(Created page with '{{Template:Projectinprogress|August 12, 2010}} = Team Micro Hydro = *Meghan Heintz *Jessica Lamb *[[User:Rayrivera|Rachel Rive…')
 
m (Standardize wikitext)
 
(80 intermediate revisions by 12 users not shown)
Line 1: Line 1:
{{Template:Projectinprogress|August 12, 2010}}
[[File:BlackBoxPicture.png|thumb]]


= Team Micro Hydro  =
__NOTOC__


*[[User:MeghanHeintz|Meghan Heintz]]
{{HSU Chiapas Program notice}}
*[[User:Jessica.s.lamb|Jessica Lamb]]
*[[User:Rayrivera|Rachel Rivera]]
*[[User:Mattallan|Matt Allan]]
{{#widget:YouTube|id=0LJkudIRxD0}}
== Project Description  ==


=== Objective/Objetivo ===
Somos un pequeño equipo de estudiantes de licencia en Cal Poly Humboldt trabajando en un proyecto para investigar la factibilidad de construir, instalar, utlizar y mantener un sistema de micro-hídro para proveer la electricidad para una comunidad rural cerca de San Cristóbal de las Casas, Chiapas, México. Las pruebas de la factibilidad van a incluir estudio del poder potencial que se puede extraer de varios ríos y un estudio de las materias disponibles de construcción y costos de operación. Si el estudio de la factibilidad recomienda la implementación, el diseño y la construcción de este proyecto, quizás será implementado por otra parte en un futuro cercano. Tal acción sería coordinado con la comunidad que beneficiaría del sistem de micro-hídro.


We are a small team of Humboldt State University undergraduate students working on a project to investigate the feasibility of constructing, installing, utilizing and maintaining a run-of-the-river micro-hydro system to provide electricity for a rural community near San Cristóbal de Las Casas, Chiapas, Mexico. The feasibility tests will include studies on potential power available from several rivers and a survey of the available building materials and operation costs. If the feasibility study results recommend the implementation, design, and construction of this project, it may be completed by another party in the near future. Such action would be coordinated with the community that would benefit from the micro-hydro system.
<center>


''Somos un pequeño equipo de estudiantes de licencia en Humboldt State University trabajando en un proyecto para investigar la factibilidad de construir, instalar, utlizar y mantener un sistema de micro-hídro para proveer la electricidad para una comunidad rural cerca de San Cristóbal de las Casas, Chiapas, México. Las pruebas de la factibilidad van a incluir estudio del poder potencial que se puede extraer de varios ríos y un estudio de las materias disponibles&nbsp;de construcción y costos de operación. Si el estudio de la factibilidad recomienda la implementación, el&nbsp;diseño y la construcción de este proyecto,&nbsp;quizás será implementado por otra parte en&nbsp;un futuro cercano. Tal acción sería coordinado con la comunidad que beneficiaría del sistem de micro-hídro.''
{{Video|0LJkudIRxD0}}


</center>


&nbsp;[[Image:BlackBoxPicture.png|thumb|center]]
=== Antecedentes ===


===  ===
El poder hidroeléctrico ya es un método comun de generar energia en México.Lo constituye 26.2% de la electricidad del país, pero es generado principalmente por presas grandes que causan daños a los ecosistemas que rodean los ríos.<ref>Islas, J., F. Manzini, and M. Martinez, "Cost-benefit analysis of energy scenarios for the Mexican power sector," ''Energy'' 28 (2002): 979-992.</ref> La meta de este proyecto era investigar la factibilidad de los sistemas de micro-hídro, cuales por definición generan menos electricidad pero tienen un más benévolo impacto medioambental. Las comunidades autónomas y el terreno montañoso de Chiapas parezcan indicar circunstancias positivas para el poder micro-hídro. El descenso en la elevación quizás provea la cantidad de caída necesaria para generar suficiente energía de un sistema del poder&nbsp;microhídro.


=== Background/Antecedentes  ===
Aunque Chiapas sigue siendo uno de los estados más pobres de México, el estado contribuye una gran porción de la electricidad del país. Desafortunadamente, sólo 8% de los usuarios de la electricidad constituye para 50% del uso eléctrico del estado porque la Comisión Federal de la Electricidad (CFE) impone tarifas a comunidades que no pueden pagar para poder eléctrico.<ref>"Electrical Energy in Mexico and Chiapas: Rights, Resistances and Privatization," ''Maderas del Pueblo del Sureste, A.C.'' (July 2007): http://www.maderasdelpueblo.org.mx/pdf/DocENERGIA%20ELECTRICA%20MEXICO%20Y%20CHIAPAS.pdf</ref> Por eso, muchas cercanas comunidades Zapatistas y autónomas están en resistencia de pagar para la electricidad y han aprendido mantener sus propios cables de la luz.<ref>Public denouncement of government tariff increases, ''Pueblos Unidos en Defensa de la Energia Eléctrica'' (23 November 2008)</ref> Tales comunidades pueden por consiguiente beneficiar de la independencia aumentada aportado del poder micro-hídro para sus requirimientos de la luz, refrigeración de las medicinas y mantenimiento de los sistemas de comunicación.<br>


Hydro power is already a common method of energy generation in Mexico. Mexico's total installed power capacity from the year 2000, which utilized 20% of the Mexican Energy Supply (6368 PJ) was 36,697 MW. The capacity profile was: fuel oil 38.9%; hydro electricity 26.2%; natural gas 15.7%; coal 7.1%; dual 5.7%; nuclear 3.7%; geothermal 2.3%; 0.3% diesel. Hydro power provides 26.2% of Mexico's electricity, but mainly from large dams that greatly disrupt the ecosystems surrounding the rivers.<ref>Islas, J., F. Manzini, and M. Martinez, "Cost-benefit analysis of energy scenarios for the Mexican power sector," ''Energy'' 28 (2002): 979-992.</ref> The aim of this project is to investigate run-of-the-river hydro power systems which generate less electricity but have a more benign environmental impact. The autonomous communities and the mountainous terrain of Chiapas appear to indicate positive circumstances for micro-hydro power. The drop in elevation may provide the amount of head necessary for sufficient energy generation from a micro-hydro power system.
==== Las Alternativas de la Energía Locales ====


Although Chiapas remains one of Mexico´s poorest states, it contributes a great portion of the country´s electricity. Unfortunately, only 8% of the electricity users account for 50% of the state´s electricity use because the Federal Electricity Commission (EFC) levies tariffs on communities that cannot afford to pay for electric power.<ref>"Electrical Energy in Mexico and Chiapas: Rights, Resistances and Privatization," ''Maderas del Pueblo del Sureste, A.C.'' (July 2007): http://www.maderasdelpueblo.org.mx/pdf/DocENERGIA%20ELECTRICA%20MEXICO%20Y%20CHIAPAS.pdf</ref> For this reason, many local Zapatista and autonomous communities resist paying for electricity and have learned how to maintain their own repairs on power lines. <ref>Public denouncement of government tariff increases, ''Pueblos Unidos en Defensa de la Energia Eléctrica'' (23 November 2008):http://sipaz.files.wordpress.com/2008/11/denuncia-publica-pudee-23_11_08.jpg</ref> Such communities may therefore benefit from the increased independence provided by micro hydro power for their lighting needs, refrigeration of medicines and maintenance of communication systems.  
El modo principal para generar la energía en Chiapas es energía hidroeléctrica de una escala grande. El Cañon de Sumidero es una atracción popular para los turistas y al fin del viaje hay una presa grande y un central eléctrica visible. Esta presa se llam Chicasen y es la quinta más grande del mundo. La energía hidroeléctrica de una escala grande tiene varios desventajas importantes. Según ''New Scientist'',<ref>"Hydroelectric power's dirty secret revealed," ''New Scientist'' (February 24, 2005): [http://web.archive.org/web/20150710060545/http://www.newscientist.com/article/dn7046 http://www.newscientist.com/article/dn7046]</ref> las presas de la energía hidroeléctrica producen cantidades considerables de metano y dióxido de carbono. También, destruyen los ecosistemas y altera la migración de algunas poblaciones de peces y causan inundaciones.


''El poder hidroeléctrico ya es un método comun de generar energia en México.Lo constituye 26.2% de la electricidad del país, pero es generado principalmente por presas grandes que causan daños a los ecosistemas que rodean los ríos. La meta de este proyecto era investigar la factibilidad de los sistemas de micro-hídro, cuales por definición generan menos electricidad pero tienen un más benévolo impacto medioambental. Las comunidades autónomas y el terreno montañoso de Chiapas parezcan indicar circunstancias positivas para el poder micro-hídro. El descenso en la elevación quizás provea la cantidad de caída necesaria para generar suficiente energía de un sistema del poder&nbsp;micro-hídro.''
==== El Microhídro en América Central ====


''Aunque Chiapas sigue siendo uno de los estados más pobres de México, el estado contribuye una gran porción de la electricidad del país. Desafortunadamente, sólo 8% de los usuarios de la electricidad constituye para 50% del uso eléctrico del estado porque la Comisión Federal de la Electricidad (CFE) impone tarifas a comunidades que no pueden pagar para poder eléctrico. Por eso, muchas cercanas comunidades Zapatistas y autónomas están en resistencia de pagar para la electricidad y han aprendido mantener sus propios cables de la luz. Tales comunidades pueden por consiguiente beneficiar de la independencia aumentada aportado del poder micro-hídro para sus requirimientos de la luz, refrigeración de las medicinas y mantenimiento de los sistemas de comunicación.<br>''
* '''Chel, Quiché, Guatemala<ref>Hanei, Jeff. USAID. ''Micro-Hydro Energy for Post War Rehabilitation.''</ref>'''<br>La comunidad rural de Chel está localizada en la región al norte de Quiché, Guatemala. Este área fue muy afectada por la Guerra Civil de Guatemala, que lo dejó sin acceso al al agua, la energía, o la transportación. La gente de Chel confió en la Fundación Solar (una organización no lucrativa) para organizar la planeficación y instalación del sistema de microhídro. Éste significó un gran paso hacia la curación del miedo del mundo afuera creado por el masacre de Chel durante la guerra. La gente trabajó unida para construir un camino para entrar en la comunidad y llevando las necesidades en pie del pueblo. El sistema de microhídro fue construido en el año 2000 y provee 110 kilowatts de energía para 440 hogares. La comunidad estaba muy entusmada sobre los mejoramientos de la calidad de la vida creado por tener la electricidad. Estos merjoramientos incluyeron el compramiento de un teléfono satelite empoderado usando solar que generó dinero para Chel porque salvó las comunidades alrededores un viaje de 10 horas para encontrar un teléfono. El éxito del teléfono los ayudó a tener dinero suficiente para comprar una máquina de fax, una computadora, y una camioneta para transportar las necesidades. La introducción de la energía de microhídro dio poder al pueblo de Chel para planear su futura en vez de tener miedo de la vida afuera.


