The Rock Root J.A.S. Figure 1 project was designed for the [http://worldshelters.org/home World Shelters Foundation] from the Spring 2010 "Intro to Design" class at [http://www.humboldt.edu/engineering/ Humboldt State University]. Team HERE ON EARTH has proposed to use concrete rubble as an anchor to hold fast the original Just Add Sticks (J.A.S.) design. The Rock Roots design is being proposed to World Shelters to be used as a shelter for refugees, particular in Haiti.
The Rock Root J.A.S. (Figure 1) design project was constructed for the [http://worldshelters.org/home World Shelters Foundation] from the Spring 2010 "Intro to Design" class at [http://www.humboldt.edu/engineering/ Humboldt State University]. Team HERE ON EARTH has proposed to use concrete rubble as an anchor to hold fast the original shelter design. The Rock Roots design is being proposed to World Shelters to be used as a shelter for refugees, particular in [[Haiti]].


=Background=
=Background=
On Tuesday, 12 January 2010 a magnitude 7 earthquake hit Haiti approximately 25 km west of the capital
On Tuesday, 12 January 2010 a magnitude 7.0 earthquake hit Haiti approximately 25 km west of the capital
with catastrophic results.<ref name="Hurricane">2010 Haiti Earthquake. Wikipedia. Retrieved April 26, 2010. http://en.wikipedia.org/wiki/Haiti_Earthquake</ref> The Haitian Government reported that an estimated 230,000 people had died,
with catastrophic results.<ref name="Hurricane">2010 Haiti Earthquake. Wikipedia. Retrieved April 26, 2010. http://en.wikipedia.org/wiki/Haiti_Earthquake</ref> The Haitian Government reported that an estimated 230,000 people had died,
300,000 had been injured and 1,000,000 had been left homeless.<ref name="Hurricane"></ref> World Shelters immediately sprang into
300,000 had been injured and 1,000,000 had been left homeless.<ref name="Hurricane"></ref> World Shelters has taken a steps to aid the citizens of Haiti.Their goal is to implement a new structure that was easy to install and withstand a class 1 hurricane, thus the Just Add Sticks (J.A.S.) structure was designed.
action and started working with aid organizations going to Haiti. The goal was to implement a new structure that was easy to install and withstand a class 1 hurricane, thus the Just Add Sticks (J.A.S.) structure was designed.


The J.A.S. structure was developed by World Shelters as a low cost and compact shelter kit. It is a transitional
The J.A.S. structure was developed by World Shelters as a low cost and compact shelter kit. It is a transitional
Line 18: Line 17:


=Problem Statement=
=Problem Statement=
HERE ON EARTH's mission was to retrofit the current design of the J.A.S. (Just Add Sticks) structure to make it capable of withstanding a class one hurricane. This retrofit was to be low cost, use a minimal amount of materials, and be easily implemented into the current design.
HERE ON EARTH's mission was to retrofit the current design of the J.A.S. (Just Add Sticks) structure to make it capable of withstanding a Class One<ref>http://www.nhc.noaa.gov/sshws_statement.shtm</ref> hurricane. This retrofit was to be low cost, use a minimal amount of materials, and be easily implemented into the current design.


==Criteria==
==Criteria==
The criteria listed below are the guide lines specified by the client, World Shelters. The Rock Roots J.A.S. structure is designed according to the criteria.
{| class="wikitable sortable"
{| class="wikitable sortable"
|-
|-
Line 70: Line 70:


=Final Design Details=
=Final Design Details=
The final solution used a combination of anchors (Figure 2) and drainage system (Figure 3). To protect against flooding series of French drains filled with crushed rubble that drain into a drywells, was implemented. To protect against wind a series of anchors are installed to the structure. The French drains channel the water into the drywells. The drywells allow the water to drain below the topsoil. Two anchors are attached by nylon cord to each joint and buried into the French drains. These anchors sufficiently hold the structure to the ground.
The final solution used a combination of anchors (Figure 2) and a drainage system (Figure 3). To protect against flooding, a series of French drains filled with crushed rubble to redirect water, was implemented. To protect against wind, a series of buried anchors are installed to the structure's corner joints. The French drains channel the water into the drywells; drywells allow the water to drain below the topsoil. Two anchors are attached by nylon cord to each joint and buried into the French drains. These anchors sufficiently hold the structure to the ground *see testing results.


