28 April 2011
- 14:4014:40, 28 April 2011 diff hist 0 Rural Electrification Systems →THREE PHASE AC
- 14:4014:40, 28 April 2011 diff hist +8 Rural Electrification Systems →THREE PHASE AC
27 April 2011
- 14:5514:55, 27 April 2011 diff hist −1 Rural Electrification Systems →THE SERVICE GROUND
- 14:5414:54, 27 April 2011 diff hist −1 Rural Electrification Systems →EQUIPMENT SPECIFICATION
- 14:5014:50, 27 April 2011 diff hist 0 Rural Electrification Systems →MAIN OVER CURRENT PROTECTION
- 14:5014:50, 27 April 2011 diff hist +3 Rural Electrification Systems →MAIN OVER CURRENT PROTECTION
- 14:2914:29, 27 April 2011 diff hist +7 Rural Electrification Systems →SOLDERING
- 14:2014:20, 27 April 2011 diff hist +8 Rural Electrification Systems →CONDUCTOR SIZES
- 14:1914:19, 27 April 2011 diff hist +8 Rural Electrification Systems →ELECTRIC SHOCK
- 14:1814:18, 27 April 2011 diff hist +7 Rural Electrification Systems →SAFETY
- 14:0114:01, 27 April 2011 diff hist +20 Rural Electrification Systems →BACKGROUND ESSENTIALS
7 March 2011
- 15:5315:53, 7 March 2011 diff hist +57 Rural Electrification Systems →CONTINUITY TESTER
- 15:5215:52, 7 March 2011 diff hist 0 N File:RE Figure 7.7.jpg No edit summary
- 15:5215:52, 7 March 2011 diff hist 0 N File:RE Figure 7.6.jpg No edit summary
- 15:5115:51, 7 March 2011 diff hist +140 Rural Electrification Systems →DETERMINE A DOWN FUSE
- 15:4915:49, 7 March 2011 diff hist 0 N File:RE Figure 7.5.jpg No edit summary
- 15:4915:49, 7 March 2011 diff hist 0 N File:RE Figure 7.4.jpg No edit summary
- 15:4815:48, 7 March 2011 diff hist 0 N File:RE Figure 7.3.jpg No edit summary
- 15:4815:48, 7 March 2011 diff hist 0 N File:RE Figure 7.2.jpg No edit summary
- 15:4715:47, 7 March 2011 diff hist 0 N File:RE Figure 7.1.jpg No edit summary
- 15:4215:42, 7 March 2011 diff hist −2 Rural Electrification Systems →MATERIAL NEEDS=
- 15:4215:42, 7 March 2011 diff hist +29 Rural Electrification Systems →CONNECTING THE TRANSFORMER TO THE LINE
- 15:4215:42, 7 March 2011 diff hist 0 N File:RE Figure 4.30.jpg No edit summary
- 15:4015:40, 7 March 2011 diff hist +29 Rural Electrification Systems →MOUNTING TRANSFORMERS ON THE POLE
- 15:4015:40, 7 March 2011 diff hist 0 N File:RE Figure 4.29.jpg No edit summary
- 15:3915:39, 7 March 2011 diff hist +28 Rural Electrification Systems →SAGGING LINE CONDUCTORS
- 15:3915:39, 7 March 2011 diff hist +29 Rural Electrification Systems →SAGGING LINE CONDUCTORS
- 15:3715:37, 7 March 2011 diff hist 0 N File:RE Table 4.4.jpg No edit summary
- 15:3715:37, 7 March 2011 diff hist 0 N File:RE Figure 4.28.jpg No edit summary
- 15:3615:36, 7 March 2011 diff hist +89 Rural Electrification Systems →STRINGING THE WIRE
- 15:3515:35, 7 March 2011 diff hist 0 N File:RE Figure 4.27.jpg No edit summary
- 15:3515:35, 7 March 2011 diff hist 0 N File:RE Figure 4.26.jpg No edit summary
- 15:3415:34, 7 March 2011 diff hist 0 File:RE Figure 4.25.jpg uploaded a new version of "File:RE Figure 4.25.jpg"
- 15:2915:29, 7 March 2011 diff hist +59 Rural Electrification Systems →MAKING A SLEEVE JOINT
- 15:2815:28, 7 March 2011 diff hist 0 N File:RE Figure 4.25.jpg No edit summary
