Project Evaluation Criteria

The following Criteria will be used to assess the success of this project. These criteria were chosen based on the suggestions of the project coordinator as well as the diligent students who are working on the catchment system. The scale (1-10) represents the importance level of meeting the constraint of each listed criteria.

Criteria Constraints Weight
(1-10)
Safety Meets or exceeds OSHA standards
10
Aesthetics Current aesthetic
7
Maintainability 1 year
8
Usability 10 foot radius of water usability
9
Sustainability 100% made up of reused materials
6
Water Catchment percent 95% caught to overflow
7
Cost CCAT budget 2018
10
Community access Anyone can access the water
9
Lifespan/ durability 5 years durability
10