<gallery>
<gallery>
Line 90: Line 90:
|align="right"| 9.09
|align="right"| 9.09
|align="right"| 100
|align="right"| 100
|align="right"| 0
|align="right"| 0.00
|-
|-
| Zip Ties
| Zip Ties
Line 102: Line 102:
|align="right"| 1.55
|align="right"| 1.55
|align="right"| 31.00
|align="right"| 31.00
|align="right"| 0
|align="right"| 0.00
|-
|-
|Screws (self taping)
|Screws (self taping)
Line 114: Line 114:
|align="right"| 0.11
|align="right"| 0.11
|align="right"| 16.50
|align="right"| 16.50
|align="right"| 0
|align="right"| 0.00
|-
|-
|Gas (Gallon)
|Gas (Gallon)
Line 131: Line 131:
= Testing Results  =
= Testing Results  =


Team Here on Earth tested the J.A.S. based on water and wind. The water testing was primarily brought to us by nature which dumped 2.3' of water into the french drains (NOAA). This water was efficiently redirected into the 3.5ft drywells.  
Team Here on Earth tested the J.A.S. based on water and wind. The water testing was primarily brought to us by nature which dumped 2.3' of water into the french drains<ref>National Atmosphere and Ocean Administration (2010). &lt;http://www.nhc.noaa.gov/HAW2/english/high_winds.shtml&gt; (2/22/10).</ref>. This water was efficiently redirected into the 3.5ft drywells. To imitate wind a 3:1 pulley system attached to a weight scale was used to apply a load in 50lb increments until the bamboo bent at 225lb pressure per node. The Rock Root J.A.S. design implements sufficiently held the structure in-place. However, the cut bamboo did not hold up to the stress created by the pulley system.
To test wind endurance a 3:1 pulley system attached to a weight scale was used to apply a load in 50lb increments until the bamboo bent at 225lb pressure per node.
 
<center>
<center>
<gallery caption="Load Testing Results">
<gallery caption="Load Testing Results">
Line 141: Line 139:
Image:BambooResults.jpg|Figure 7: 225lb load destruction
Image:BambooResults.jpg|Figure 7: 225lb load destruction
</gallery>
</gallery>
{{#widget:YouTube|id=QmLjl9Gk1oI}}</center>
 
===Testing===
The following video shows the Rock Root J.A.S. testing. Adding a 3:1 pulley system to test different incremented wind loads.
</center>
<center>{{#widget:YouTube|id=QmLjl9Gk1oI}}</center>
 
For more information, please read the final document, composed by team Here on Earth:[http://openpario.mime.oregonstate.edu/attachments/1909/Rock_Root_JAS_FINAL.pdf Final Project Doc]


= Next Step =
= Next Step =
Line 147: Line 151:
The bamboo failed in testing the J.A.S. design. The anchors held the base in place and the french drains redirected water to prevent flooding. When building the J.A.S. team Here on Earth used quarter pieces (~3' diameter) for the skeleton of the structure. The testing has proven the quarter piece bamboo too weak.  
The bamboo failed in testing the J.A.S. design. The anchors held the base in place and the french drains redirected water to prevent flooding. When building the J.A.S. team Here on Earth used quarter pieces (~3' diameter) for the skeleton of the structure. The testing has proven the quarter piece bamboo too weak.  


Team Here on Earth recommends using half or full, non-split bamboo, as well as, conducting further testing of the structure and components including any changes to the J.A.S. design
Team Here on Earth recommends using half or full, non-split bamboo, as well as, conducting further testing of the structure and components including any changes to the J.A.S. design.


= References =
= References =
Line 154: Line 158:
*Armand (2010,) World Shelters, Personal communication,(February 25, 2010).  
*Armand (2010,) World Shelters, Personal communication,(February 25, 2010).  
*Kurt Thurkelson (2010), World Shelters, Personal communication, (February 25, 2010).  
*Kurt Thurkelson (2010), World Shelters, Personal communication, (February 25, 2010).  
*National Atmosphere and Ocean Administration (2010). &lt;http://www.nhc.noaa.gov/HAW2/english/high_winds.shtml&gt; (2/22/10).


[[Category:Engr215_Introduction_to_Design]]
[[Category:Engr215_Introduction_to_Design]]
[[Category:Engr215 World Shelters]]
[[Category:World Shelters]]
[[Category:Haiti]]
[[Category:Projects]]
[[Category:Videos]]
[[Category:Appropriate technology videos]]
[[Category:Construction and materials videos]]
[[Category:Engineering videos]]

Revision as of 17:27, 24 March 2013

Figure 1: Full J.A.S. structure

Here on Earth Design

The Rock Root J.A.S. (Figure 1) design project was constructed for the World Shelters Foundation from the Spring 2010 "Intro to Design" class at Humboldt State University. Team HERE ON EARTH has proposed to use concrete rubble as an anchor to hold fast the original shelter design. The Rock Roots design is being proposed to World Shelters to be used as a shelter for refugees, particular in Haiti.