- 15:2815:28, 7 March 2011 diff hist 0 N File:RE Figure 4.24.jpg No edit summary
- 15:2815:28, 7 March 2011 diff hist 0 N File:RE Figure 4.23.jpg No edit summary
- 15:2815:28, 7 March 2011 diff hist +28 Rural Electrification Systems →MAKING A SPLICE JOINT
- 15:2715:27, 7 March 2011 diff hist 0 N File:RE Table 4.3.jpg No edit summary
- 15:2715:27, 7 March 2011 diff hist +26 Rural Electrification Systems →MAKING A SPLICE JOINT
- 15:2615:26, 7 March 2011 diff hist 0 N File:RE Figure 4.22.jpg No edit summary
- 15:2515:25, 7 March 2011 diff hist +29 Rural Electrification Systems →TIGHTENING THE GUY AND FASTENING TO THE ANCHOR
- 15:2515:25, 7 March 2011 diff hist 0 N File:RE Figure 4.21.jpg No edit summary
- 15:2415:24, 7 March 2011 diff hist +29 Rural Electrification Systems →DIGGING IN THE ANCHOR
- 15:2415:24, 7 March 2011 diff hist 0 N File:RE Figure 4.20.jpg No edit summary
- 15:2415:24, 7 March 2011 diff hist +65 Rural Electrification Systems →GUYING THE POLE
- 15:2215:22, 7 March 2011 diff hist 0 File:RE Figure 4.18.jpg uploaded a new version of "File:RE Figure 4.18.jpg"
- 15:2115:21, 7 March 2011 diff hist 0 File:RE Figure 4.18.jpg uploaded a new version of "File:RE Figure 4.18.jpg"
- 15:2015:20, 7 March 2011 diff hist 0 File:RE Figure 4.18.jpg uploaded a new version of "File:RE Figure 4.18.jpg"
- 15:1815:18, 7 March 2011 diff hist +31 Rural Electrification Systems →GUYING THE POLE
- 15:1715:17, 7 March 2011 diff hist 0 N File:RE Figure 4.18.jpg No edit summary
- 15:1715:17, 7 March 2011 diff hist +32 Rural Electrification Systems →GUYING THE POLE
- 15:1615:16, 7 March 2011 diff hist 0 N File:RE Figure 4.17.jpg No edit summary
- 15:0815:08, 7 March 2011 diff hist +89 Rural Electrification Systems →GUYING THE POLE
- 15:0515:05, 7 March 2011 diff hist +59 Rural Electrification Systems →POLE SETTING
- 15:0315:03, 7 March 2011 diff hist 0 N File:RE Figure 4.16.jpg No edit summary
- 15:0315:03, 7 March 2011 diff hist 0 N File:RE Figure 4.15.jpg No edit summary
- 15:0315:03, 7 March 2011 diff hist 0 N File:RE Figure 4.14.jpg No edit summary
- 15:0215:02, 7 March 2011 diff hist 0 N File:RE Figure 4.13.jpg No edit summary
- 15:0215:02, 7 March 2011 diff hist 0 N File:RE Figure 4.12.jpg No edit summary
4 March 2011
- 17:2317:23, 4 March 2011 diff hist +90 Rural Electrification Systems →RAISING THE POLE (Pike Method)
- 17:1117:11, 4 March 2011 diff hist 0 N File:RE Figure 4.11.jpg No edit summary
- 17:1117:11, 4 March 2011 diff hist 0 N File:RE Figure 4.10.jpg No edit summary
- 17:1117:11, 4 March 2011 diff hist 0 N File:RE Figure 4.9.jpg No edit summary
- 17:1017:10, 4 March 2011 diff hist +16 Rural Electrification Systems →RAISING THE POLE (Pike Method)
- 17:1017:10, 4 March 2011 diff hist 0 N File:RE Table 4.2.jpg No edit summary
- 17:0917:09, 4 March 2011 diff hist −11 Rural Electrification Systems →DIGGING THE POLE HOLE
- 17:0517:05, 4 March 2011 diff hist +28 Rural Electrification Systems →RAISING THE POLE (Pike Method)
- 17:0417:04, 4 March 2011 diff hist 0 N File:RE Figure 4.8.jpg No edit summary
- 17:0317:03, 4 March 2011 diff hist +27 Rural Electrification Systems →DIGGING THE POLE HOLE
- 17:0317:03, 4 March 2011 diff hist 0 N File:RE Table 4.1.jpg No edit summary
