The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 778: | Line 778: | ||
The design cost measured in hours, shown in the Figure below, displays the hours spent on each step of the design process. The estimated time to replicate one 8-foot section of Life Support is 8 hours for 4 people. This is based on the time Team Food On Deck projects that a high school graduate could replicate one 8 foot section using detailed instructions. | The design cost measured in hours, shown in the Figure below, displays the hours spent on each step of the design process. The estimated time to replicate one 8-foot section of Life Support is 8 hours for 4 people. This is based on the time Team Food On Deck projects that a high school graduate could replicate one 8 foot section using detailed instructions. | ||
[[File:DesignCosts.png|frame| | [[File:DesignCosts.png|frame|500px|center]] | ||
== Troubleshooting == | == Troubleshooting == |