Background

On Tuesday, 12 January 2010 a magnitude 7.0 earthquake hit Haiti approximately 25 km west of the capital with catastrophic results.[1] The Haitian Government reported that an estimated 230,000 people had died, 300,000 had been injured and 1,000,000 had been left homeless.[1] World Shelters has taken a steps to aid the citizens of Haiti.Their goal is to implement a new structure that was easy to install and withstand a class 1 hurricane, thus the Just Add Sticks (J.A.S.) structure was designed.

The J.A.S. structure was developed by World Shelters as a low cost and compact shelter kit. It is a transitional design to provide permanent housing for its users. The kit provides 192 sq. ft. of shelter. The J.A.S. structure was an inexpensive design and utilized the surrounding resources, however, it was not hurricane resistant. Team HERE ON EARTH consists of Wesley Nickerman, David Wittmers, Chetco Jamgochian, and Jamie Larrabee.

Problem Statement

HERE ON EARTH's mission was to retrofit the current design of the J.A.S. (Just Add Sticks) structure to make it capable of withstanding a Class One[2] hurricane. This retrofit was to be low cost, use a minimal amount of materials, and be easily implemented into the current design.

Criteria

The criteria listed below are the guide lines specified by the client, World Shelters. The Rock Roots J.A.S. structure is designed according to the criteria.

Criteria Description Weight
Durability Withstand a high winds, general wear and tear from normal use over a 3 year 9
Cost Additional cost should be to a minimum. 5
Transportability Easy to move 3
Ease of Mass Production Easily and effectively produced and assembled. 6
Safety:Wind Withstand high speed winds 10
Safety:Water Reduce the water within the structure 8.5
Safety:Fire Reduce fire hazards 2.5
Safety:Earth Withstand seismic loads 7.5
General Safety Safety for public 5
Aesthetics Culturally appropriate 4

Final Design Details

The final solution used a combination of anchors (Figure 2) and a drainage system (Figure 3). To protect against flooding, a series of French drains filled with crushed rubble to redirect water, was implemented. To protect against wind, a series of buried anchors are installed to the structure's corner joints. The French drains channel the water into the drywells; drywells allow the water to drain below the topsoil. Two anchors are attached by nylon cord to each joint and buried into the French drains. These anchors sufficiently hold the structure to the ground *see testing results.

Costs

Item Quantity Price/Item ($) Total Cost ($) Price Paid ($)
Bamboo 11 9.09 100 0.00
Zip Ties 160 0.11 17.26 10.79
Corrugated Plastic Joints 20 1.55 31.00 0.00
Screws (self taping) 100 0.10 10.00 10.00
Nylon Chord (ft) 150 0.11 16.50 0.00
Gas (Gallon) 5 3.17 15.85 15.85
Total: $190.49 $36.52

Testing Results

Team Here on Earth tested the J.A.S. based on water and wind. The water testing was primarily brought to us by nature which dumped 2.3' of water into the french drains[3]. This water was efficiently redirected into the 3.5ft drywells. To imitate wind a 3:1 pulley system attached to a weight scale was used to apply a load in 50lb increments until the bamboo bent at 225lb pressure per node. The Rock Root J.A.S. design implements sufficiently held the structure in-place. However, the cut bamboo did not hold up to the stress created by the pulley system.

Testing

The following video shows the Rock Root J.A.S. testing. Adding a 3:1 pulley system to test different incremented wind loads.

Error in widget YouTube: Unable to load template 'wiki:YouTube'

For more information, please read the final document, composed by team Here on Earth:Final Project Doc

Next Step

The bamboo failed in testing the J.A.S. design. The anchors held the base in place and the french drains redirected water to prevent flooding. When building the J.A.S. team Here on Earth used quarter pieces (~3' diameter) for the skeleton of the structure. The testing has proven the quarter piece bamboo too weak.

Team Here on Earth recommends using half or full, non-split bamboo, as well as, conducting further testing of the structure and components including any changes to the J.A.S. design.

References

  1. 1.0 1.1 2010 Haiti Earthquake. Wikipedia. Retrieved April 26, 2010. http://en.wikipedia.org/wiki/Haiti_Earthquake
  2. http://www.nhc.noaa.gov/sshws_statement.shtm
  3. National Atmosphere and Ocean Administration (2010). <http://www.nhc.noaa.gov/HAW2/english/high_winds.shtml> (2/22/10).
  • Armand (2010,) World Shelters, Personal communication,(February 25, 2010).
  • Kurt Thurkelson (2010), World Shelters, Personal communication, (February 25, 2010).
Cookies help us deliver our services. By using our services, you agree to our use of cookies.