==== Local Energy Alternatives  ====
[[File:USAIDGuatemala.pdf|center|thumb]]


The main form of power generation in Chiapas is large scale hydro power. Cañon de Sumidero is a popular tourist attraction and at the end of the tour a large dam and hydro power plant are visible. This dam is called Chicoasen and it is the 5th largest in the world. Large scale hydro power has several major drawbacks. According to ''New Scientist'', <ref>"Hydroelectric power's dirty secret revealed," ''New Scientist'' (February 24, 2005): http://www.newscientist.com/article/dn7046</ref> hydro power dams produce significant amounts of methane and carbon dioxide. They also destroy ecosystems and disrupt the migration of fish populations and cause flooding.
* '''La Pita del Carmen, Nicaragua'''<ref>Royce, Michael, "La Pita Micro Hydro: Bringing Power to the People," ''Hydro World Review'' March 2000: 32-33.</ref><br>La comunidad de La Pita del Carmen está ubicada en Nicaragua al norte y tiene una población de casi 400 personas. El norte de Nicaragua es el hogar de muchos combatantes relocalizados de la Guerra Civil de Nicarague de 1980-90 quienes comunidades faltan la electricidad y están localizadas lejos de la infrastructura del poder federal. La Pita del Carmen está ubicada 70 kilometros de una fuente de energía, entonces un sistema de microhídro les proveió con una manera rentable para traer la electricidad al pueblo y ponerlos en el camino para el crecimiento económico del futuro. La Asociación del Trabajadores del Desarollo Renovable (ATDER) ayudó con la coordinación del sistema que trajo la electricidad a los hogares, campesinos, negocios, y las escuelas locales por primera vez. El sistema de microhídro en el Río La Pita comenzó a operar en el año 2000 y provee la gente con 120,000 kilowatt-horas cada año. Es uno de cuatro instalaciones de microhídro planeado por ATDER en el norte de Nicaragua en los años siguentes. También la comunidad se benefició de vencer contra las diferencias creadas por la guerra civil para trabajar unido hacia una meta
* '''Camata, Department of La Paz, Bolivia'''<ref>GEF Small Grants Program. United Nations Development Program. ''Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.'' [http://sgp.undp.org/download/SGP_Bolivia1.pdf Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.]</ref><br>Camata is a small subsistence community of 70 households whose people live mainly by producing coffee, chile and corn. The hydro installation provides 27 kilowatts of power that provides electricity to homes, a police station and a school as well as a new agro-processing plant. The agro-processing plant is the perfect complement to the micro hydro installment for Camata because the plant uses the same power during the day that households use in the evening. The plant helps both save and generate income for Camata: it provides the locals with a way to process their crops of coffee, corn, and chile instead of selling their crops to someone else for processing. Members of surrounding communities can sell their products to the plant instead of taking them to town. The community formed the Committee for Electrification after the suggestion that their location was ideal for micro hydro by the Hydraulic and Hydrology Institute. The Committee for Electrification was responsible for the planning and construction of the hydro system and agro-plant and now oversees power regulations and system operations.
* '''Camata, Department of La Paz, Bolivia'''<ref>GEF Small Grants Program. United Nations Development Program. ''Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.'' [http://sgp.undp.org/download/SGP_Bolivia1.pdf|thumb Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.]</ref><br>


==== Micro Hydro in Latin America  ====
==== Advice from a Local Water Engineer ====


*'''Chel, Quiché, Guatemala <ref>Hanei, Jeff. USAID. ''Micro-Hydro Energy for Post War Rehabilitation.'' [[File:USAIDGuatemala.pdf]]</ref>''' <br>The rural community of Chel is located in the northern region of Quiché, Guatemala. This area was greatly affected by the Guatemalan Civil War, which left it without access to water, energy or transportation. The people of Chel put their trust in Fundación Solar (a Guatemalan non-profit organization) to organize the planning and installation of the micro hydro system. This represented a big step towards healing the fear of the outside world instilled by the massacre of Chel during the war. The people worked together to build a road into the community and carried the necessary supplies on foot from town. The micro hydro power system was built in 2000 and provides 110 kilowatts of power for 440 homes. The community was very enthusiastic about the quality of life improvements created by having electricity. These improvements included purchasing a solar powered satellite telephone that generated an income for Chel because it saved surrounding communities a 10-hour journey to the nearest phone. The success of the phone then helped them afford a fax machine, computer and truck for transporting supplies.&nbsp; The introduction of micro hydro power empowered the town of Chel to plan for their future instead of being fearful of outside life. <br>
During our visit to the technical department of the National Water Commission (CONAGUA) we spoke to a water engineer. He relayed some information that his organization and other groups working on feasibility studies discovered about micro hydro feasibility in San Cristobal de Las Casas. It appears that much like the City of México,&nbsp;D.F., San Cristóbal de Las Casas was previously located on top of a lake. As the population grew a solution had to be found to remove the water from the city. A tunnel was constructed and the water was removed from the city and transported to barren land. The water from the lake that was San Cristóbal suddenly made this land viable for cultivation and a farming community grew there. Previous hydrological and micro hydro studies in San Cristóbal concluded that micro hydro systems would only be efficient during the rainy months of the year in the mountains far outside the city. In order to reach an ideal cost-benefit ratio, the system must be closer to the center of the city. This presents a problem in disrupting the irrigation of farming communities that were created by the tunnel. Although we are researching run-of-the-river systems that do not impede water flows to these communities, micro hydro systems are therefore seen as a threat to their livelihood. Near the center of San Cristóbal there exists much resistance to micro hydro and heightened tension whenever the topic is broached.<ref>Ing. J. Horita. Personal Communication. July 24, 2010</ref>
*'''La Pita del Carmen, Nicaragua'''<ref>Royce, Michael, "La Pita Micro Hydro: Bringing Power to the People," ''Hydro World Review'' March 2000: 32-33.</ref> <br>The community of La Pita del Carmen is located in northern Nicaragua and has a population of about 400. Northern Nicaragua is home to many relocated combatants of the 1980-90 Nicaraguan Civil War whose communities lack electricity and are located far from any federal power infrastructure. La Pita del Carmen is located 70 kilometers from the nearest power source, thus a micro hydro system provided them with a cost effective way to bring electricity to the town and put them on track for future economic growth. The Association of Renewable Development Workers (ATDER) assisted with the coordination of the system that brought electricity to homes, farmers, businesses and the local school for the first time. The micro hydro system on the La Pita River began operating in 2000 and provides the people with 120,000 kWh per year. It is one of four micro hydro installations planned by ATDER in Northern Nicaragua in the next few years. The community also benefitted from overcoming differences forged by the civil war in order to work together towards a mutually beneficial goal.<br>
*'''Camata, Department of La Paz, Bolivia''' <ref>GEF Small Grants Program. United Nations Development Program. ''Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.'' [http://sgp.undp.org/download/SGP_Bolivia1.pdf Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.]</ref><br>Camata is a small subsistence community of 70 households whose people live mainly by producing coffee, chile and corn. The hydro installation provides 27 kilowatts of power that provides electricity to homes, a police station and a school as well as a new agro-processing plant. The agro-processing plant is the perfect complement to the micro hydro installment for Camata because the plant uses the same power during the day that households use in the evening. The plant helps both save and generate income for Camata: it provides the locals with a way to process their crops of coffee, corn, and chile instead of selling their crops to someone else for processing. Members of surrounding communities can sell their products to the plant instead of taking them to town. The community formed the Committee for Electrification after the suggestion that their location was ideal for micro hydro by the Hydraulic and Hydrology Institute. The Committee for Electrification was responsible for the planning and construction of the hydro system and agro-plant and now oversees power regulations and system operations.


==== Advice from a Local Water Engineer  ====
=== Criteria ===


During our visit to the technical department of the National Water Commission (CONAGUA) we spoke to a water engineer. He relayed some information that his organization and other groups working on feasibility studies discovered about micro hydro feasibility in San Cristobal de Las Casas. It appears that much like the City of México,&nbsp;D.F., San Cristóbal de Las Casas was previously located on top of a lake. As the population grew a solution had to be found to remove the water from the city. A tunnel was constructed and the water was removed from the city and transported to barren land. The water from the lake that was San Cristóbal suddenly made this land viable for cultivation and a farming community grew there. Previous hydrological and micro hydro studies in San Cristóbal concluded that micro hydro systems would only be efficient during the rainy months of the year in the mountains far outside the city. In order to reach an ideal cost-benefit ratio, the system must be closer to the center of the city. This presents a problem in disrupting the irrigation of farming communities that were created by the tunnel. Although we are researching run-of-the-river systems that do not impede water flows to these communities, micro hydro systems are therefore seen as a threat to their livelihood. Near the center of San Cristóbal there exists much resistance to micro hydro and heightened tension whenever the topic is broached. <ref>Ing. J. Horita. Personal Communication. July 24, 2010</ref>  
<center>


=== Criteria  ===
{| class="wikitable"
 
! Criteria
{| class="wikitable sortable FCK__ShowTableBorders"
! Description
|-
! Criteria  
! Description  
! Weight
! Weight
|-
|-
| Aesthetics  
| Aesthetics
| Meets cultural needs.  
| Meets cultural needs.
| align="right" | 6
| align="right" | 6
|-
|-
| Community Involvement  
| Community Involvement
| Community has interest and need.  
| Community has interest and need.
| align="right" | 5
| align="right" | 5
|-
|-
| Cost Efficiency  
| Cost Efficiency
| Cost/kW, availability of local materials, and low maintenance.  
| Cost/kW, availability of local materials, and low maintenance.
| align="right" | 9.5
| align="right" | 9.5
|-
|-
| Educational  
| Educational
| System educates community about sustainable energy.  
| System educates community about sustainable energy.
| align="right" | 6
| align="right" | 6
|-
|-
| Environmental Effect  
| Environmental Effect
| Diverts an appropriate amount of water and does not harm aquatic life.  
| Diverts an appropriate amount of water and does not harm aquatic life.
| align="right" | 7
| align="right" | 7
|-
|-
| Location of Site  
| Location of Site
| Close to community with access to a continuously reliable water source.  
| Close to community with access to a continuously reliable water source.
| align="right" | 9.5
| align="right" | 9.5
|}
|}


== What is Micro Hydro?/''¿Qué es Microhídro?''<br>  ==
</center>
 
Most simply, micro hydro systems utilize the kinetic energy of falling water to turn a turbine that converts kinetic energy into mechanical energy. The mechanical energy can either be used to turn water wheels or a generator can convert the mechanical energy into electrical DC power. Micro hydro can be used to power remote communities or provide a renewable energy resource to existing electric grids.<ref>''Micro-Hydropower Systems: A Buyer's Guide'', CanmetENERGY, Natural Resources Canada: http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca/fichier/79276/buyersguidehydroeng.pdf</ref>


Here is a short video about the basics of how micro hydro electric power works. This is just one example of a micro hydro system. There are many variations and designs they can take on depending on the conditions of your site.
== ¿Qué es Microhídro? ==


''Simplemente, los sistemas del microhídro utilizan la energía cinética del agua cayendo para girar una turbina que convierte la energía cinética en la energía mecánica. Se puede usar la energía mecánica o para girar ruedas de agua o un generador puede convertir la energía mecánica en corriente continua eléctrica. Se puede usar el microhídro para dar energía a comunidades remotos o para proveer un recurso de energía renovable a una red de electricidad que ya existe.<ref>''Micro-Hydropower Systems: A Buyer's Guide'', CanmetENERGY, Natural Resources Canada: http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca/fichier/79276/buyersguidehydroeng.pdf</ref>'' 
Simplemente, los sistemas del microhídro utilizan la energía cinética del agua cayendo para girar una turbina que convierte la energía cinética en la energía mecánica. Se puede usar la energía mecánica o para girar ruedas de agua o un generador puede convertir la energía mecánica en corriente continua eléctrica. Se puede usar el microhídro para dar energía a comunidades remotos o para proveer un recurso de energía renovable a una red de electricidad que ya existe.<ref>''Micro-Hydropower Systems: A Buyer's Guide'', CanmetENERGY, Natural Resources Canada: http://web.archive.org/web/20111111192513/http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca:80/fichier/79276/buyersguidehydroeng.pdf</ref>


