(saving template)
 
Line 10: Line 10:


== Problem statement and criteria ==
== Problem statement and criteria ==
Use sortable table.
{| class="wikitable sortable"
|-
!Criteria
!Importance
!Constraints
|-
|Safety
|10
|The railing must be built to Code of Federal Regulation specifications.
|-
|Durability
|9
|The railing must last a least three months.
|-
|Produce Production
|9
|The railing must provide at least 25% of the food for three people per day.
|-
|Ease of Replication
|9
|The design must be simple enough to be replicated by a high school graduate.
|-
|Cost
|8
| The model of the railing must not cost more than $100 per 8-foot section.
|-
|Environmental Justice
|7
|Building materials must be from the Humboldt County, CA waste stream.
|-
|Plant Locality
|6
|Plants must be able to grow in Philadelphia, Pennsylvania.
|-
|Ease of Maintenance
|6
|The railing must be designed so maintenance will only take 30 minutes a day for three people.
|-
|Level of Water Conservation
|5
|The railing must only use 10% of the provided desalinated water.
|-
|Educational Value
|4
|The literature must be accessible to a fourth grader
|-
|Ascetically Pleasing
|4
|The railing must be a mix of organic and synthetic material
|}


== Description of final project ==
== Description of final project ==

Revision as of 02:16, 16 November 2016

Template:ENGR215inprogress

Abstract

One paragraph summary of your project from background to discussion and next steps.

There should be an image near the top.

Background

Problem statement and criteria

Criteria Importance Constraints
Safety 10 The railing must be built to Code of Federal Regulation specifications.
Durability 9 The railing must last a least three months.
Produce Production 9 The railing must provide at least 25% of the food for three people per day.
Ease of Replication 9 The design must be simple enough to be replicated by a high school graduate.
Cost 8 The model of the railing must not cost more than $100 per 8-foot section.
Environmental Justice 7 Building materials must be from the Humboldt County, CA waste stream.
Plant Locality 6 Plants must be able to grow in Philadelphia, Pennsylvania.
Ease of Maintenance 6 The railing must be designed so maintenance will only take 30 minutes a day for three people.
Level of Water Conservation 5 The railing must only use 10% of the provided desalinated water.
Educational Value 4 The literature must be accessible to a fourth grader
Ascetically Pleasing 4 The railing must be a mix of organic and synthetic material

Description of final project

Photos and descriptions. Use gallery.

Include a how to use and maintain section. See the how to template below.


Costs

Use Help:Table_examples#Cost_Table.

Testing Results

How to build

Use Template:How_to

Discussion and next steps

References

See Help:Footnotes for more. Template:Reflist

Cookies help us deliver our services. By using our services, you agree to our use of cookies.