- 17:0017:00, 4 March 2011 diff hist +28 Rural Electrification Systems →ROOFING
- 16:5916:59, 4 March 2011 diff hist 0 N File:RE Figure 4.7.jpg No edit summary
- 16:5916:59, 4 March 2011 diff hist +28 Rural Electrification Systems →POLE PREPARATION
- 16:5816:58, 4 March 2011 diff hist 0 N File:RE Figure 4.6.jpg No edit summary
- 16:5716:57, 4 March 2011 diff hist +28 Rural Electrification Systems →POLE HAULING
- 16:5616:56, 4 March 2011 diff hist 0 N File:RE Figure 4.5.jpg No edit summary
- 16:5616:56, 4 March 2011 diff hist +28 Rural Electrification Systems →LOCATING POLE POSITIONS
- 16:5516:55, 4 March 2011 diff hist 0 N File:RE Figure 4.4.jpg No edit summary
- 16:5216:52, 4 March 2011 diff hist +41 Rural Electrification Systems →MAP MAKING
- 16:5116:51, 4 March 2011 diff hist 0 N File:RE Figure 4.3.jpg No edit summary
- 16:4916:49, 4 March 2011 diff hist +57 Rural Electrification Systems →MAP MAKING
- 16:4816:48, 4 March 2011 diff hist 0 N File:RE Figure 4.2.jpg No edit summary
- 16:4716:47, 4 March 2011 diff hist 0 N File:RE Figure 4.1.jpg No edit summary
- 16:2816:28, 4 March 2011 diff hist +29 Rural Electrification Systems →NAMEPLATE INFORMATION
- 16:2716:27, 4 March 2011 diff hist 0 N File:RE Figure 3.23.jpg No edit summary
- 16:1916:19, 4 March 2011 diff hist +29 Rural Electrification Systems →DROP CORDS
- 16:1816:18, 4 March 2011 diff hist 0 N File:RE Figure 3.22.jpg No edit summary
- 16:1816:18, 4 March 2011 diff hist 0 File:RE Figure 3.21.jpg uploaded a new version of "File:RE Figure 3.21.jpg"
- 16:1616:16, 4 March 2011 diff hist +59 Rural Electrification Systems →FOUR-WAY SWITCHES
- 16:1516:15, 4 March 2011 diff hist 0 N File:RE Figure 3.21.jpg No edit summary
- 16:1516:15, 4 March 2011 diff hist 0 N File:RE Figure 3.20.jpg No edit summary
- 16:1416:14, 4 March 2011 diff hist +29 Rural Electrification Systems →THREE-WAY SWITCHES
- 16:1416:14, 4 March 2011 diff hist 0 N File:RE Figure 3.19.jpg No edit summary
- 16:1416:14, 4 March 2011 diff hist +30 Rural Electrification Systems →SINGLE POLE SWITCHES
- 16:1316:13, 4 March 2011 diff hist 0 N File:RE Figure 3.18.jpg No edit summary
- 16:0516:05, 4 March 2011 diff hist +29 Rural Electrification Systems →SINGLE POLE SWITCHES
- 16:0516:05, 4 March 2011 diff hist 0 N File:RE Figure 3.17.jpg No edit summary
- 16:0016:00, 4 March 2011 diff hist +29 Rural Electrification Systems →ELECTRICAL SYSTEM LAYOUT
- 15:5915:59, 4 March 2011 diff hist 0 N File:RE Figure 3.16.jpg No edit summary
- 15:5915:59, 4 March 2011 diff hist +29 Rural Electrification Systems →CONNECTION OF SWITCH BOXES AND FUSEBOXES
- 15:5815:58, 4 March 2011 diff hist 0 N File:RE Figure 3.15.jpg No edit summary
- 15:5815:58, 4 March 2011 diff hist +29 Rural Electrification Systems →MAIN SWITCH
- 15:5715:57, 4 March 2011 diff hist 0 N File:RE Figure 3.14.jpg No edit summary
- 15:5715:57, 4 March 2011 diff hist +29 Rural Electrification Systems →THE METER
- 15:5615:56, 4 March 2011 diff hist 0 N File:RE Figure 3.13.jpg No edit summary
- 15:4015:40, 4 March 2011 diff hist +40 Rural Electrification Systems →THE SERVICE DROP
- 15:3915:39, 4 March 2011 diff hist 0 N File:RE Figure 3.11 and 3.12.jpg No edit summary
