No edit summary
Line 55: Line 55:
! Quantity !! Material !! Source !! Cost ($) !! Project Cost ($) !! Total ($)
! Quantity !! Material !! Source !! Cost ($) !! Project Cost ($) !! Total ($)
|-
|-
| 1 || boat || Humboldt Area Saltwater Anglers
| 1 || 50 gallon drum || Water Planet Garden Supply
|align="right"| 173.00
|align="right"| 32.38
|align="right"| 0.00
|align="right"| 32.48
|align="right"| 0.00
|align="right"| 32.48
|-  
|-  
| 1.5k || plastic bottles|| dumpster
| 2 || check valve || Ace Hardware
|align="right"| 1.00
|align="right"| 9.99
|align="right"| 0.00
|align="right"| 19.98
|align="right"| 0.00
|align="right"| 19.98
|-
|-
| 50 || plants || Mother nature
| 2 || 3/4" PVC nipple || Ace Hardware
|align="right"| 0.00
|align="right"| 0.99
|align="right"| 0.00
|align="right"| 1.98
|align="right"| 0.00
|align="right"| 1.98
|-
|-
| 2 || 300yds netting || Ace Hardware
| 2 || 1.5" sch 40 Slip Cap || Ace Hardware
|align="right"| 1.50  
|align="right"| 1.50  
|align="right"| 20.00
|align="right"| 3.89
|align="right"| 20.00
|align="right"| 3.89
|-
|-
| 6 || 90* elbows || Piersons
| 1 || small screws (20) || Ace Hardware
|align="right"| 1.45
|align="right"| 1.99
|align="right"| 9.23
|align="right"| 1.99
|align="right"| 9.23
|align="right"| 1.99
|-
|-
| 4 || 1"x6' pvc || Piersons
| 20 || washers || Do it Best
|align="right"| 4.45
|align="right"| 0.17
|align="right"| 18.73
|align="right"| 3.40
|align="right"| 18.73
|align="right"| 3.40
|-
|-
| 1 || 5 gallon bucket || Piersons
| 4 || 90* 1x1/2 PVC || Do it Best
|align="right"| 2.45  
|align="right"| 2.45  
|align="right"| 0.00
|align="right"| 0.00
|align="right"| 0.00
|align="right"| 0.00
|-
|-
| 1 || coconut fiber || Humboldt Hydroponics
| 2 || small screws || Do it Best
|align="right"| 32.45
|align="right"| 1.19
|align="right"| 32.45
|align="right"| 2.38
|align="right"| 32.45
|align="right"| 2.38
|-
|-
| 15 || buoys || Humboldt Area Saltwater anglers
| 1 || 12' nylon rope || Donated
|align="right"| 5.00
|align="right"| 0.00
|align="right"| 0.00
|-
| 1 || Lifeguard Bouy || Donated
|align="right"| 15.00  
|align="right"| 15.00  
|align="right"| 0.00
|align="right"| 0.00
|align="right"| 0.00
|align="right"| 0.00
|-
|-
| 1 || PVC glue || Ace Hardware
| 1 || 2"x4"x28" wood || Donated
|align="right"| 4.45
|align="right"| 3.68
|align="right"| 4.45
|align="right"| 0.00
|align="right"| 4.45
|align="right"| 0.00
|-
| 32 qt || soil || Ace Hardware
|align="right"| 20.00
|align="right"| 20.00
|align="right"| 20.00
|-
|-
|-class="sortbottom"
|-class="sortbottom"
|colspan="5" align="right" | '''Total Cost'''  
|colspan="5" align="right" | '''Total Cost'''  
|align="right"| '''$100.41'''  
|align="right"| '''$66.10'''  
|}
|}



Revision as of 06:01, 15 April 2014

Template:305inprogress

Background

The project is an initiative by New York artist and sculptor Mary Mattingly who advocates for sustainable practices and alternative living methods. The WetLand “wetland” will create a sustainable, livable environment that meets the challenges of coming generations dealing with overpopulation, lack of resources, and decrease of usable land that alleviates as an alternative living model.

Problem statement

The objective of this project is to design a floating wetland to provide inspirational awareness of sustainable environmental design. The floating wetland will be placed in the Delaware River alongside the WetLand facility. The floating wetland will be used throughout the duration of the WetLand project in the summer of 2014.

Project Evaluation Criteria

The following Criteria will be used to assess the success of this project. These criteria were chosen based on input from the artist and the team of students who are working on the wetland. The scale (1-10) represents the importance level of meeting the constraint of each listed criteria. 10 has the largest magnitude and weight decrease numerically in descending order.

