== Description of final project ==
== Description of final project ==
The area has been level and the soil amended. It is now ready for the installation of an Orchard.
The area has been level and the soil amended. It is now ready for the installation of an Orchard.
Stay Tuned, updates will be posted.
Stay Tuned, updates will be posted.


===Prototyping===
===Prototyping===
{{gallery
{{gallery
|width=180
|width=180
Line 64: Line 66:
|Image:SriverProto2.2.jpg|Side view of 3-D Prototype with irrigation.
|Image:SriverProto2.2.jpg|Side view of 3-D Prototype with irrigation.
}}
}}


=== Costs ===
=== Costs ===
{| class="wikitable sortable"
{| class="wikitable sortable"
|+ '''Table 2. Material Costs'''
|+ '''Table 2. Material Costs'''
Line 94: Line 95:


|}
|}
== Implementation ==
== Implementation ==


Gabion Wall Installation
Gabion Wall Installation
{{gallery
|width=180
|height=135
|lines=2
|Image:OrchardInstallDigging.jpeg|Installation site is excavated
|Image:SriverMeasure.jpeg|Level out and measure excavation
|Image:SriverGabionParts.jpg|Disassembled Gabion Wall
|Image:Sriver2.jpeg|Installed Gabion Wall
|Image:SriverLabor.jpeg|Filling with Stone
|Image:SriverWall4.jpeg|Just before we sealed it off
}}
Grading
{{gallery
{{gallery
|width=180
|width=180
|height=135
|height=135
|lines=2
|lines=2
|Image:OrchardInstallDigging.jpeg| Installation site is excavated
|Image: SriverLabor2.jpg | Preparing on-site soil for amendment for grading
|Image:SriverMeasure.jpeg| Level out and measure excavation
|Image: SriverLine.jpg | Established level for grading
|Image:SriverGabionParts.jpg| Disassembled Gabion Wall
|Image: SriversDirt.jpg | Fill dirt delivered to site
|Image:Sriver2.jpeg| Installed Gabion Wall
|Image: SriverLeveled.jpg | Near leveled orchard site
|Image:SriverLabor.jpeg| Filling with Stone
|Image:SriverWall4.jpeg| Just before we sealed it off
}}
}}



Revision as of 03:52, 8 December 2019

Template:ENGR215inprogress

Abstract

Four engineering students are commissioned by a local high school to help prepare their outdoor space for an orchard. After assessing the site and meeting with the client,the primarily objective was determined to be the preparation of the garden space for the high school seniors landscaping project the following semester.

On-site Team Meeting


Background

As part of the environmental resource engineering major at Humboldt State University students must take ENGR 215, environmental design. For our semester's design projects our client was Six Rivers Charter High School in Arcata, California. The clients primary focus developing their outdoor space into a garden-based learning area, as well as an aesthetically pleasing space for teacher who would want host their class outside. Our group, the Greengineers (Jessica Sheffield, Austin Payne, Taylor Goodwin, and Justin Hawkins) was tasked with preparing the a large terrace for an orchard.

Problem statement and criteria

The 1600 sq. foot space we were given to prepare had three major design constraints.

  1. The terrain was not level, potential safety hazard for a class of thirty students.
  2. The south east corner was open leading to erosion undermining general slope stability.
  3. The soil health was severely compromised by compaction and the addition of low-quality fill dirt to fill the terrace.


Through client feedback we were able to generate the set of design criteria below


Criterion Constraints Weight
Safety Students must not receive more than a superficial injury from area. 8
Education Must be an educational space for agriculture and landscaping high school classes 8
Maintenance No maintenance required over summer and students must be able to maintain landscape throughout school year. 7
Accessibility Path of egress must sustain up to 40 people including highschool students and adults. Space must be simple to navigate. 7
Durability Must sustain heavy rain, 30-40 people within the space, able to withstand local fauna and student interaction. 6
Cost Must not exceed $400.00. 5
Aesthetics Must maintain or exceed schools aethetic standard. 5

Description of final project

The area has been level and the soil amended. It is now ready for the installation of an Orchard. Stay Tuned, updates will be posted.

Prototyping


Costs

Table 2. Material Costs
Quantity Material Source Cost ($) Actual ($)
20 cubic yards. Fill-Dirt Sun Valley Farms 350.00 0.00
10 cubic yards Top Soil Bayside Farm 350.00 0.00
8 ft. Gabion Wall Hilfecker Retainting Walls 326.00 0.00
6 Fruit Tree Miller Farms Nursery 425.00 0.00
Total Actual Cost $0.00


Implementation

Gabion Wall Installation


Grading

Maintenance

Maintenance is most crucial during the first year during which the trees are establishing themselves. Once established ambient participation will be sufficient for the orchard with occasional soil enriching encouraged. Six Rivers Charter High School Landscaping Class is expected too carry out most of the maintenance with occasional supplement maintenance provided during the first summer.

Schedule

Monthly
  • Inspect Irrigation (Most crucial during first year)a monthly task
  • Trim back plant growth between trees


Yearly
  • Harvest Fruit
  • Prune trees to appropriate size
  • Inspect Gabion Wall for Structural
  • Spread Cover Crop seed to promote soil fertility


Every 10-20 years
  • Consider replacing gabion wall

Discussion and next steps

  • Irrigation needs to be installed before summer so the tree can establish themselves.
  • Fencing atop the gabion wall is recommended due to the steep drop off on the other side.
  • Trellis could installed along fence to provide additional growing space for food plants.
  • The removal of the eucalyptus tree shading out the space is strongly encouraged.