- 15:3815:38, 4 March 2011 diff hist 0 N File:RE Figure 3.11.jpg No edit summary
- 15:3715:37, 4 March 2011 diff hist +29 Rural Electrification Systems →TYPES OF SERVICE
- 15:3615:36, 4 March 2011 diff hist 0 N File:RE Figure 3.10.jpg No edit summary
- 15:3515:35, 4 March 2011 diff hist +29 Rural Electrification Systems →SOLDERLESS CONNECTORS
- 15:3415:34, 4 March 2011 diff hist 0 N File:RE Figure 3.9.jpg No edit summary
- 15:3415:34, 4 March 2011 diff hist +40 Rural Electrification Systems →SOLDERLESS CONNECTORS
- 15:3315:33, 4 March 2011 diff hist 0 N File:RE Figure 3.8.jpg No edit summary
- 15:3215:32, 4 March 2011 diff hist +28 Rural Electrification Systems →SCREW TERMINALS
- 15:3215:32, 4 March 2011 diff hist 0 N File:RE Figure 3.7.jpg No edit summary
- 15:3115:31, 4 March 2011 diff hist +28 Rural Electrification Systems →TAPING
- 15:3015:30, 4 March 2011 diff hist 0 N File:RE Figure 3.6.jpg No edit summary
- 15:2515:25, 4 March 2011 diff hist +28 Rural Electrification Systems →SOLDERING
- 15:2415:24, 4 March 2011 diff hist 0 N File:RE Figure 3.5.jpg No edit summary
- 15:2415:24, 4 March 2011 diff hist +29 Rural Electrification Systems →SPLICING
- 15:2315:23, 4 March 2011 diff hist 0 N File:RE Figure 3.4.jpg No edit summary
- 15:2315:23, 4 March 2011 diff hist +30 Rural Electrification Systems →SPLICING
- 15:2115:21, 4 March 2011 diff hist 0 N File:RE Figure 3.3.jpg No edit summary
2 March 2011
- 15:3815:38, 2 March 2011 diff hist +28 Rural Electrification Systems →CABLES
- 15:3715:37, 2 March 2011 diff hist 0 File:RE Figure 3.2.jpg uploaded a new version of "File:RE Figure 3.2.jpg"
- 15:3215:32, 2 March 2011 diff hist 0 N File:RE Figure 3.2.jpg No edit summary
- 15:0615:06, 2 March 2011 diff hist +32 Rural Electrification Systems →CONDUCTOR SIZES
- 15:0415:04, 2 March 2011 diff hist 0 N File:RE Figure 3.1.jpg No edit summary
1 March 2011
- 17:0617:06, 1 March 2011 diff hist +58 Rural Electrification Systems →TRANSFORMERS
- 17:0517:05, 1 March 2011 diff hist 0 N File:RE Figure 1.18.jpg No edit summary
- 17:0317:03, 1 March 2011 diff hist 0 File:RE Figure 1.17.jpg uploaded a new version of "File:RE Figure 1.17.jpg"
- 15:2615:26, 1 March 2011 diff hist 0 N File:RE Figure 1.17.jpg No edit summary
- 15:2415:24, 1 March 2011 diff hist +30 Rural Electrification Systems →THREE PHASE AC
- 15:2315:23, 1 March 2011 diff hist 0 N File:RE Figure 1.16.jpg No edit summary
- 15:2215:22, 1 March 2011 diff hist 0 File:RE Figure 1.15.jpg uploaded a new version of "File:RE Figure 1.15.jpg"
- 15:2115:21, 1 March 2011 diff hist 0 File:RE Figure 1.14.jpg uploaded a new version of "File:RE Figure 1.14.jpg"
- 15:1515:15, 1 March 2011 diff hist +29 Rural Electrification Systems →THREE PHASE AC
- 15:1015:10, 1 March 2011 diff hist 0 N File:RE Figure 1.15.jpg No edit summary
25 February 2011
- 17:1817:18, 25 February 2011 diff hist +31 Rural Electrification Systems →ALTERNATING CURRENT PRINCIPLES
- 17:1617:16, 25 February 2011 diff hist 0 File:RE Figure 1.14.jpg uploaded a new version of "File:RE Figure 1.14.jpg"
- 17:0917:09, 25 February 2011 diff hist 0 N File:RE Figure 1.14.jpg No edit summary