Line 25: Line 25:


==Equipment or Bill of Materials==
==Equipment or Bill of Materials==
#Blah blah blah
#Furnace
#Inert gas cylinder
#Rubber seals
#Tube metal ends for gas flow
#Gas Tubing
#Thermocouple for temperature verification
 
{{clear}}
{{clear}}
[[Image:Thermometer.jpg|thumb|right|Thermocouple thermometer]]
[[Image:Thermometer.jpg|thumb|right|Thermocouple thermometer]]

Revision as of 15:56, 23 January 2019

Sample photo caption.
You can put an abstract (a brief description of your method) here and the text you would copy into an article.
  1. Blah blah blah
Overview of Thermolyne tube furnace

Introduction

Provide a background on the method - link to wikipedia or elsewhere.

  1. Blah blah blah
Thermolyne Type 54500 High

Temperature Tube Furnace

Safety

  • Safety training for both use of gas cylinders and the labs must be completed.
  • Safety glasses and long pants must be worn at all times.
  • Fume hoods must be on during all operation when gasses are used.
  • Tubes are made out of ceramic material, alumina in his case, and are affected by thermal shock. Therefore, heating rates no more than 10C are allowed.
  • Furnaces are hot during operation, thus only remove samples after they have returned to room temperature.

Equipment or Bill of Materials

  1. Furnace
  2. Inert gas cylinder
  3. Rubber seals
  4. Tube metal ends for gas flow
  5. Gas Tubing
  6. Thermocouple for temperature verification
Thermocouple thermometer

List of necessary components to set up the assembly

Calibration & Tolerances

  1. Blah blah blah
Thermocouple - furnace temperature verification

Programming

  • Multiple programs can be added and run consecutively.
  • The format for programs has three variables(X is the program number):
  1. PrX - the ramp rate in C / minute
  2. PlX - the temperature level in C
  3. PdX - the dwell time in minutes
  • Pressing the programing button will allow cycling of the variables and using the up and down arrows in the input pad will change the magnitude.
  • The program will first ramp at the specified rate to the temperature level and then dwell for a specific time before switching to the next program in numerical order
  • To determine the end point of a heat treatment with any number of set programs, use the down magnitude arrow on the PdX - dwell - variable to signal to the furnace to end procedure

Operation & Procedure

1. First the correct cover gas for heat treatment must be selected. In this example nitrogen gas is used to create an inert environment to prevent oxygen from reaching the samples. While moving cylinders it is imperative to keep the cap on until completely secured where it will be used.

Example gas to use(N2)

2. This is an example of the Primary regulator used on the previous gas cylinder. When in operation this regulator should be completely opened in order to ensure optimum gas flow. The gas volumetric flow will be controlled via a secondary regulator. This is to limit exposure to changing the primary regulator and for increased precision.

Primary regulator used on gas supply

3. The secondary regulator has a metal ball which gains height as the flow of gas increases. The units used do depend on the gas specifically, however it is easy to simply use the height as a relative scale for and measure the gas flow through water and limiting the flow until the correct amount of bubbles is obtained.

Secondary regulator used on gas supply

4. Once the alumina tube has been inserted into the furnace, clamps with a cloth belt are added to the ends. Pictured is the out-gas end. The cloth belt is necessary to distribute the compression force exerted onto the brittle alumina tube.

Tube through view with no ends attached

5. Clamps and cloth belt are also placed on the gas-in side as well as a copper tube to transfer the gas from the cylinder is added. This section will not be replaced through normal testing and should remain connected and sealed at all times.

Gas inlet insulation seal on tube

6.

Rubber seal close up on gas inlet
  1. Blah blah blah
Switch to turn on hood
  1. Blah blah blah
Gas inlet attached and sample view from gas outlet
  1. Blah blah blah
Gas outlet insulation seal on tube
  1. Blah blah blah
Thermocouple and gas outlet with rubber seal
  1. Blah blah blah
Gas outlet into hood top
  1. Blah blah blah
Furnace interface for programming

Shutdown

References

Cookies help us deliver our services. By using our services, you agree to our use of cookies.