Template:ENGR215inprogress

Team Burke der Miester's Final Design of RIPSAW.

Abstract

The purpose of this project is to design a safe bridge tester system that is able to measure the strength and endurance of bridges under pressure in pounds per square inch. Through the Engr215 Introduction to Design class at Humboldt state University, students from Team Burke der Meister: Chris Corona, Trevor Herron, Oliver Ruiz Hurtado, Drew White; designed a bridge tester machine that will be integrated into the engineering section of the STEAM Program at Zane Middle school for projects and competitions.

Background

Zane Middle School introduced the STEAM program in the fall of 2013 that allowed students to include Science, Technology, Engineering, Art and Math into their already existing curriculum. The uniqueness of the STEAM program allows students to be exposed to design electives for real world situations. Zane Middle School came to the Humboldt State University Engineering Department in the spring of 2014 with the intent to improve their STEAM program.

Problem statement and criteria

The objective of the Engineering 215 group, Bürke der Meister, is to design a system able to test the strength and endurance of student built bridges by applying distributed force along the model bridge deck. The machine will measure the amount of pressure a student's bridge can withstand before breaking. This allows the students to record this data and use it in calculations and report writing.

Total Design Hours for completion of RIPSAW.
Table-1: Weighted Criteria
Criteria Weight Constraints
Safety 10 The bridge tester should include a safety switch to prevent injuries.
Functionality 10 The machine must be easily operated and work every time while providing consistent pressure readings.
Educational Value 9 Information gathered from measurements and calculations will be utilized by the STEAM program appropriate for 6th to 8th grade education.
Durability 8 The machine must be constructed with materials to ensure proper use for 10 years and withstand long periods of inactivity.
Mobility 8 The machine will have wheels for easy transportation and must be able to fit through doors.
Cost 6 Each material for the project must not exceed 25 dollars in cost and must stay under the specified budget of 400 dollars.
Up-Cycle 5 50 percent of all materials used will be from recycled or reused products.
Aesthetics 4 The bridge tester needs to portray the purpose of design and have the appearance of a well-built professional project.
McElroy Compact Chain Sidewinder.

Description of final project

RIPSAW shown above generates mechanical pressure from the McElroy sidewinder shown to the right which allows for pressures upwards of 600 psi to be applied to the model bridge decks. The sidewinder dimensions are 21.4”x 12.5”x 10.25” and allow for 18” of travel on the drive screw assembly. The sidewinder comprises of a load cell measurement system and integrated dry pressure gauge to display the desired pressure. The threaded drive screw assembly is controlled by the operator and can be moved up and down to a desired height. Once in position, the drive screw assembly is rotated by the knob clockwise to apply gradual pressure and counter-clockwise to relieve pressure. The McElroy sidewinder is bolted to a fabricated C-bracket frame and C-channel platform to ensure stability. The dimensions of the channel platform are 3’x 6”x ½” and is welded to two 12”x 12” x 1/4” iron plate to support the base of the model bridges. The C-bracket runs 3” out from the back of the C-channel and up 17.7” and 14” across the top where the sidewinder is mounted. The sidewinder and frame assembly are bolted to moveable cart that comprise of caster wheels with dimensions 24”x 18”x 42”. The dimensions of RIPSAW allow for the complete assembly to be easily stored and maneuvered for Zane Middle School teachers.

Cost

The bridge tester items, purchase size, quantity of items, team cost, individual retail cost and total cost of the final design bridge tester are summarized below in Table 1, Table 2, and Table 3.

Table-1: Bridge Tester Materials
Bridge Tester Item Purchase Size Quantity Team Cost Individual Retail Cost
McElroy Sidewinder (10.25inx12.5inx21.4in) 1 Donated $1,583.00
Iron Plate (12inx12in) 2 Donated $145.90
Cart with Wheels (24inx18inx42in) 1 Donated $106.99
Square Tubing (48inx1.5inx1.5) 4 Donated $34.24
Rectangle Tubing (72inx1.5inx0.75in) 1 Donated $20.94
C-Channel (25inx6inx2in) 1 Donated $20.50
Black Spray Paint 12 oz. 1 $8.49 $8.49
Red Spray Paint 12 oz. 1 $8.49 $8.49
Matte Clear Coat 12 oz. 2 $4.99 $4.99
Bolts (3/8inx3in) 2 $0.85 $0.85
Nuts (3/8in) 2 $0.23 $0.23
Washers (3/8in) 6 $0.23 $0.23
Total - - $30.50 $2190.99
Table-2: Bridge Material Cost
Bridge Materials Purchase Size Quantity Team Cost Individual Retail Cost
Fishing Line 1500 yards (50lb Test) 1 Donated $117.99
Popsicle Sticks 1000 Pack 2 $5.99 $5.99
Popsicle Sticks 100 Pack 1 $3.49 $3.49
Dowels 8 Pack 5 $2.99 $2.99
Wood Glue 4 oz. 4 $2.49 $2.49
Fine Sand Block (4.8inx2.9inx1in) 1 $2.15 $2.15
Bass Wood (36inx3inx1/16in) 8 $1.79 $1.79
Total - - $56.85 $174.84


