No edit summary |
No edit summary |
||
Line 26: | Line 26: | ||
! Purchase Date | ! Purchase Date | ||
! Quantity | ! Quantity | ||
! Cost | ! Cost ($) | ||
! Total Cost | ! Total Cost ($) | ||
|- | |- | ||
| Curtis D.C. 24-36V 400A motor controller | | Curtis D.C. 24-36V 400A motor controller | ||
Line 35: | Line 35: | ||
| 202.50 | | 202.50 | ||
|- | |- | ||
| | | Advanced DC Motors 24v | ||
| | | 2008-12-11 | ||
| | | 1 | ||
| | | 103.00 | ||
| | | 103.00 | ||
|- | |- | ||
| Item | | Item | ||
Line 51: | Line 51: | ||
| | | | ||
! Total | ! Total | ||
! $ | ! $205.50 | ||
|} | |} | ||
== Discussion == | == Discussion == | ||
Line 68: | Line 68: | ||
== Contact details == | == Contact details == | ||
[[User:jthiller|Joey Hiller]] | |||
[[Category:Projects]] | [[Category:Projects]] | ||
<layout name="Project" /> | <layout name="Project" /> |
Revision as of 03:57, 12 December 2008
ABSTRACT
Introduction
The goal of this project is to build an electric at a relatively low [American] cost. Typically electric cars are sold to the public at prices ranging from roughly $40,000[1] to $109,000[2]. This leaves many people unable to afford these new, more energy efficient vehicles, and are left to cope with a wild petroleum market. However, with a little time and at an affordable cost, an electric car can be built that is capable of fulfilling most daily commutes or errands.
Understanding the Market
Project Requirements
Design
Describe your design here.
next level heading
Costs
Item | Purchase Date | Quantity | Cost ($) | Total Cost ($) |
---|---|---|---|---|
Curtis D.C. 24-36V 400A motor controller | 2008-12-11 | 1 | 202.50 | 202.50 |
Advanced DC Motors 24v | 2008-12-11 | 1 | 103.00 | 103.00 |
Item | Date | # | Cost | Total Cost |
Total | $205.50 |
Discussion
Your discussion.
Next Steps
The next steps.
Conclusions
Your conclusions.
References
Contact details
Joey Hiller <layout name="Project" />