No edit summary
Line 207: Line 207:




==Construction==
===Construction===
*Water Pump
==Water Pump==
**Instructions  
{{How to
|title= H2O Pump
|header1=
|header2=
|pics=
|size=
|File:Default.png |Materials ||PVC.
| | | |
| | | |
| | | |
| | | |
|footer= Footer
}}
=Instructions=
 
 
{{How to
|title=How to Do Something
|File:Bpack bike trailer - demo 1.jpg |Backpack frame bike trailer |1 |Do something.
|File:Aleiha dish.jpg |Aleiha's parabolic solar cooker |2 |Do something really complicated that really isn't.
|||3 |Do something really complicated that really isn't that takes up lots of space and goes all the way across the page...
}}
 
{{How to
|pics=no
||||Do something with no pictures!
|footer=Don't forget!  :-)
}}
 
{{How to
|header1=Figure
|header2=Caption
|Image:EfieldSolarCell.jpg|||Fig 1: is a diagram that shows the workings of a solar cell's electric field. ...
}}
 
*PVC Frame
*PVC Frame
**Instructions
**Instructions
Below is a list of how to build our earthen oven.
{{How to
|title= Title
|header1=
|header2=
|pics=
|size=
|File:Default.png |Caption |1 |Do something.
| | | |
| | | |
| | | |
| | | |
|footer= Footer
}}
{{How to
|title=How to Do Something
|File:Bpack bike trailer - demo 1.jpg |Backpack frame bike trailer |1 |Do something.
|File:Aleiha dish.jpg |Aleiha's parabolic solar cooker |2 |Do something really complicated that really isn't.
|||3 |Do something really complicated that really isn't that takes up lots of space and goes all the way across the page...
}}
{{How to
|pics=no
||||Do something with no pictures!
|footer=Don't forget!  :-)
}}
{{How to
|header1=Figure
|header2=Caption
|Image:EfieldSolarCell.jpg|||Fig 1: is a diagram that shows the workings of a solar cell's electric field. ...
}}
*Drum Frame
*Drum Frame
**Instructions
**Instructions
Below is a list of how to build our earthen oven.
{{How to
|title= Title
|header1=
|header2=
|pics=
|size=
|File:Default.png |Caption |1 |Do something.
| | | |
| | | |
| | | |
| | | |
|footer= Footer
}}
{{How to
|title=How to Do Something
|File:Bpack bike trailer - demo 1.jpg |Backpack frame bike trailer |1 |Do something.
|File:Aleiha dish.jpg |Aleiha's parabolic solar cooker |2 |Do something really complicated that really isn't.
|||3 |Do something really complicated that really isn't that takes up lots of space and goes all the way across the page...
}}
{{How to
|pics=no
||||Do something with no pictures!
|footer=Don't forget!  :-)
}}
{{How to
|header1=Figure
|header2=Caption
|Image:EfieldSolarCell.jpg|||Fig 1: is a diagram that shows the workings of a solar cell's electric field. ...
}}
*Inlet/Outlet system
*Inlet/Outlet system
**Instructions
**Instructions
Below is a list of how to build our earthen oven.
{{How to
|title= Title
|header1=
|header2=
|pics=
|size=
|File:Default.png |Caption |1 |Do something.
| | | |
| | | |
| | | |
| | | |
|footer= Footer
}}
{{How to
|title=How to Do Something
|File:Bpack bike trailer - demo 1.jpg |Backpack frame bike trailer |1 |Do something.
|File:Aleiha dish.jpg |Aleiha's parabolic solar cooker |2 |Do something really complicated that really isn't.
|||3 |Do something really complicated that really isn't that takes up lots of space and goes all the way across the page...
}}
{{How to
|pics=no
||||Do something with no pictures!
|footer=Don't forget!  :-)
}}
{{How to
|header1=Figure
|header2=Caption
|Image:EfieldSolarCell.jpg|||Fig 1: is a diagram that shows the workings of a solar cell's electric field. ...
}}
==Testing==
==Testing==



Revision as of 01:34, 21 April 2014

Template:305inprogress

The bog

Abstract

Short abstract describing the project from background to conclusion

Background

The project is an initiative by New York artist and sculptor Mary Mattingly, who designs sustainable installations and alternative living models. The WetLand bog can provide sustenance, promote increased water quality, provide habitat and will serve as a working educational platform. WetLand bog is designed to inspire environmentally friendly means to meet the challenges of coming generations. WetLand bogs seek to serve as a model for potential sustainable resource expansion and development.

