This special page shows all uploaded files.

File list
Date Name Thumbnail Size Description Versions
14:16, 14 February 2013 Plastic-hinge-opening-roof.JPG (file) 60 KB We took this after lifting the roof off the dome to the ground, before disassembly and moving it to another location for storage. Johan is "waving" the panels on their hinges. 1
14:14, 14 February 2013 Plastic-hinge-complete.JPG (file) 66 KB Hexayurt up after painful struggle with roof that we assembled on top of the wall rather than the ground. Don't do that! 1
14:13, 14 February 2013 Plastic-hinge-opening-close.JPG (file) 50 KB The opening plastic hinge is attached with screws and staples to the OSB on one side and a small dimension stick on the other, about 10x20mm. Then holes are drilled in the stick every 30cm which go through the mating OSB. Through these holes, machine scre 1
14:09, 14 February 2013 Flatroof.JPG (file) 42 KB Johan standing by plastic hinge. Balancing the flattened roof on the wall and then lifting it into a cone was a big mistake. As always, build the roof on the ground, then lift it onto the wall. Our third person had to leave before we could get the roof a 1
13:01, 11 April 2012 Hexayurts variations.jpg (file) 344 KB Larger number of variations possible. Even more modifications are possible. Keep searching! The creator of the hexayurt, has put everything about it, including this image, into the public domain. 1
Cookies help us deliver our services. By using our services, you agree to our use of cookies.