Table-3: Maintenance Cost in Hours per Year
Task Hours
Dust Equipment 0.5
Lube Wheels 0.5
Clear Coat Protection 1.0
New Black Spray paint coat 1.5
Total Task Hours 3.5

Testing Results

To test the final design created, each team member made several types of bridges. These bridges were made with the same equipment and materials that would be available to the students that will be making bridges to be tested. Different variations of bridges were constructed to test the flexibility of bridge design the machine could effectively test. RIPSAW was able to successfully test and break each of the bridge type while giving accurate information about how much pressure each one of them could take. All of these tests gave us a good inclination that the machine operated the way it is supposed to.

Table-4: Testing Results
Test Bridge Type Pressure (PSI)
1 Truss 270
2 Arch 100
3 Girder 600
4 Suspension 275

How to Build

File:tools_used.JPG
How to Replicate RIPSAW

Discussion and next steps

Several obstacles arose during the development process of our design that impacted the final design. Many changes to the design occurred to accommodate the various criteria and constraints.

The solution of “Project RamRod,” which scored the highest on the Delphi matrix, had a lot of components that were going to be donated. An integral part of the design is the pump that supplies pressure to the ram. This pump is powered by Alternating Current, which allows it to be plugged directly into the wall socket. This specific pump that was supposed to be donated was no longer available. This meant that we would have to buy a pump and this did not meet our cost constraint for the project.

Different alternatives to using the pump were considered, one of which would include an air compressor that that would serve the same purpose. While the air compressor would serve the same function as the pump, it created more obstacles to overcome. The air compressor that could be used was powered by direct current. This meant that in addition to replacing the parts from the compressor that needed it, e.g. the connecting hoses, more parts would have to be located and purchased in order to achieve the constraint of durability. A tickle charger would have to be applied to the power source, a battery, to increase the lifespan of the battery. Another solution researched was to purchase an inverter. An inverter converts Direct Current to Alternating Current. Once again this solution created problems with achieving the cost constraint.

While gathering materials for the project, Rick White, Gas Operations Manager with PG&E, had a piece of equipment that is no longer in operation and donated it to the project to be repurposed. This job specific piece of equipment would in fact take the place of several different components of the design. By using the McElroy Sidewinder, the need for a power supply source, pressure gauge, ram, and pump would no longer be necessary. All of the electrical components to the design would be obsolete. The acquisition of the mechanism would have the biggest impact on the specifications of the final design.


Video

Error in widget YouTube: Unable to load template 'wiki:YouTube'

References

Template:Reflist

Blockley, David, (2010). "Bridges : The Science and Art of the World's Most Inspiring Structures." Oxford University Press. Oxford, GBR. ALL TRUSSED UP: Interdependence creates emergence. 111-48.

Boon G, (2011). “Basic Arch Popsicle Stick Bridge” Garrets’ Bridges, <https://www.garrettsbridges.com/store/#!/~/product/category=1358006&id=7715481> (Feb. 26 2014).

Brown, David, (1993). Bridges. Macmillan Publishing Company, New York.

Carson, Rachel, (2004). “The Arch Bridge.” <http://www.makingthemodernworld.org.uk/learning_modules/maths/02.TU.03/?section=4> (Feb 22, 2014).

Chiari & Partner ZT GmbH, (2014). "C250 DU 09.05 - HSR Taiwan." FCP. FCP Fritsch, Chiari & Partner ZT GmbH, <http://www.fcp.at/en/projects/c250-du-0905-hsr-taiwan>. (Feb 25, 2014).

Degenkolb, O, (1977). Concrete Box Girder Bridges, 1st ed., American Concrete Institute, Detroit, Michigan.

Gasparini, D.A, (2006). "Time-Dependent Behavior of Posttensioned Wood Howe Bridges: Journal of Structural Engineering."132(3) 418-429.

Gradek, D. R, (1977). "A Comparative Analysis between the Gas Metal Arc (GMAW) Welding Process and the Shielded Arc (Stick) Welding Process." M.A. thesis, Humboldt State University, Arcata, CA.

Greene, Jr, Gary, S, and Graybeal, B, (2010). "FHWA Research Program on Lightweight High Performance Concrete." FHWA Research Program on Lightweight High Performance Concrete. Federal Highway Administration. <http://www.hpcbridgeviews.com/i60/Article3.asp>. (Feb 25, 2014).

Herrick, C. N, (1975). Electrical Wiring: Principles and Practices. Prentice-Hall Inc., eds., Englewood Cliffs, NJ.

Meier, E, (2014). “Basswood.” The Wood Data Base <http://www.wood-database.com/lumber-identification/hardwoods/basswood/> (Feb. 26 2014).