''Aquí está una película pequeña sobre las ideas basicas de cómo funciona la energía eléctrica del microhídro. Éste es solamente un ejemplo de un sistema de microhídro. Hay varios diseños que se pueden usar dependiendo de las condiciones de su propio sitio.''
Aquí está una película pequeña sobre las ideas basicas de cómo funciona la energía eléctrica del microhídro. Éste es solamente un ejemplo de un sistema de microhídro. Hay varios diseños que se pueden usar dependiendo de las condiciones de su propio sitio.
<center><tt><nowiki /></tt>{{#widget:YouTube|id=S4B2gODY3Mk}}''<br>''</center>


=== Components of Micro-Hydro System/Componentes del&nbsp;Sistema de Micro-Hídro&nbsp;  ===
<center>{{Video|S4B2gODY3Mk}}</center>


A micro-hydro system consists of a diversion of part of the water flow from a river or '''intake'''<ref>Jerry Ostermeier, "Microhydro Intake Design," '' Homepower Magazine'' 124 (April/May 2008): 68-73. http://homepower.com/view/?file=HP124_pg68_Ostermeier;.</ref>, which passes through a debris filter or '''settling basin'''<ref>Centre for Rural Technology (31 July 2005). ''Manual on Micro Hydro Development.'' Kathmandu, Nepal: Prepared for NGO Capacity Building for Poverty-reducing Sustainable Energy Solutions in South Asia Project. [http://www.inforse.org/asia/pdf/Nepal_Micro_Hydro_Manual.pdf Manual on Micro Hydro Development]</ref>, and then flows from a '''forebay tank'''<ref>Tamburrini, Mark, ''A Feasibility Study for a Microhydro Installation for the Strangford Lough Wildfowlers Coversation Association: A Thesis Submitted in Partial Fulfilment of the Requirements of the Degree of Master of Science'', Glasgow, UK: Energy Systems Research Unit Department of Mechanical Engineering University of Strathclyde (September 2004): 34 [[File:Tamburrini.pdf]]</ref> down a hill in a pipe or '''penstock<ref>Nautilus Water Turbine Inc. Nautilus Scroll Case Appendix. [http://www.builditsolar.com/Projects/Hydro/WaterTurbineAppendix.pdf Nautilus Water Turbine Inc.´s '''Water Turbine Appendix''']</ref>''', where it accelerates through the force of gravity and gains '''head'''. The pressure of this stream of water turns a '''turbine''' <ref>http://www.appropedia.org/Microhydro Appropedia Microhydro [http://www.appropedia.org/Microhydro Appropedia Microhydro]</ref> and is then released back to the river flow through a '''tailrace<ref>Nautilus Water Turbine Inc. Nautilus Scroll Case Appendix. [http://www.builditsolar.com/Projects/Hydro/WaterTurbineAppendix.pdf Nautilus Water Turbine Inc.´s '''Water Turbine Appendix''']</ref>'''. The turbine´s mechanical energy can be converted into electrical energy through a '''generator'''<ref>Scott Bennett, ''Encyclopedia of Energy'' (2007). [[File:Encyclopedia-of-Energy.pdf‎]]</ref>, whose current must be maintained by a '''controller'''<ref>Paul Cunningham; Ian Woofenden, "Microhydro Electricity Basics," ''Homepower Magazine'' http://homepower.com/basics/hydro/#MicrohydroElectricSystemComponents.</ref> and can then be transferred through '''transmission lines&nbsp;<ref>Nautilus Water Turbine Inc. Nautilus Scroll Case Appendix. [http://www.builditsolar.com/Projects/Hydro/WaterTurbineAppendix.pdf Nautilus Water Turbine Inc.´s '''Water Turbine Appendix''']</ref>''' to provide electricity for a consumer or business.<ref>Scott Davis, ''Microhydro: Clean Power from Water'' (2003).</ref><br>
=== Componentes del Sistema de Micro-Hídro ===


''Un sistema de micro-hídro utilizaría una toma'' ''para desviar una parte del flujo del río. Luego este agua pasaría por un'' ''filtro de detritos y un canal&nbsp;a una&nbsp;cámara de carga que está situada por encima de la casa de máquinas. Desde la cámara de carga el agua fluye através de un conducto forzado cuesta abajo de un cerro, en donde se acumula una presión neto, menos la fricción perdida al tubo y empalmes, que le llamamos la caída. Esta caída accelera la fuerza con que el agua gira una turbina y aumenta la cantidad de la electricidad que se puede generar. Luego el agua vuelve al flujo del río por un canal de 'descarga. La energía mecánica de la turbina puede ser convertido en energía eléctrica através de un generador, cuyo corriente hay que ser mantenido por un controlador y&nbsp;luego&nbsp;puede ser transferido&nbsp;através de cables de la luz para proveer la electricidad a un consumidor o una empresa.''
Un sistema de micro-hídro utilizaría una toma para desviar una parte del flujo del río. Luego este agua pasaría por un filtro de detritos y un canal a una cámara de carga que está situada por encima de la casa de máquinas. Desde la cámara de carga el agua fluye através de un conducto forzado cuesta abajo de un cerro, en donde se acumula una presión neto, menos la fricción perdida al tubo y empalmes, que le llamamos la caída. Esta caída accelera la fuerza con que el agua gira una turbina y aumenta la cantidad de la electricidad que se puede generar. Luego el agua vuelve al flujo del río por un canal de 'descarga. La energía mecánica de la turbina puede ser convertido en energía eléctrica através de un generador, cuyo corriente hay que ser mantenido por un controlador y luego puede ser transferido através de cables de la luz para proveer la electricidad a un consumidor o una empresa.


<br><br>[[Image:Diagram micro.gif|thumb|center]]<br>
[[File:scheme.png|thumb|center]]


=== Maintenance of System/''El Mantenimiento del Sistema''  ===
=== El Mantenimiento del Sistema ===


*Micro hydro systems require regular maintenance although the cost of this maintenance is generally low.<ref>Natural Resources Canada, "An Introduction to Micro-Hydropower Systems," Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2005):2-7. [http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca/fichier.php/codectec/En/ISBN066239914/Intro_MicroHydro_ENG.pdf]</ref> These tasks can generally be completed by one part time operator. Filters must be cleaned on a regular basis, but the number of cleanings can be reduced. By installing the filter at an angle the filter will be mostly self-cleaning. Penstocks must be unclogged after a certain period of time, but the better the filter, the less often the penstock will become clogged. Machinery within the powerhouse must be greased to continue running at optimal performance. If batteries are being used to store energy they must be equalized on a regular basis. Minimum wage in Chiapas is 49 pesos/hour<ref>[http://www.sipaz.org/data/chis_en_02.htm SIPAZ]</ref> for an estimated 3 hours of maintenance a month, maintenance ends up costing 1,764 pesos annually.
* Los sistemas de microhídro requieren mantenimiento aunque el costo de este mantenimiento sea generalmente bajo.<ref>Natural Resources Canada, "An Introduction to Micro-Hydropower Systems," Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2005):2-7.</ref>Por lo general, solamente un obrero puede completar estos trabajos. Hay que limpiar los filtros regularmente, pero se puede reducir el número de las limpiezas. Si se instala el filtro de un ángulo, el filtro se podrá limpiar. Hay que desembarazar los conductos forzados después de un período de tiempo, pero lo mejor el filtro, lo menos seguido que el conducto forzado se pondrá bloquear. Hay que lubricar algunas máquinas dentro de la casa de la turbina para que puedan seguir funcionando al nivel óptimo. Si se usa pilas para acumular energía, hay que igualarlas regularmente. El salario mínimo en el estado de Chiapas es 49 pesos/hora<ref>[http://web.archive.org/web/20120106154526/http://www.sipaz.org:80/data/chis_en_02.htm SIPAZ]</ref> para tres horas de mantenimiento cada mes estimado, el mantenimiento costaría 1,764 pesos cada año.


*''Los sistemas de microhídro requieren mantenimiento aunque el costo de este mantenimiento sea generalmente bajo.<ref>Natural Resources Canada, "An Introduction to Micro-Hydropower Systems," Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2005):2-7. [http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca/fichier.php/codectec/En/ISBN066239914/Intro_MicroHydro_ENG.pdf]</ref>Por lo general, solamente un obrero puede completar estos trabajos.  Hay que limpiar los filtros regularmente, pero se puede reducir el número de las limpiezas.  Si se instala el filtro de un ángulo, el filtro se podrá limpiar.  Hay que desembarazar los conductos forzados después de un período de tiempo, pero lo mejor el filtro, lo menos seguido que el conducto forzado se pondrá bloquear.  Hay que lubricar algunas máquinas dentro de la casa de la turbina para que puedan seguir funcionando al nivel óptimo.  Si se usa pilas para acumular energía, hay que igualarlas regularmente.  El salario mínimo en el estado de Chiapas es 49 pesos/hora<ref>[http://www.sipaz.org/data/chis_en_02.htm SIPAZ]</ref> para tres horas de mantenimiento cada mes estimado, el mantenimiento costaría 1,764 pesos cada año.''
=== Pros and Cons of Micro Hydro<ref>Micro-hydro, ''The Ashden Awards for Sustainable Energy'' [http://www.ashdenawards.org/micro-hydro].</ref><ref>Micro Hydro Power--Pros and Cons, ''Alternative Energy News'' (October 26, 2006) [http://www.alternative-energy-news.info/micro-hydro-power-pros-and-cons/].</ref><ref>Small Hydro Power: Technology and Current Status, ''Renewable and Sustainable Energy Reviews'' Vol 6, Issue 6 (December 2002): 537-556</ref> ===


=== Pros and Cons of Micro Hydro <ref>Micro-hydro, ''The Ashden Awards for Sustainable Energy'' [http://www.ashdenawards.org/micro-hydro].</ref><ref>Micro Hydro Power--Pros and Cons, ''Alternative Energy News'' (October 26, 2006) [http://www.alternative-energy-news.info/micro-hydro-power-pros-and-cons/].</ref><ref>Small Hydro Power: Technology and Current Status, ''Renewable and Sustainable Energy Reviews'' Vol 6, Issue 6 (December 2002): 537-556</ref>  ===
<center>


