hyphae was selected as the Design Architect and Design Engineer for a new 6-acre data center in Pennsylvania. We were given 3 weeks to develop a conceptual design, and here is what we came up with!

A project statement and more detailed breakdown of our design will be coming soon…. project specific You can dig a little deeper into the project, by visiting our project specific research blog This blog, is a way for our design team to share ideas, inspiring images,cutting edge technologies, case studies and data center systems. It gives you a little window into our design process, but is only a small fraction of our obsessive research process.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.