N.A, (1995). “Interesting Facts about Balsa Wood.” East Coast Model Center <http://www.mat.uc.pt/~pedro/aeromodelismo/artigos/techbal.html> (Feb. 26 2014).

N.A, (2011). “The Bridge.” SYSTEMS AND CONTROL. <http://www.resistors-and-diodes-and-picchips-oh-my.co.uk/?p=1440>(Feb 20, 2014).

N.A, (2012). Educational Innovations, Inc. <http://www.teachersource.com/product> (Feb. 26 2014).

N.A, (2013). “How to Test Your Model Bridge”. Garrett’s Bridges Fun Based Learning. <http://www.garrettsbridges.com/testing/how-to-test-your-model-bridge/> (Feb 22, 2013).

N.A, (2013). “KELVIN© Bridge & Tower Tester with Analog Display.” <http://www.kelvin.com/Merchant2/merchant.mvScreen=PROD&Product_Code=840833&Category_Code=ENSTST&Product_Count=0> (Feb 22, 2014).

N.A, (2014). “Bridge Building Kits and Testers.” Midwest Technology Products. <http://www.midwesttechnology.com/categories/Technology-Products/Construction-%26-Engineering/Bridge-Building-Kits-%26-Testers/> (Feb 22, 2014).

N.A, (2014). “Construction - Types of Bridges.” World Steel Association. <https://www.worldsteel.org/steel-by-topic/construction.html> (Feb 22, 2014).

N.A, (2014). “How a Plasma Cutter Works.” <http://www.plasma-cutter.com/technical.htm> (May 2, 2014)

N.A, (2014). K’nex Building Worlds Kids Love, <http://www.knex.com/info/about-KNEX/> (Feb. 26 2014).

N.A, (2014). Pitsco Education<http://www.pitsco.com/Pulley_Bulley_Bridge_Tester> (Feb 22, 2014).

N.A, (2014). RLT Industries <http://www.rlt.com/20131> (Feb. 26 2014).

N.A, (N.D.). “History of Bridges.” <http://www.historyofbridges.com/facts-about-bridges/arch-bridges/ (Feb. 22, 2014).>

N.A, (N.D.). “The Rainbow Bridge”. <http://www.niagarafallslive.com/rainbow_bridge.htm> (Feb. 25, 2014).

N.A. (2014). “Welcome to Zane Middle School.” http://www.eurekacityschools.org/index.php?option=com_content&view=article&id=50&Itemid=141 (May 2, 2014)

Ririen, (2011). "Three World’s Longest Bridges in China." Public Holidays Festivals Calendar. <http://publicholiday.org/calendar/longest-bridges-in-china/>. (Feb 25, 2014).

Sánchez, T, (2009). “Dramatic Bridge Provides a Natural Crossing- Designing and Building the Landmark David Kreitzer Lake Hodges Bicycle Pedestrian Bridge.” Structural Engineer. <http://www.gostructural.com/print-magazinearticle-dramatic_bridge_provides_a_nat-7918.html> (Feb 22, 2014).

Sgambi, Luca, (2012). "Computer-Aided Civil and Infrastructure Engineering: Genetic Algorithms for theDependability Assurance in the Design of a Long-Span Suspension Bridge" Volume 27, Pages 655-672.

T. J, and Alia, ( 2010) "Projek Satu Dunia (One World Project)™." : King Fahd Causeway, <http://projeksatudunia.blogspot.com/2010/05/king-fahd-causeway.html>. (Feb 25, 2014).

Tang, Man Chung, (2007). “Civil Engineering: Rethinking Bridge Design” Volume: 77, Pages 38-45. Unkown, (2013). Girder Bridge, 1st ed. <http://www.inti.gob.ar/cirsoc/pdf/puentes_acero/Bridges.pdf> (Feb 25, 2014).

Voo, Y. L, Augustin, P. C, Thamboe, T, A. J, (2012). “design and construction of a 50m single span Ultra-High Performance Ductile Concrete composite road bridge” International Journal of Sustainable Construction Engineering & Technology. 3(1).

Warring, R. H, (1984). Pumps: Selection, Systems and Applications. Gulf Publishing Company, eds., Houston, TX.

N.A. (2014). “Definition of Cuircuit.” <http://www.merriam-webster.com/dictionary/circuit> (May 2, 2014)

N.A. (2014). “How to Tie a String Line.” <http://home-building.wonderhowto.com/how-to/tie-string-line-215309/> (May 2, 2014)

Elmer’s Products Inc. (2014) “X-Acto Deluxe Hobby Tool Set.” <http://xacto.com/products/cutting-solutions/knife-sets/knife-sets/Deluxe-Hobby-Tool-Set.aspx> (May 2, 2014)


N.A. (2014). “Welcome to Zane Middle School.” http://www.eurekacityschools.org/index.php?option=com_content&view=article&id=50&Itemid=141(May 2, 2014)

Cookies help us deliver our services. By using our services, you agree to our use of cookies.