Problem statement

The objective of this project is to design a floating bog to provide inspirational awareness of sustainable environmental design. The floating bog will be placed in the Delaware River alongside the WetLand facility. The floating bog will be used throughout the duration of the WetLand project in the summer of 2014.

Project Evaluation Criteria

The following Criteria will be used to assess the success of this project. These criteria were chosen based on input from the artist and the team of students who are working on the bog. The scale (1-10) represents the importance level of meeting the constraint of each listed criteria. 10 has the largest magnitude and weight decrease numerically in descending order.

Criteria Constraints Weight
(1-10)
Budget Must be between $600-$1,000.
10
Aesthetics Compliment the installation and increase appeal.
9
Vegetation Plants must be adequate for the Delaware River regional climate, water quality, and be able to endure as it moves to New York.
10
Education Educational aspect compliments the overall theme of the project.
7
Reproducibility Can be easily recreated with readily available materials.
8
Functionality Utilize the appropriate and most efficient water purifying and oxygen adding plants.
9
Materials Recyclable materials preferred obtained from the Philadelphia area.
9
Maintenance Be easily maintained with little to no expertise.
7

Budget

The project will require a variety of new and re-purposed materials. Many of the new materials were purchased from local business and used materials were gathered from a variety of locations throughout Arcata, CA. Donated items include PVC, lifeguard bouy, nylon rope and 2"x4" wood. Donators are listed as 'source' in table.

Quantity Material Source Cost ($) Project Cost ($) Total ($)
1 50 gallon drum Water Planet Garden Supply 32.38 32.48 32.48
2 check valve Ace Hardware 9.99 19.98 19.98
2 3/4" PVC nipple Ace Hardware 0.99 1.98 1.98
2 1.5" sch 40 Slip Cap Ace Hardware 1.50 3.89 3.89
1 small screws (20) Ace Hardware 1.99 1.99 1.99
20 washers Do it Best 0.17 3.40 3.40
4 90* 1x1/2 PVC Do it Best 2.45 0.00 0.00
2 small screws Do it Best 1.19 2.38 2.38
1 12' nylon rope Donated 5.00 0.00 0.00
1 Lifeguard Bouy Donated 15.00 0.00 0.00
1 2"x4"x28" wood Donated 3.68 0.00 0.00
2 1" Bulkhead fitting Bayside Garden Supply 9.95 19.90 19.90
1 1" Barbed insert to 1" Bayside Garden Supply 0.55 1.10 0.00
1 Barbed Insert Elbow Bayside Garden Supply 0.55 1.10 1.10
1 1" Black Tubing - 1" Bayside Garden Supply 1.45 1.45 1.45
Total Cost $91.59

Timeline

March

  • March 2, 2014- create timeline and finish budget
  • March 06-11, 2014- gather materials: plastic bottles, coconut fiber, boat, and some plants. Contact potential donors.
  • March 12, 2014- assemble materials: prototype 1 final sketch up, gather rest of materials as necessary
  • March 15, 2014- begin initial testing and monitor of prototype 1 begins.
  • March 20-30, 2014- monitor of first prototype in either Fern Lake, or Arcata march.


