Line 16: Line 16:


*Short-Span Truss Bridge Design, Spring 2011<br>
*Short-Span Truss Bridge Design, Spring 2011<br>
[http://users.humboldt.edu/curbanczyk/engr215/TrussProject_Document.pft Design Document]<br>
[http://users.humboldt.edu/curbanczyk/engr215/TrussProject_Document.pdf Design Document]<br>
[http://users.humboldt.edu/curbanczyk/engr215/TrussBridgePres.pdf Presentation]<br>
[http://users.humboldt.edu/curbanczyk/engr215/TrussBridgePres.pdf Presentation]<br>


Line 27: Line 27:


*Groundwater Remediation at Humboldt State University: Natural Attenuation, November/December 2010<br>
*Groundwater Remediation at Humboldt State University: Natural Attenuation, November/December 2010<br>
[http://users.humboldt.edu/curbanczyk/engr215/NaturalAttenuationPP_115.pdf]<br>
[http://users.humboldt.edu/curbanczyk/engr215/NaturalAttenuationPP_115.pdf Presentation]<br>
*Webpage for Arcata's Wastewater Treatment Plant, November, 2010<br>
*Webpage for Arcata's Wastewater Treatment Plant, November, 2010<br>
*Building a Rube Goldberg, September 2010<br>
*Building a Rube Goldberg, September 2010<br>

Revision as of 18:15, 25 June 2011

Name:Christina

Biodiversity

Unfortunately, I'm not a hippie, but I try. I love the outdoors, art[[1], and South Park

Interests in Engineering

  • Thermodynamics
  • Renewable energy
  • Sustainable infrastructure (& overall development) in developing countries

Experience in Engineering

  • Short-Span Truss Bridge Design, Spring 2011

Design Document
Presentation

Collaborative Final Document
AutoCAD
Spreadsheet of Time Spent
Project Planning Chart
Sample Memo

  • Groundwater Remediation at Humboldt State University: Natural Attenuation, November/December 2010

Presentation

  • Webpage for Arcata's Wastewater Treatment Plant, November, 2010
  • Building a Rube Goldberg, September 2010
  • Organization of Climate Conference, Spring 2010



Cookies help us deliver our services. By using our services, you agree to our use of cookies.