Line 17: | Line 17: | ||
===Construction=== | ===Construction=== | ||
====Timeline==== | ====Timeline==== | ||
*Good start | |||
*Add an introduction | |||
*Come up with actual propsed dates as soon as possible | |||
====Costs==== | ====Costs==== | ||
*Fix math - if total $US was what you were aiming for (which is helpful) then make sure you label it as such and also add a total RD$ column | |||
*You won't be including individual costs for each material that goes into the blocks you will use (that's block biz's job) instead I assume we will estimate cost per block and reference the other block team's budget/page |
Revision as of 16:29, 16 June 2014
Notes for Improvement
Abstract
- Abstract should not contain any information that is not mentioned throughought the rest of the project page... it only summarizes (like a research paper)
Background
- Consider revising sentence structure
- Include information from abstract here... abstract should not contain any information that is not mentioned throughought the rest of the project page (like a research paper)
- Include information about who you are and where Las Malvinas is located
Objective
- Be a little more specific (add design and construct)
Criteria
Construction
Timeline
- Good start
- Add an introduction
- Come up with actual propsed dates as soon as possible
Costs
- Fix math - if total $US was what you were aiming for (which is helpful) then make sure you label it as such and also add a total RD$ column
- You won't be including individual costs for each material that goes into the blocks you will use (that's block biz's job) instead I assume we will estimate cost per block and reference the other block team's budget/page