April

  • April 4, 2014– monitor continues, move on to second prototype planning if failure of first prototype.
  • April 9, 2014- build second prototype; finalize schematics with client.
  • April 12, 2014– begin writing instruction manual
  • April 19, 2014– continue monitoring, and have East coast resources for the “WetLand project” where they could gather materials.
  • April 23, 2014- make video
  • April 28, 2014- final monitoring
  • April 31, 2014- clean up and dis-assemble prototypes


May

  • May 1, 2014- Final project reports
  • May 11, 2014- final timeline
  • May 12, 2014- project presentation

Design

  • Water Pump
    • Materials
      • 1 1x1/2"x30" PVC
      • 1 1x1/2" PVC cap
      • 1 1"x36" PVC
      • 1 1" t-joint
      • 1 can PVC glue
      • 2 1"x4" PVC
      • 2 1" PVC cap
      • 2 1x1/2 rubber o-rings
      • 2 3/4" check valves
      • 1 1x1/2"male coupling
      • 2 3/4" PVC nipple
      • 1 3/4" t-joint
      • 2 3/4" male threaded couplings
  • PVC Frame
    • Materials
      • 14’x1(1/2)” PVC pipe
      • 4 (1(1/2)”)x 90 degree fittings
      • PVC glue
      • PVC saw tools
      • 2 (size) small Buoys
      • Duct tape
      • rope line
  • Drum Frame
    • Materials
      • 55 gallon drum
      • sawing/cutting tools
      • Nails _(size) (#)_
      • Wood (sizes) (#)
  • Inlet/Outlet system
    • Materials
      • 2 (3/4") caps
      • 4 (3/4”) x 90 degree fittings
      • 3/4” T-Valve
      • 3/4” PVC pipe
      • 1 (3/4”) hoes fitting
      • 1 (3/4”) nipple threaded


Construction

Water Pump

File:Default.png
H2O Pump

Instructions

File:Bpack bike trailer - demo 1.jpg
How to Do Something
Image:EfieldSolarCell.jpg
  • PVC Frame
    • Instructions

Below is a list of how to build our earthen oven.

File:Default.png
Title
File:Bpack bike trailer - demo 1.jpg
How to Do Something
Image:EfieldSolarCell.jpg
  • Drum Frame
    • Instructions

Below is a list of how to build our earthen oven.

File:Default.png
Title
File:Bpack bike trailer - demo 1.jpg
How to Do Something
Image:EfieldSolarCell.jpg
  • Inlet/Outlet system
    • Instructions

Below is a list of how to build our earthen oven.

File:Default.png
Title
File:Bpack bike trailer - demo 1.jpg
How to Do Something
Image:EfieldSolarCell.jpg

Testing

Plants

  • Rush
  • Sedges

Tools

  • Hack saw
  • Tape measure
  • Skill saw
  • Hammer
  • Saw-all
  • Extension Cord
  • Metal Clippers
  • Clamps
  • Wood Chisel
  • Screw Gun
  • Markers
  • Chalk line
  • 2(1/4)" drill bit
  • 3/16" drill bit

Maintenance

Literature Review

Information on USDA legal status plants. [1]

2.City of Philadelphia. Invasive Plant List [[1]]

3.http://www.floatingislandinternational.com/

4. Delaware River Basin Commission. 2012 Delaware River and Bay Water Quality Assessment.

5. Philadelphia Water Department. 2006. "Tidal Wetland", Andropogon Associates LTD. http://www.phillywatersheds.org/doc/ERU_4_Tidal_Wetland.pdf

6.Stebb, Chriss. 2013. Building Floating Wetlands to Restore Urban Waterfronts and Community Partnership. National Wetlands Newsletter. March 2013

7. Clemson University. Floating Treatment Systems, Report. 2008

8.Tyler Kimberly, Ruan Michelle. 2012. “Edible and Medicinal Plants”, SUNY Plattsburgh, NY. http://edibleandmedicinalplants.weebly.com/index.html. (February 6, 2014)

9. Among the Stately Trees, wordpress. (2013). “The top 75 Wetland Plants”, Lehigh University. http://amongthestatelytrees.wordpress.com/2013/04/16/the-top-75-wetland-plants/. (February 9, 2014)

10. Moore, Peter D.. (2001). Wetlands. New York: Facts on File.

11. Kulser, Jon A; Kentula, Mary E. 1990. Wetland Creation and Restoration. The Status of the Science.

12. Keddy, Paul A. 2010. Wetland Ecology. Principles and Conservation. 2nd edition.

13. Mitsch, Willam J; Gosselink, James G. 2007. Wetlands 4th Edition.

References

Template:Reflist

Cookies help us deliver our services. By using our services, you agree to our use of cookies.