{| cellpadding="2" border="1"
{| class="wikitable"
|-
| width="200" | Pros
| width="200" | Pros  
| width="200" | Cons
| width="200" | Cons
|-
|-
|  
|
*Water is a concentrated and continuous source of energy  
* Water is a concentrated and continuous source of energy
*Energy availability is fairly predictable  
* Energy availability is fairly predictable
*Very little maintenance is required  
* Very little maintenance is required
*There is very little environmental impact  
* There is very little environmental impact
*Greenhouse gases are reduced by reduction of fossil fuel usage
* Greenhouse gases are reduced by reduction of fossil fuel usage
 
|


|
* Good sites close to communities are hard to find
*Good sites close to communities are hard to find  
* There is not much room for expanding the power generated
*There is not much room for expanding the power generated  
* Variations in seasonal river flow can limit power availability
*Variations in seasonal river flow can limit power availability  
* Other uses for the water, such as irrigation, can take away from the desirability of the system
*Other uses for the water, such as irrigation, can take away from the desirability of the system  
* Lack of government support and subsidies
*Lack of government support and subsidies  
* The additional work and maintenance may be undesirable if the electricity recipients are already grid tied
*The additional work and maintenance may be undesirable if the electricity recipients are already grid tied


|}
|}


<br>
</center>
 
== Feasibility Study/El Estudio de Factibilidad  ==


The feasibility of a micro hydro system is firstly dependent upon the flow and head available at the site, and secondly upon the electricity load and proximity of the system to the community. The feasibility study for a micro hydro system aims to answer the following questions for a given site<ref>Natural Resources Canada,''Micro-Hydropower Systems: A Buyer's Guide,'' Her Majesty the Queen in Right of Canada (2004). [[Image:16047612-Canada-Micro-Hydro-Guide.pdf]] Appendix B has a form to fill out based on the site's stream info and electrical needs</ref>:
== El Estudio de Factibilidad ==


*How much head is available?
La factibilidad de un sistema de microhídro es primeramente dependiente en el flujo y la caída disponibles en el sitio, y segundamente en la carga de electricidad y la proximidad del sistema a la comunidad. El estudio de factibilidad para un sistema de microhídro trata de responder a las siguientes preguntas para un sitio dado:<ref>Natural Resources Canada,''Micro-Hydropower Systems: A Buyer's Guide,'' Her Majesty the Queen in Right of Canada (2004). Appendix B has a form to fill out based on the site's stream info and electrical needs</ref>
*What are the maximum and minimum flow rates?
*How long does the penstock have to be?
*How much power can be generated at the flow rates?
*Initial and annual costs?
*Potential environmental effects of installing micro hydro?


''La factibilidad de un sistema de microhídro es primeramente dependiente en el flujo y la caída disponibles en el sitio, y segundamente en la carga de electricidad y la proximidad del sistema a la comunidad.  El estudio de factibilidad para un sistema de microhídro trata de responder a las siguientes preguntas para un sitio dado<ref>Natural Resources Canada,''Micro-Hydropower Systems: A Buyer's Guide,'' Her Majesty the Queen in Right of Canada (2004). [[Image:16047612-Canada-Micro-Hydro-Guide.pdf]] Appendix B has a form to fill out based on the site's stream info and electrical needs</ref>:''
[[File:16047612-Canada-Micro-Hydro-Guide.pdf|center|thumb]]


*''¿Cuánta caída está disponible?''
* ¿Cuánta caída está disponible?
*''¿Qué son los ritmos de flujo máximos y mínimos?''
* ¿Qué son los ritmos de flujo máximos y mínimos?
*''¿Cómo largo tiene que ser el conducto forzado?''
* ¿Cómo largo tiene que ser el conducto forzado?
*''¿Cuánto poder se puede generar con estos ritmos de flujo?''
* ¿Cuánto poder se puede generar con estos ritmos de flujo?
*''¿Cuáles son los costos iniciales y anuales?''
* ¿Cuáles son los costos iniciales y anuales?
*''¿Hay la posibilidad de afectar al medio ambiente con una instalación de microhídro?''
* ¿Hay la posibilidad de afectar al medio ambiente con una instalación de microhídro?


=== Data Collection Methods ===
=== Data Collection Methods ===


<center><gallery>
<center><gallery>
Image:Measure.jpg|Measure the distance across the river.
Image:Measure.jpg|Mida la distancia atrás el río.
Image:Depth.jpg|With the tape measure still in place, take depth readings at consistent intervals all the way across.
Image:Depth.jpg|Con la cinta métrica todavía en el mismo lugar, mida la profundida With the tape measure still in place, take depth readings at consistent intervals all the way across.
Image:Down.jpg|Measure a distance down the stream for a flow path.  
Image:Down.jpg|Measure a distance down the stream for a flow path.
Image:Drop.jpg|Drop something that floats into the river at the beginning of the flow path.  
Image:Drop.jpg|Drop something that floats into the river at the beginning of the flow path.
Image:Time.jpg|Time the float from the beginning to the end of the flow path that you measured.  
Image:Time.jpg|Time the float from the beginning to the end of the flow path that you measured.
Image:Level.jpg|Find a location along the river with measurable head. Set up the level on top of the pole and measure their combined length. Have one person look down the level like a sight, and another watching to make sure it stays level.  
Image:Level.jpg|Find a location along the river with measurable head. Set up the level on top of the pole and measure their combined length. Have one person look down the level like a sight, and another watching to make sure it stays level.
Image:Walk.jpg|Have one person, apart from the two at the level setup, walk up the hill in line with the level until their feet are at the top of the level. Then move the setup to their location.
Image:Walk.jpg|Have one person, apart from the two at the level setup, walk up the hill in line with the level until their feet are at the top of the level. Then move the setup to their location.
Image:| To get the total head for your location multiply the number of times you moved the setup by the total length of the setup.
Image:| To get the total head for your location multiply the number of times you moved the setup by the total length of the setup.
</gallery></center>
</gallery></center>


===== Measuring Flow Rate  =====
===== Midiendo el Ritmo del Flujo =====


There are varying methods on how to measure flow rate. The method we used was to measure a cross-section of a river and time the period of a floating object down the given cross-section. We averaged our ten trials and multiplied the average time by estimated cross-sectional area to calculate a flow in cubic feet per minute. We then converted this to gallons per minute. There is at least one other method for determining flow rate, which involves constructing a temporary dam, then placing a tube out of the dam which diverts the water into a bucket of a specific capacity. Timing the rate at which the bucket fills and then multiplying the average time to fill the bucket by the volume capacity of the bucket gives the flow rate.<ref>Jim Norman,''Micro Hydro Power Design Booklet,'' ABS Alaskan Inc. (uploaded to www.scribd.com 15 May 2010): Appendix 2 [http://www.scribd.com/doc/31432159/Micro-Hydro-Power-Design-Booklet ''Micro Hydro Power Design Booklet'' by Jim Norman].</ref>
Hay varios metodos para medir el ritmo del flujo. El metodo que usamos fue medir una sección atrás del río y medir el período del tiempo de un objeto flotando bajo de la sección atrás. Tomamos el promedio de nuestras diez pruebas y multiplicamos el medio tiempo por la área estimado de la sección atrás para calcular el flujo en pies cúbicos cada minuto. Entonces convirtimos éste en galones cada minuto. Hay a menos de un otro metodo para determinar el ritmo del flujo que tiene que ver con la construcción de una presa temporaria y después poniendo un tubo fuera de la presa que divierta el agua a una holla de una capacidad específica. Midiendo el ritmo en que llena la holla y entonces multiplicando el medio tiempo para llenar la holla por el la capacidad de volumen de la holla nos da el ritmo del flujo.<ref>Jim Norman,''Micro Hydro Power Design Booklet,'' ABS Alaskan Inc. (uploaded to www.scribd.com 15 May 2010): Appendix 2 [http://www.scribd.com/doc/31432159/Micro-Hydro-Power-Design-Booklet ''Micro Hydro Power Design Booklet'' by Jim Norman].</ref>


===== Measuring Available Head  =====
===== Midiendo la Caída Disponible =====


The way we measured head was to use a carpenter's level and a calibrated pole five feet long. We had one person walk in front of the level counting strides until his or her feet were in line with the level signifying that the walker had moved up in elevation by five feet. We then moved the level to where the walker stopped and repeated the step. We started measuring from where we would want to place our powerhouse and walked until we reached the elevation of the river. By counting how many times the walker stopped, we could determine the amount of run of the hill, which allows us to determine the necessary amount of piping. By multiplying the amount strides taken by the length of the walker's stride, we were able to determine the amount of available head from the river to the powerhouse.<ref>Chiras, Daniel D., ''The Homeowner's Guide to Renewable Energy: Achieving Energy Independence,'' Gabriola Island, BC, CA: New Society Publishers, 2006.</ref>  
La manera en que medimos la caída fue usar un nivel del carpintero y un polo calibrado de cinco pies en longitud. Tuvimos una persona cambinando en frente del nivel contando las zancadas hasta que sus pies estuvieron directamente en linea con el nivel significando que el caminante se había subido cinco pies de elevación. Entonces, movimos el nivel a donde paró el caminante y repetimos este paso. Empezamos a medir de donde querría poner nuestra casa de turbina y caminamos hasta que lleguemos a la elevaciónd del río. Por contando cuantas veces paró el caminante, pudimos determinar la cantidad de la carrera del cerro que nos permita a determinar la cantidad de tubo necesaria para el conducto forzado. Por multiplicando la cantidad de zancadas por la longitud de una zancada del caminante, pudimos determinar la cantidad de caída disponible desde el río hasta la casa de turbina.<ref>Chiras, Daniel D., ''The Homeowner's Guide to Renewable Energy: Achieving Energy Independence,'' Gabriola Island, BC, CA: New Society Publishers, 2006.</ref>


===== Power Output Equation =====
===== Power Output Equation =====


&nbsp; A common field equation to measure the '''theoretical''' maximum power available in a moving body of water is:  
&nbsp; A common field equation to measure the '''theoretical''' maximum power available in a moving body of water is:


:<math>\, P_{max} = \frac{Q_{max}*H_{max}*e_{max}}{k}</math>
:<math>\, P_{max} = \frac{Q_{max}*H_{max}*e_{max}}{k}</math>


<br>Where:  
<br>Where:
 
* P<sub>max</sub>=Maximum Power Available (kW)
* Q<sub>max</sub>=Flow (Volume/time)
* H<sub>max</sub>=Head (Vertical drop in ft)
* e<sub>max</sub>=Efficiency of the turbine (use a value of 1 for max power available)
* K=Unit conversion factor (see table below for some common values)


*P<sub>max</sub>=Maximum Power Available (kW)
*Q<sub>max</sub>=Flow (Volume/time)
*H<sub>max</sub>=Head (Vertical drop in ft)
*e<sub>max</sub>=Efficiency of the turbine (use a value of 1 for max power available)
*K=Unit conversion factor (see table below for some common values)
<div>
<div>
{| class="FCK__ShowTableBorders"
 
|-
{| class="wikitable"
| align="center" | '''For Q measured in'''  
| align="center" | '''For Q measured in'''
| align="center" | '''K is equal to'''
| align="center" | '''K is equal to'''
|-
|-
| ft<sup>3</sup>/min  
| ft<sup>3</sup>/min
| 708 (ft<sup>4</sup>)/(min*kW)
| 708 (ft<sup>4</sup>)/(min*kW)
|-
|-
| ft<sup>3</sup>/sec (CFS)  
| ft<sup>3</sup>/sec (CFS)
| 11.8 (ft<sup>4</sup>)/(sec*kW)
| 11.8 (ft<sup>4</sup>)/(sec*kW)
|-
|-
| l/sec  
| l/sec
| 102 (l*ft)/(sec*kW)
| 102 (l*ft)/(sec*kW)
|-
|-
| gal/min (GPM)  
| gal/min (GPM)
| 5302 (gal*ft)/(min*kW)
| 5302 (gal*ft)/(min*kW)
|}
|}
</div>
<br>


To find the '''actual''' power you will get from that moving body of water, calculate P<sub>net</sub> with the following changes made.  
</div>
<br>
 
To find the '''actual''' power you will get from that moving body of water, calculate P<sub>net</sub> with the following changes made.