Criteria Constraints Weight
(1-10)
Budget Must be between $600-$1,000.
10
Aesthetics Compliment the installation and increase appeal.
9
Vegetation Plants must be adequate for the Delaware River regional climate, water quality, and be able to endure as it moves to New York.
10
Education Educational aspect compliments the overall theme of the project.
7
Reproducibility Can be easily recreated with readily available materials.
8
Functionality Utilize the appropriate and most efficient water purifying and oxygen adding plants.
9
Materials Recyclable materials preferred obtained from the Philadelphia area.
9
Maintenance Be easily maintained with little to no expertise.
7

Budget

The project will require a variety of new and used materials. Many of the new materials were purchased from local business and used materials were gathered from a variety of locations throughout Arcata, CA. Donated items include 1 boat, many plants, and a five gallon bucket. Donators are listed as 'source' in table.

Quantity Material Source Cost ($) Project Cost ($) Total ($)
1 50 gallon drum Water Planet Garden Supply 32.38 32.48 32.48
2 check valve Ace Hardware 9.99 19.98 19.98
2 3/4" PVC nipple Ace Hardware 0.99 1.98 1.98
2 1.5" sch 40 Slip Cap Ace Hardware 1.50 3.89 3.89
1 small screws (20) Ace Hardware 1.99 1.99 1.99
20 washers Do it Best 0.17 3.40 3.40
4 90* 1x1/2 PVC Do it Best 2.45 0.00 0.00
2 small screws Do it Best 1.19 2.38 2.38
1 12' nylon rope Donated 5.00 0.00 0.00
1 Lifeguard Bouy Donated 15.00 0.00 0.00
1 2"x4"x28" wood Donated 3.68 0.00 0.00
Total Cost $66.10

Timeline

March

  • March 2, 2014- create timeline and finish budget
  • March 06-11, 2014- gather materials: plastic bottles, coconut fiber, boat, and some plants. Contact potential donors.
  • March 12, 2014- assemble materials: prototype 1 final sketch up, gather rest of materials as necessary
  • March 15, 2014- begin initial testing and monitor of prototype 1 begins.
  • March 20-30, 2014- monitor of first prototype in either Fern Lake, or Arcata march.


April

  • April 4, 2014– monitor continues, move on to second prototype planning if failure of first prototype.
  • April 9, 2014- build second prototype; finalize schematics with client.
  • April 12, 2014– begin writing instruction manual
  • April 19, 2014– continue monitoring, and have East coast resources for the “WetLand project” where they could gather materials.
  • April 23, 2014- make video
  • April 28, 2014- final monitoring
  • April 31, 2014- clean up and dis-assemble prototypes


May

  • May 1, 2014- Final project reports
  • May 11, 2014- final timeline
  • May 12, 2014- project presentation


Literature Review

Some information on USDA legal status plants. [1]

2.City of Philadelphia. Invasive Plant List [[1]]

3.http://www.floatingislandinternational.com/

4. Delaware River Basin Commission. 2012 Delaware River and Bay Water Quality Assessment.

5. Philadelphia Water Department. 2006. "Tidal Wetland", Andropogon Associates LTD. http://www.phillywatersheds.org/doc/ERU_4_Tidal_Wetland.pdf

6.Stebb, Chriss. 2013. Building Floating Wetlands to Restore Urban Waterfronts and Community Partnership. National Wetlands Newsletter. March 2013

7. Clemson University. Floating Treatment Systems, Report. 2008

8.Tyler Kimberly, Ruan Michelle. 2012. “Edible and Medicinal Plants”, SUNY Plattsburgh, NY. http://edibleandmedicinalplants.weebly.com/index.html. (February 6, 2014)

9. Among the Stately Trees, wordpress. (2013). “The top 75 Wetland Plants”, Lehigh University. http://amongthestatelytrees.wordpress.com/2013/04/16/the-top-75-wetland-plants/. (February 9, 2014)

10. Moore, Peter D.. (2001). Wetlands. New York: Facts on File.

11. Kulser, Jon A; Kentula, Mary E. 1990. Wetland Creation and Restoration. The Status of the Science.

12. Keddy, Paul A. 2010. Wetland Ecology. Principles and Conservation. 2nd edition.

13. Mitsch, Willam J; Gosselink, James G. 2007. Wetlands 4th Edition.