:<math>\, P_{net} = \frac{Q_{net}*H_{net}*e_{net}}{k}</math>
:<math>\, P_{net} = \frac{Q_{net}*H_{net}*e_{net}}{k}</math>


Where:  
Where:


*P<sub>net</sub>= The net power extracted from the river, not including loss in delivery from power station to load (kW)  
* P<sub>net</sub>= The net power extracted from the river, not including loss in delivery from power station to load (kW)
*Q<sub>net</sub>= Flow (Volume/time) - Only take a portion of the max flow (%<sub>take</sub>). For delicate streams this may be a small percentage of the total flow
* Q<sub>net</sub>= Flow (Volume/time) - Only take a portion of the max flow (%<sub>take</sub>). For delicate streams this may be a small percentage of the total flow
**Q<sub>net</sub>=Q<sub>max</sub>*%<sub>take</sub>  
** Q<sub>net</sub>=Q<sub>max</sub>*%<sub>take</sub>
*H<sub>net</sub>= Head (Vertical drop in feet) - This is the actual head that you have available due to losses from friction. Calculate friction loss using tables based on the materials you use for diversion (e.g. PVC)
* H<sub>net</sub>= Head (Vertical drop in feet) - This is the actual head that you have available due to losses from friction. Calculate friction loss using tables based on the materials you use for diversion (e.g. PVC)
**Determine equivalent length of pipe by adding actual length of pipe and equivalent lengths of fittings based on tables using pipe size  
** Determine equivalent length of pipe by adding actual length of pipe and equivalent lengths of fittings based on tables using pipe size
**Find Frictional Pressure Loss Ratio (FPL) coefficient in ft<sub>loss</sub>/ft<sub>pipe</sub> based upon flow rate and pipe size  
** Find Frictional Pressure Loss Ratio (FPL) coefficient in ft<sub>loss</sub>/ft<sub>pipe</sub> based upon flow rate and pipe size
**Calculate H<sub>loss</sub>=equivalent length of pipe * FPL  
** Calculate H<sub>loss</sub>=equivalent length of pipe * FPL
**H<sub>net</sub>=H<sub>max</sub>-H<sub>loss</sub>  
** H<sub>net</sub>=H<sub>max</sub>-H<sub>loss</sub>
*e<sub>net</sub>= Efficiency of the turbine - Always between 0 and 1, usually between .5 and .9 depending on the turbine type and flow rate. A value of 0.78 is a good guess for modern turbines in average conditions
* e<sub>net</sub>= Efficiency of the turbine - Always between 0 and 1, usually between.5 and.9 depending on the turbine type and flow rate. A value of 0.78 is a good guess for modern turbines in average conditions
*K=Unit conversion factor (see table above for some common values)
* K=Unit conversion factor (see table above for some common values)


Note that these equations are static in time. You must run these equations with a resolution high enough to cover periods of variation (e.g. monthly river data).
Note that these equations are static in time. You must run these equations with a resolution high enough to cover periods of variation (e.g. monthly river data).


=== Costs/Costos ===
=== Costos ===
 
The cost of a system is dependent on the location, power needs, locally available materials or components, and type of system you build.&nbsp;Aside from ideal site conditions, the cost-efficiency can be increased if local labor and expertise is utilized, where there are high load requirements (ideally, industry during the day and domestic needs at night), and the system uses easily maintainable and replaceable parts.<ref>Small Hydro Power: Technology and Current Status. Renewable and Sustainable Energy Reviews. Volume 6, Issue 6, December 2002, Pages 537-556</ref> According to Retscreen Canada 75% of costs are site specific. <ref>Retscreen Canada [http://www.docstoc.com/docs/18603942/Small-Hydro-Project-Analysis Small Hydro Project Analysis]</ref> The typical range in cost is $1,200 to $6,000 per installed kW. <br>


''Las pruebas de la factibilidad que ejecutamos utilizaron al programa de software RETScreen para estimar el poder potencial que sería disponible de nuestro sistema prepuesto. Este programa también nos permitó a estimar los costos potenciales de la instalación del sistema y prever la cantidad del tiempo que sería necesario para que la comunidad se recupere tales costos. Éste incluye las tarifas posibles de conectar la energia renovable a la red eléctrica pagadas por la Comisión Federal de la Electricidad (CFE) a la comunidad, la venta de los créditos internacionales de las emisiones de gases invernaderos (de aquí en adelenta conocidos como créditos de carbón) en el mercado internacional, y la formación de una empresa independiente de electricidad por la comunidad que entonces vendría su electricidad al gobierno.''
Las pruebas de la factibilidad que ejecutamos utilizaron al programa de software RETScreen para estimar el poder potencial que sería disponible de nuestro sistema prepuesto. Este programa también nos permitó a estimar los costos potenciales de la instalación del sistema y prever la cantidad del tiempo que sería necesario para que la comunidad se recupere tales costos. Éste incluye las tarifas posibles de conectar la energia renovable a la red eléctrica pagadas por la Comisión Federal de la Electricidad (CFE) a la comunidad, la venta de los créditos internacionales de las emisiones de gases invernaderos (de aquí en adelenta conocidos como créditos de carbón) en el mercado internacional, y la formación de una empresa independiente de electricidad por la comunidad que entonces vendría su electricidad al gobierno.


==== Site Specific Costs  ====
==== Los Costos Específicos a los Sitios ====


The estimated up-front costs for the hydro systems designed at each location were an important part of the RetScreen analysis, they were used to determine a payback period.  
Los costos estimados iniciales para los sistemas de microhídro diseñados en cada local fueron un parte importante del analisis de RetScreen, fueron usado para determinar el período.


==== Financing  ====
==== Financiamiento ====


Potential options for increasing the feasibility of a system include: grants, selling carbon credits based on greenhouse gases avoided by the micro hydro system, or selling the unused energy back to the local power company to receive income through feed-in tariffs.  
Las opciones potenciales para aumentar la factibilidad de un sistema incluyen: las subvenciones, vendiendo créditos del carbón basado en los gases del efecto invernadero evitado por un sistema de microhídro, o vendiendo la energía a la empresa de energía local para recibir dinero entre tarifas de conectar al red.


===== Grants  =====
===== Las Subvenciones =====


The location of, intent of, or group assisted by the project; renwable energy generated; protection of resources; greenhouse gases avoided; or end use of the electricity can help to secure grants by different sources to assist with the initial capital required to build a system. A couple of examples of grant organizations that might be pertinent to a micro hydro project are:  
La ubicación de, intento de, o grupo ayudado por este proyecto; la energía renovable generada; la protección de recursos; la evitación los gases del efecto invernadero; o el uso final de la electricidad puede ayudar a obtener algunas subvenciones por fuentes diferentes para ayudar con capital inicial requisito para construir este sistema. Algunas ejemplos de organizaciones de subvenciones que posiblemente sería relevante a un proyecto de microhídro son:


*The [http://sgp.undp.org/ Global Environment Facility-Small Grants Program] has provided over 120,000 grants in 122 countries to " non-governmental and community-based organizations"
* The [http://sgp.undp.org/ Global Environment Facility-Small Grants Program] has provided over 120,000 grants in 122 countries to " non-governmental and community-based organizations"


for projects that combat environmental problems and protect human rights.<ref>[http://sgp.undp.org/ GEF Small Grants Program]</ref><br>
for projects that combat environmental problems and protect human rights.<ref>[http://sgp.undp.org/ GEF Small Grants Program]</ref><br>


*[http://www.terravivagrants.org/ Terra Viva] is a "directory of international grant funding for agriculture, energy, environment, and natural resources in the developing world."<ref>[http://www.terravivagrants.org/ Terra Viva Grants]</ref> <br>
* [https://terravivagrants.org/ Terra Viva] is a "directory of international grant funding for agriculture, energy, environment, and natural resources in the developing world."<ref>[https://terravivagrants.org/ Terra Viva Grants]</ref><br>


===== Carbon Credits  =====
===== Créditos de Carbono =====


Selling carbon credits on the international market is a way to increase the feasibility of this system. For every megaton of CO2 not emitted by this clean energy form a carbon credit or OCO can be sold to a company generating these greenhouse gases. This market exists because of the emissions cap created by the Kyoto Protocol. Prices vary, but 3Degrees <ref>[http://www.3degreesinc.com/ 3 Degrees Inc.] </ref>buys these credits at $15.00 (USA) per metric ton of CO2.  
Vendiendo créditos de carbono en el mercado internacional es una manera de aumentar la factibilidad de este sistema. Por cada megatonelada de dióxido de carbono no emitida por esta energía limpia forma un crédito de carbono o OCO que se puede vender a una empresa generando estos gases del efecto invernadero. Este mercado existe a cause del limite de emisiones creado por el tratado de Kioto. Precios varian, pero 3Degrees<ref>[http://www.3degreesinc.com/ 3 Degrees Inc.]</ref> compra estos créditos por $15 dólares (EEUU) cada tonelada métrica de dioxido de carbono.


===== Feed-In Tariffs =====
===== Feed-In Tariffs =====


Feed-in tariffs pay a rate for electricity fed back into the grid from a renewable energy technology such as solar, wind or hydro.&nbsp; Feed-in tariffs both encourage investment in renewable energy technologies and supplement the grid with cleaner sources of power otherwise going unused by the owner of the system.<ref>Energy Matters - Australia. "Feed in tariff for grid connected solar power systems." 2009. [http://www.energymatters.com.au/government-rebates/feedintariff.php#fit-need]</ref> The Mexican government approved small-scale solar grid tie-in in 2007, but there are not yet any laws for wind or hydro power technologies. <ref>Gobierno de Mexico. Diario Oficial de la Secretaria de Energía. Resolucion No. RES/176/2007. 27 Junio 2007. [[File: FI.pdf]]</ref> <ref>Mills, Jsun. “Re: Feed-In Tariffs in Mexico.Email with Alta Energía. 26 July 2010.</ref>  
Feed-in tariffs pay a rate for electricity fed back into the grid from a renewable energy technology such as solar, wind or hydro.&nbsp; Feed-in tariffs both encourage investment in renewable energy technologies and supplement the grid with cleaner sources of power otherwise going unused by the owner of the system.<ref>Energy Matters - Australia. "Feed in tariff for grid connected solar power systems." 2009. [http://www.energymatters.com.au/government-rebates/feedintariff.php#fit-need]</ref> The Mexican government approved small-scale solar grid tie-in in 2007, but there are not yet any laws for wind or hydro power technologies.<ref>Gobierno de Mexico. Diario Oficial de la Secretaria de Energía. Resolucion No. RES/176/2007. 27 Junio 2007.</ref><ref>Mills, Jsun. "Re: Feed-In Tariffs in Mexico." Email with Alta Energía. 26 July 2010.</ref>


==== Permits and Grid Tie-In Feasibility  ====
[[File: FI.pdf|center|thumb]]


*'''Requirements to obtain a permit for construction<ref>''Constancias,Licencias y Permisos,'' Secretary of Public Works and Urban Development, Government of Tuxtla Gutierrez, Capital of Chiapas, http://www.tuxtla.gob.mx/2009/secretaria_obpub.php?sec=licencias</ref>'''
==== Permits and Grid Tie-In Feasibility ====
**Required Application
**Copy of property payment for the year
**Copy of owner´s identification
**Copy of exact location and official updated number
**Sketch of what will be constructed and a copy (architectural and with structural details, legal size or double letter size)
**Copy of feasibility and use of site (in case of commercial use or if there is more than one occupant in the same property)


*According to '''Artículo 192''' from ''La Ley Federal de Derechos'' from ''La Constitución Política de los Estados Unidos Mexicanos,'' applicable fees for use of national water are $2,745.00 (MXN); for use of land within 10 meters of national water are $1,163.00 (MXN)<ref>[http://www.conagua.gob.mx/CONAGUA07/Noticias/LEY_Federal_Derechos.pdf Ley Federal de Derechos]</ref>
* '''Requirements to obtain a permit for construction<ref>''Constancias,Licencias y Permisos,'' Secretary of Public Works and Urban Development, Government of Tuxtla Gutierrez, Capital of Chiapas, http://www.tuxtla.gob.mx/2009/secretaria_obpub.php?sec=licencias</ref>'''
* Required Application
* Copy of property payment for the year
* Copy of owner´s identification
** Copy of exact location and official updated number
* Sketch of what will be constructed and a copy (architectural and with structural details, legal-size or double letter size)
* Copy of feasibility and use of site (in case of commercial use or if there is more than one occupant in the same property)
* According to '''Artículo 192''' from ''La Ley Federal de Derechos'' from ''La Constitución Política de los Estados Unidos Mexicanos,'' applicable fees for use of national water are $2,745.00 (MXN); for use of land within 10 meters of national water are $1,163.00 (MXN)<ref>[http://web.archive.org/web/20090612070506/http://www.conagua.gob.mx:80/CONAGUA07/Noticias/Ley_Federal_Derechos.pdf Ley Federal de Derechos]</ref>
* According to '''Capítulo 3''' of '''Artículo 80''' from ''La Ley de Agua Nacionales'' from La Constitución Políica de los Estados Unidos Mexicanos,''concessions are not required for small scale hydro power projects<ref>Ley de Agua Nacionales]</ref>''


*According to '''Capítulo 3''' of '''Artículo 80''' from ''La Ley de Agua Nacionales'' from La Constitución Políica de los Estados Unidos Mexicanos,''concessions are not required for small scale hydro power projects<ref>[http://www.cddhcu.gob.mx/LeyesBiblio/regley/Reg_LAN.pdf Ley de Agua Nacionales]</ref>''
=== Consideraciones del Medio Ambiente ===


=== Environmental Considerations ===
==== La Clima y la Lluvia ====


==== Climate &amp; Rainfall  ====
El clima y la cantidad de la lluvia de la región determinan el flujo del agua en el río del tiempo. Una ubicación más factible para construir un sistema de microhídro tiene una gama anual de flujo pequeña (contra a un área con una gama amplia de ralentización entre las estaciones). La información de la duración del flujo y los cambios temporales afectan la calculaciones de la energía.<ref>Natural Resources Canada, ''Micro-Hydropower Systems: A Buyer's Guide,'' Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2004).</ref>


The climate and amount of rainfall in a region determines the seasonal water flow in a river. A more feasible location for siting a micro hydro system has a small annual range of flows (as opposed to an area with a wide range of slows between seasons). Information on flow duration and seasonal changes affects energy calculations.<ref>Natural Resources Canada, ''Micro-Hydropower Systems: A Buyer's Guide,'' Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2004) [[File:16047612-Canada-Micro-Hydro-Guide.pdf‎]].</ref>
[[File:16047612-Canada-Micro-Hydro-Guide.pdf|center|thumb]]


<center><gallery>
<center><gallery>
Line 284: Line 266:
</gallery></center>
</gallery></center>


<br>
== Sites ==
 
== Sites ==


=== River near Pueblo Molino de los Arcos ===
=== River near Pueblo Molino de los Arcos ===


&nbsp;&nbsp;&nbsp;&nbsp; [[Image:MolinoDeLosArcos.jpg|thumb|left]]  
[[File:MolinoDeLosArcos.jpg|thumb|left]]


'''Date Visited:''' 12 July 2010<br>'''Flow rate calculated: '''3015 GPM'''<br>Head:''' 30 feet'''<br>Length of Pipe: '''110 feet'''<br>P max: '''17 kW'''<br>P net: '''540 Watts'''<br>GPS&nbsp;Coordinates:&nbsp;'''N 62.8º W -92.6º'''<br>Feasibility:&nbsp;'''The river of Peje de&nbsp;Oro flows through this small&nbsp;community, which lies&nbsp;within San Cristóbal de Las Casas.&nbsp;They currently have a micro hydro system infrastucture such as a weir, turbine house,&nbsp;forebay tank and part of a canal&nbsp;that is not in use. Federal power has been cheap enough to make the cost of repairs unjustifiable, but recently the community expressed an interest in repairing the system. Since the infrastructure is already in place the feasibility study would be on the cost of repairing the canal, replacing parts and getting the system running again.<br>
'''Date Visited:''' 12 July 2010<br>'''Flow rate calculated: '''3015 GPM'''<br>Head:''' 30 feet'''<br>Length of Pipe: '''110 feet'''<br>P max: '''17 kW'''<br>P net: '''540 Watts'''<br>GPS&nbsp;Coordinates:&nbsp;'''N 62.8º W -92.6º'''<br>Feasibility:&nbsp;'''The river of Peje de&nbsp;Oro flows through this small&nbsp;community, which lies&nbsp;within San Cristóbal de Las Casas.&nbsp;They currently have a micro hydro system infrastucture such as a weir, turbine house,&nbsp;forebay tank and part of a canal&nbsp;that is not in use. Federal power has been cheap enough to make the cost of repairs unjustifiable, but recently the community expressed an interest in repairing the system. Since the infrastructure is already in place the feasibility study would be on the cost of repairing the canal, replacing parts and getting the system running again.<br>


=== <br><br>Río de Alcanfores ===
=== Río de Alcanfores ===
 
[[File:Alcanfores.jpg|thumb|left]]


&nbsp;&nbsp;&nbsp;&nbsp; [[Image:Alcanfores.jpg|thumb|left]]<br>
<br>


'''Date Visited: '''17 June 2010'''<br>Flow rate calculated: '''120 GPM'''<br>Head: '''15 feet'''<br>Length of Pipe: '''87 feet''<br>'''''P max: '''670 Watts'''<br>P net: '''220 Watts'''<br>GPS&nbsp;Coordinates: '''N 16º44.730' W 92º38.028''''<br>Feasibility: '''This small river is close to the neighborhood of Alcanfores, outside of San Cristóbal de Las Casas. The amount of power generated by this stream during the rainy season is sufficient enough&nbsp;to consider the site feasible for the construction of a pico-hydro system. This stream is of interest because the community of Alcanfores is near the site surveyed, and a Zapatista community seeking independence from the government lies approximately an hour further upstream. But the amount of available head did not warrant futher investigation of the site.'''<br>'''
'''Date Visited: '''17 June 2010'''<br>Flow rate calculated: '''120 GPM'''<br>Head: '''15 feet'''<br>Length of Pipe: '''87 feet''<br>'''''P max: '''670 Watts'''<br>P net: '''220 Watts'''<br>GPS&nbsp;Coordinates: '''N 16º44.730' W 92º38.028''''<br>Feasibility: '''This small river is close to the neighborhood of Alcanfores, outside of San Cristóbal de Las Casas. The amount of power generated by this stream during the rainy season is sufficient enough&nbsp;to consider the site feasible for the construction of a pico-hydro system. This stream is of interest because the community of Alcanfores is near the site surveyed, and a Zapatista community seeking independence from the government lies approximately an hour further upstream. But the amount of available head did not warrant futher investigation of the site.'''<br>'''
Line 302: Line 284:
<br>
<br>


=== <br>Río Jataté en el Pueblo de Corralito ===
=== Río Jataté en el Pueblo de Corralito ===
 
[[File:ElCorralito.jpg|thumb|left]]
 
<br>


&nbsp;&nbsp;&nbsp;&nbsp; [[Image:ElCorralito.jpg|thumb|left]]<br>
'''Date Visited:''' 14 July 2010<br>'''Feasibility:''' This site lies a bit further from San Cristóbal de Las Casas on the way to Ocosingo and Palenque. Winding down out of the mountains, we could see that the vegetation grew more lush and the maps indicated that heading in this direction would be an ideal zone in terms of rainfall, topographic variety and community location. Corralito is a tiny farming community known for its small touristic attraction of a waterfall in the headwaters of Río Jataté, which goes on to power the Cascadas of Agua Azul.&nbsp;We did not take measurements of its width and depth due to lack of both time and proper introduction to the community. We did speak with a local agronomist, who informed us that the local power lines came from the&nbsp;CFE and we observed a billboard near the center of the community reading that it was being supported by government construction, which could prove useful as a source of grants. We also passed many signs&nbsp;posted outside of autonomous&nbsp;communities reading that they were in protest of paying high government taxes for electricity to power their lights, which may present opportunities for further investigation.


'''Date Visited:''' 14 July 2010 <br>'''Feasibility:''' This site lies a bit further from San Cristóbal de Las Casas on the way to Ocosingo and Palenque. Winding down out of the mountains, we could see that the vegetation grew more lush and the maps indicated that heading in this direction would be an ideal zone in terms of rainfall, topographic variety and community location. Corralito is a tiny farming community known for its small touristic attraction of a waterfall in the headwaters of Río Jataté, which goes on to power the Cascadas of Agua Azul.&nbsp;We did not take measurements of its width and depth due to lack of both time and proper introduction to the community. We did speak with a local agronomist, who informed us that the local power lines came from the&nbsp;CFE and we observed a billboard near the center of the community reading that it was being supported by government construction, which could prove useful as a source of grants. We also passed many signs&nbsp;posted outside of autonomous&nbsp;communities reading that they were in protest of paying high government taxes for electricity to power their lights, which may present opportunities for further investigation.
=== Parque Ecología Las Canastas, San Cristóbal ===


=== &nbsp;Parque Ecología Las Canastas, San Cristóbal de Las Casas  ===
[[File:LasCanastas.jpg|thumb|left]]


&nbsp;&nbsp;&nbsp;&nbsp; [[Image:LasCanastas.jpg|thumb|left]]<br>
<br>


<br>'''Date Visited:''' 21/23 July 2010<br>'''Flow rate calculated:''' 197,800 GPM<br>'''Head: '''15 Feet<br>'''Length of Pipe: '''80 feet'''<br>P max:''' 558 kW<br>'''P net:''' 220 Watts<br>'''GPS&nbsp;Coordinates:''' N 16º43.969' W 092º36.135'<br>'''Feasibility:''' This site is situated just&nbsp;outside of San Cristóbal de Las Casas behind the neighborhood of La Revolución. A&nbsp;weir and canal have already been constructed on this site for irrigation purposes. A road brings you about 100 feet from the dam. The fact that&nbsp;some of the infrastructure necessary for a hydro set up makes this location very promising.&nbsp;We spoke with&nbsp;a local resident who told&nbsp;us the river had&nbsp;relatively steady year-round flow.&nbsp;There are a few homes, a permaculture community that we learned about which may be constructed&nbsp;in the hills above the river and a nearby factory that may be interested in the generation of micro-hydro power. Although our RETScreen analysis did not indicate a current feasibility, more accurate river flow data, a grant or&nbsp;subsidy from the government for the community, or interest from the factory may be enough to change the financial circumstances.  
<br>'''Date Visited:''' 21/23 July 2010<br>'''Flow rate calculated:''' 197,800 GPM<br>'''Head: '''15 Feet<br>'''Length of Pipe: '''80 feet'''<br>P max:''' 558 kW<br>'''P net:''' 220 Watts<br>'''GPS&nbsp;Coordinates:''' N 16º43.969' W 092º36.135'<br>'''Feasibility:''' This site is situated just&nbsp;outside of San Cristóbal de Las Casas behind the neighborhood of La Revolución. A&nbsp;weir and canal have already been constructed on this site for irrigation purposes. A road brings you about 100 feet from the dam. The fact that&nbsp;some of the infrastructure necessary for a hydro set up makes this location very promising.&nbsp;We spoke with&nbsp;a local resident who told&nbsp;us the river had&nbsp;relatively steady year-round flow.&nbsp;There are a few homes, a permaculture community that we learned about which may be constructed&nbsp;in the hills above the river and a nearby factory that may be interested in the generation of micro-hydro power. Although our RETScreen analysis did not indicate a current feasibility, more accurate river flow data, a grant or&nbsp;subsidy from the government for the community, or interest from the factory may be enough to change the financial circumstances.


=== Parque Ecoturística Arcotete, San Cristóbal&nbsp; ===
=== Parque Ecoturística Arcotete, San Cristóbal&nbsp; ===


&nbsp;&nbsp;&nbsp;&nbsp; [[Image:ElArcotete.jpg|thumb|left]]<br>
&nbsp;&nbsp;&nbsp;&nbsp; [[File:ElArcotete.jpg|thumb|left]]<br>


'''Date Visited:''' 23 July 2010<br>'''Feasibility:''' This river is part of an ecological park outside of San Cristóbal de Las Casas further upstream from Las Canastas along the same river. Attempting to test the flow of the river proved unsuccessful. Matt took one step into the river and immediately began sinking rapidly into the mud. Tests were discontinued for safety reasons. In addition to difficult testing conditions there did not appear to be any communities nearby. For these reasons Arcotete was ruled out as a feasible location, however should a community&nbsp;someday form, we can&nbsp;extrapolate from&nbsp;our word-of-mouth information on the flow data&nbsp;in Las Cnastas&nbsp;that the&nbsp;site maintains a strong year-round&nbsp;flow.<br><br>
'''Date Visited:''' 23 July 2010<br>'''Feasibility:''' This river is part of an ecological park outside of San Cristóbal de Las Casas further upstream from Las Canastas along the same river. Attempting to test the flow of the river proved unsuccessful. Matt took one step into the river and immediately began sinking rapidly into the mud. Tests were discontinued for safety reasons. In addition to difficult testing conditions there did not appear to be any communities nearby. For these reasons Arcotete was ruled out as a feasible location, however should a community&nbsp;someday form, we can&nbsp;extrapolate from&nbsp;our word-of-mouth information on the flow data&nbsp;in Las Cnastas&nbsp;that the&nbsp;site maintains a strong year-round&nbsp;flow.<br><br>
Line 322: Line 308:
<br><br>
<br><br>


== System Designs  ==
== Los Diseños de los Sistemas ==
 
Both systems at the two most feasible sites of Las Canastas and Molino de los Arcos are designed to be AC integrated systems. AC integrated systems bring the generated electricity directly to a user, unlike a battery system where the user must pick up a charged battery at the powerhouse. The available power is limited by the potential of the stream. If the site has enough flow and head, this system can be designed to the highest load requirement of the community.<ref>Cunningham, Paul. Homepower Magazine. "Microhydro Electricity Basics" [http://web.archive.org/web/20120625055734/https://homepower.com/basics/hydro/ Homepower Magazine]</ref>
<center>[[File:ACDirect.jpg|thumb|center|Figure 3: Image credited to: [http://web.archive.org/web/20120625055734/https://homepower.com/basics/hydro/ Homepower Magazine]]] </center>
<br>


Both systems at the two most feasible sites of Las Canastas and Molino de los Arcos are designed to be AC integrated systems. AC integrated systems bring the generated electricity directly to a user, unlike a battery system where the user must pick up a charged battery at the powerhouse. The available power is limited by the potential of the stream. If the site has enough flow and head, this system can be designed to the highest load requirement of the community. <ref>Cunningham, Paul. Homepower Magazine. "Microhydro Electricity Basics" [http://homepower.com/basics/hydro/#MicrohydroElectricSystemComponents Homepower Magazine]</ref>
Ambos sistemas de los dos sitios más factibles de Las Canastas y Molino de los Arcos están diseñado para sistemas del corriente alternado. Los sistemas de corriente alternado lleva la electricidad generada directamente al consumidor, diferente de un sistema de pilas en que el consumidor tiene que llevar una pila encargada de la casa de la turbina. La energía disponible está limitadi por la potencial del arroyo. Si el sito tenga suficiente flujo, se podrá diseñar este sistema al requisito lo más alto de la carga de la comunidad.<ref>Cunningham, Paul. Homepower Magazine. "Microhydro Electricity Basics" [http://web.archive.org/web/20120625055734/https://homepower.com/basics/hydro/ Homepower Magazine]</ref>
<center>[[Image:ACDirect.jpg|thumb|center|Figure 3: Image credited to: [http://homepower.com/basics/hydro/#MicrohydroElectricSystemComponents Homepower Magazine]]] </center>
<br>  


==== Las Canastas ====
==== Las Canastas ====


The system at Las Canastas is designed for a low head, high flow situation. We selected the Ampair UW100 Water Turbine, which is a submersible reaction turbine that gets energy from being placed directly in the river. <ref>[http://www.absak.com/catalog/product_info.php/cPath/33_89_90/products_id/3fckLR ABSAK]</ref> This system was designed to be grid-connected and therefore utilizes transmission wire to deliver the electricity to the consumers.  
El sistema en Las Canastas está diseñado para una situación que falta la caída, pero tiene mucho flujo. Escogimos la Ampair UW100 Turbina de Agua, que es una turbina de reacción que se puede poner a dentro del agua que obtiene la energía por su lugar directamente en el río.<ref>[http://www.absak.com/catalog/product_info.php/cPath/33_89_90/products_id/3fckLR ABSAK]</ref> Este sistema fue deseñado para ser conectado al red de electricidad y por eso utiliza el cable de transmisión para llevar la electricidad a los consumidores.


<br><center><gallery>
<br><center><gallery>
Line 336: Line 324:
</gallery></center>
</gallery></center>


==== Molino de los Arcos ====
==== Molino de los Arcos ====
 
Molino de los Arcos has an existing micro hydro infrastructure that has been unused for a number of years, so much of the design of this system is dependent upon repairing the existing parts. Water will be diverted from the river with an approximately 1 kilometer long canal that will be constructed out of concrete and rebar. The penstock will be replaced with about 100 feet of 28" diameter pipe leading down to the turbine house. The turbine house will get a new 12kW turbine and generator. Upgrades to the transmission line system may be required as the new load may be more than when the system was originally in place.


Molino de los Arcos ya tiene la infrastructura de microhídro que no ha estado usada para algunos años, pues mucho del diseño de este sistema es dependiente en reparando los partes que ya existen. El agua estará divertido del río con un canal que es aproximadamente 1 kilometro que estará construido de concreto y rebar. El conducto forzado estará reemplazado con aproximadamente 100 pies de tubo con un diámetro de 28 pulgadas que va a la casa de turbina. La casa de turbina recibirá una turbina nueva de 12 kilowatts y un generador. Es posible que el sistema de cable de transmisión vaya a requirir algunas mejoras porque posiblemente la carga nueve sea más que lo que el sistema tenía originalmente.


<br><center><gallery>
<br><center><gallery>
Image:OverviewWithLand.png|Diagram of the whole system, including a terrain overview.
Image:OverviewWithLand.png|Diagram of the whole system, including a terrain overview.
Image:Weir.png|The weir diverts a percentage of the river down the canal that leads to the turbine.  
Image:Weir.png|The weir diverts a percentage of the river down the canal that leads to the turbine.
Image:Canal.png| The canal leads into a penstock that brings the water to the turbine in the powerhouse.
Image:Canal.png| The canal leads into a penstock that brings the water to the turbine in the powerhouse.
Image:EndOfSystemGroundView.png|Components at the end of the system.
Image:EndOfSystemGroundView.png|Components at the end of the system.
Image:OverviewWOLand.png|Diagram of the whole system. All images Created by Jessica Lamb.  
Image:OverviewWOLand.png|Diagram of the whole system. All images Created by Jessica Lamb.
</gallery></center>
</gallery></center>


<center><tt><nowiki /></tt>{{Video|hOrXE22nCPQ}}''<br>''</center>


<center><tt><nowiki /></tt>{{#widget:YouTube|id=hOrXE22nCPQ}}''<br>''</center>
== Conclusión ==
 
== Conclusion/Conclusión ==
 
=== Assumptions Used for Results/Suposiciones Usados para los Resultados ===
 
*Yearly river flow data extrapolated from Rio Grijalva. A river in Chiapas, but not connected to Peje de Oro. Awaiting more accurate data.
*Construction worker wages and predicted meters of canal construction in a day. Based on quotes from construction workers in town.
*Carbon credits can be sold on the international market. International Market price from http://www.3degreesinc.com/ This price is not region specific. It will most likely vary because the value of carbon credits depends on how dirty the electricity generation is in each region.
*Feed in tariffs for micro hydro are legal. Some sources say yes, some sources say only for solar.


=== Sitio Propuesto y Suposiciones''<br>'' ===
=== Suposiciones Usados para los Resultados ===


''Para estimar la fiabilidad de nuestro sistema extrapolamos los valores del flujo de todo el año del río con datos del cercano Río Grijalva. Hemos inidicado el trámite de obtener datos más específicos del río Peje de Oro que fluye por Molino de Los Arcos. También estimamos nuestros costos laborales del sueldo de obreros locales de la construcción y cálculos aproximados de la eficiencia del trabajo obtenidos de las conversaciones con trabajadores y albañiles locales. Los precios de los créditos carbonos que utilizamos fueron obtenidos de los precios corrientes en el mercado internacional y no son específicos para la región. Encontramos información contradictoria sobre la legalidad de las tarifas para conectarse a la red eléctrica en México para el poder micro-hidroeléctrico, pero está legal conectarse directamente a la red eléctrica para los productores de la energia solar y ellos reciben tarifas.<br>''
* Los datos anuales del flujo del río vinieron del Río Grijalva que es un río en Chiapas, pero no está conectado a Peje de Oro. Esperamos datos más precisos.
* Los salarios de los obreros de construcción y metros de construcción del canal cada día estimado. Basado en citas de obreros de construcción en San Cristóbal de Las Casas.
* Se puede vender los créditos de carbono en el mercado internacional. El precio del mercado internacional de http://www.3degreesinc.com/. Este precio no es específico al región. Probablemente variará debido al valor de los créditos de carbono depende de cómo sucia está la generación de electricidad en cada región
* Las tarifas para conectar al red de electricidad para microhídro son legales. Algunas fuentes dicen sí, y algunas dicen solamente para solar.


=== Feasibility Study Results/Resultados del Estudio de Factibilidad  ===
=== Sitio Propuesto y Suposiciones ===


For this study Team Micro Hydro utilized/RetScreen, free software provided by Canada to evaluate renewable energy projects internationally. We inputted our projects infrastructure costs, various estimated feed-in tariffs based on CFE (Comisión Federal de Electricidad) electricity prices, the going rate for carbon credits on the international market and projected annual maintenance fees. The program then calculates based on the kW of the system when the system will pay for itself. This is where the feasibility study becomes less accurate based on the time constraints of the project. The governmental organizations could not get back to us in time with specific year round hydrological data for our specific site, therefore&nbsp;data for a substitute Chiapas river was used to extrapolate year round flow for Peje de Oro. The river was Río Grijalva and the data can be viewed in this pdf <ref>http://www.apfm.info/pdf/case_studies/cs_mexico.pdf</ref>.The extrapolated data based on this source for Río Peje de Oro can be viewed in this excel spreadsheet. [[Image:Hydrodata.xls]]
Para estimar la fiabilidad de nuestro sistema extrapolamos los valores del flujo de todo el año del río con datos del cercano Río Grijalva. Hemos inidicado el trámite de obtener datos más específicos del río Peje de Oro que fluye por Molino de Los Arcos. También estimamos nuestros costos laborales del sueldo de obreros locales de la construcción y cálculos aproximados de la eficiencia del trabajo obtenidos de las conversaciones con trabajadores y albañiles locales. Los precios de los créditos carbonos que utilizamos fueron obtenidos de los precios corrientes en el mercado internacional y no son específicos para la región. Encontramos información contradictoria sobre la legalidad de las tarifas para conectarse a la red eléctrica en México para el poder micro-hidroeléctrico, pero está legal conectarse directamente a la red eléctrica para los productores de la energia solar y ellos reciben tarifas.<br>


The following results are for the two sites we studied most intensively: Las Canastas and Molino de Los Arcos. The three graphs for each are based on the potential feed in rates. The first graph&nbsp;indicates the going electricity rate for region 1 minus ten percent for administrative fees, and includes profits from GHG emissions credits. The second&nbsp;shows the tariff as if the community formed it's own power company and gave a thirty percent discount based on CFE electricity prices. The third&nbsp;displays the region 1 tariff minus a forty percent administrative fee with no GHG emissions credits. Links to the RetScreen excels for each situation can be found in each graph´s caption.
=== Resultados del Estudio de Factibilidad ===


''Para este estudio, el equipo de Team Micro Hydro utilizó RetScreen, un software proveido gratis por el estado de Canada para evaluar proyectos de energía renovable internacionalmente. Entramos nuestros costos de la infraestructura, varias tarifas de introducción de energía renovable a la red eléctrica basadas en los precios de la CFE (Comisión Federal de Electricidad), el precio corriente para los créditos de carbón en el mercado internacional y las cuotas previstas de mantener al sistema anualmente. Basado en las kilowatt-horas que podría generar el sistema, el programa RetScreen calcula cuando la producción de electricidad va a recuperar los costos de la instalación inicial. En este paso, el studio de la factibilidad no está muy exacto tomando en cuento los límites del tiempo del proyecto. Los ONGs (Organizaciones No-Gubernamentales) no nos podían decir antes de terminar el estudio con datos específicos de la hídrologia de la zona, entonces el flujo de&nbsp;los meses del año&nbsp;para el sitio de&nbsp;Peje de Oro fue estimado con datos sustituítos&nbsp;del otro&nbsp;río chiapaneco, el Río Grijalva. El data se puede ver en este pdf.<ref>http://www.apfm.info/pdf/case_studies/cs_mexico.pdf</ref> Los datos extrapolados se puede ver en esta hoja de cálculo. ''''[[Image:Hydrodata.xls]]''
Para este estudio, el equipo de Team Micro Hydro utilizó RetScreen, un software proveido gratis por el estado de Canada para evaluar proyectos de energía renovable internacionalmente. Entramos nuestros costos de la infraestructura, varias tarifas de introducción de energía renovable a la red eléctrica basadas en los precios de la CFE (Comisión Federal de Electricidad), el precio corriente para los créditos de carbón en el mercado internacional y las cuotas previstas de mantener al sistema anualmente. Basado en las kilowatt-horas que podría generar el sistema, el programa RetScreen calcula cuando la producción de electricidad va a recuperar los costos de la instalación inicial. En este paso, el studio de la factibilidad no está muy exacto tomando en cuento los límites del tiempo del proyecto. Los ONGs (Organizaciones No-Gubernamentales) no nos podían decir antes de terminar el estudio con datos específicos de la hídrologia de la zona, entonces el flujo de&nbsp;los meses del año&nbsp;para el sitio de&nbsp;Peje de Oro fue estimado con datos sustituítos&nbsp;del otro&nbsp;río chiapaneco, el Río Grijalva. El data se puede ver en este pdf.<ref>http://www.apfm.info/pdf/case_studies/cs_mexico.pdf</ref> Los datos extrapolados se puede ver en esta hoja de cálculo. ''[[File:Hydrodata.xls]]''


''Los resultos siguientes son de los dos sitios en cuales enfocamos la mayoría de nuestro sitio: Las Canastas y Molino de Los Arcos. Los tres gráficos de cada uno están basados en las tarifas potenciales de energía a la red eléctrica.&nbsp;El gráfico primero&nbsp;indica el precio corriente de la electricidad de región 1 menos diez porciento para las cuotas administrativas,&nbsp;con las ganancias de los créditos de carbón incluso. El segundo se muestra la tárifa como si la comunidad hubiera formado su empresa propia de electricidad y hubiera dado un descuento de treinta porciento basado en&nbsp;el precio de la electricidad&nbsp;de la CFE. El tercero usa la tarifa de región 1 menos cuarenta porciento para las cuotas administrativas, sin los créditos de carbón. Enlaces a las hojas de cálculo para cada situación hipotética se puede encontar en el pie de cada gráfico.''
Los resultos siguientes son de los dos sitios en cuales enfocamos la mayoría de nuestro sitio: Las Canastas y Molino de Los Arcos. Los tres gráficos de cada uno están basados en las tarifas potenciales de energía a la red eléctrica.&nbsp;El gráfico primero&nbsp;indica el precio corriente de la electricidad de región 1 menos diez porciento para las cuotas administrativas,&nbsp;con las ganancias de los créditos de carbón incluso. El segundo se muestra la tárifa como si la comunidad hubiera formado su empresa propia de electricidad y hubiera dado un descuento de treinta porciento basado en&nbsp;el precio de la electricidad&nbsp;de la CFE. El tercero usa la tarifa de región 1 menos cuarenta porciento para las cuotas administrativas, sin los créditos de carbón. Enlaces a las hojas de cálculo para cada situación hipotética se puede encontar en el pie de cada gráfico.


==== Las Canastas ====
==== Las Canastas ====


<gallery>
<gallery>
Image:canastasten.png|Including selling carbon credits and a ten percent tariff on CFE region 1 electricity prices [[File:canastas10.pdf]]
Image:canastasten.png|Including selling carbon credits and a ten percent tariff on CFE region 1 electricity prices [[File:canastas10.pdf|thumb]]
Image:canastasthirty.png|Including selling carbon credits and as if the community formed a power company and sold electricity at a thirty percent discount on CFE's electricity prices [[File:canastas30.pdf]]
Image:canastasthirty.png|Including selling carbon credits and as if the community formed a power company and sold electricity at a thirty percent discount on CFE's electricity prices [[File:canastas30.pdf|thumb]]
Image:canastasfourty.png|Including a forty percent tariff on CFE region 1 electricity prices [[File:canastas40.pdf]]
Image:canastasfourty.png|Including a forty percent tariff on CFE region 1 electricity prices [[File:canastas40.pdf|thumb]]
</gallery>  
</gallery>


==== Molino de los Arcos ====
==== Molino de los Arcos ====


<gallery>
<gallery>
Image:Mten.png|Including selling carbon credits and a ten percent tariff on CFE region 1 electricity prices http://docs.google.com/leaf?id=0B_crCcuoib_QOTc1MDVjMTUtMzdlYy00ZDViLTlkN2YtZTFiNTJhZDQ1YTFh&sort=name&layout=list&num=50
File:Mten.png|Including selling carbon credits and a ten percent tariff on CFE region 1 electricity prices
Image:Mthirty.png|Including selling carbon credits and as if the community formed a power company and sold electricity at a thirty percent discount on CFE's electricity prices http://docs.google.com/leaf?id=0B_crCcuoib_QYTc3ZmY5MTUtYzlkMS00YmY4LWJhNzEtMDc5MGE1OGZlYWFi&sort=name&layout=list&num=50
File:Mthirty.png|Including selling carbon credits and as if the community formed a power company and sold electricity at a thirty percent discount on CFE's electricity prices
Image:Mfourty.png|Including a forty percent tariff on CFE region 1 electricity prices http://docs.google.com/leaf?id=0B_crCcuoib_QNjUzYTRjN2EtNjNhZi00ODBmLWJlZjYtMGRlN2YzNzNjZTE5&sort=name&layout=list&num=50
File:Mfourty.png|Including a forty percent tariff on CFE region 1 electricity prices
 
</gallery>
</gallery>  


<br>
<br>


<br>As we can see from the graphs the cost-benefits ratio of this particular system at Las Canastas is never favorable. We advise against pursuing a micro hydro system at Las Canastas. At Molino de Los Arcos we have found a more promising cost-benefit ratio estimate. The pay back period for the best case scenario is about 18 years. In the second case it is about 22 years. In the third and worse case scenario it is about 25 years. <br>
Como se puede ver en los gráficos la&nbsp;relación costo/beneficio&nbsp;de este&nbsp;sistema específico en Las Canastas nunca favorece. Aconsejamos que no se persiga un sistema de microhídro en Las Canastas. En Molino de Los Arcos encontramos una relación costo/beneficio presupuesta que se luzca&nbsp;más prometedor. El tiempo necesario para recuperar los costos para el caso mejor es aproximadamente 18 años. En el caso segundo es aproximadmente 22 años. En el caso tercero y peor es aproximademnte 25 años.
 
''Como se puede ver en los gráficos la&nbsp;relación costo/beneficio&nbsp;de este&nbsp;sistema específico en Las Canastas nunca favorece. Aconsejamos que no se persiga un sistema de microhídro en Las Canastas. En Molino de Los Arcos encontramos una relación costo/beneficio presupuesta que se luzca&nbsp;más prometedor. El tiempo necesario para recuperar los costos para el caso mejor es aproximadamente 18 años. En el caso segundo es aproximadmente 22 años. En el caso tercero y peor es aproximademnte 25 años.''
 
=== Suggestions  ===


[http://www.cepis.org.pe/bvsacd/cd27/vocabulario.pdf Technical Vocabulary of Renewable Energies in English-Spanish and Spanish-English]
=== Sugerencias ===


=== Next Steps and Lessons Learned/Próximos Pasos y Lecciones Aprendidas&nbsp;  ===
[http://www.cepis.org.pe/bvsacd/cd27/vocabulario.pdf Technical Vocabulary of Renewable Energies in English-Spanish and Spanish-English]


The next steps for this project are to wait for the more specific and accurate hydrological data to be delivered from the National Water Comission (CONAGUA). With this data a more accurate feasibility study can be completed. Also, the method we researched for fixing the canal (cement and rebar) made the pay back period long. We suggest researching different methods to build the canal. We also suggest using this study to try to secure grants for the system.
=== Próximos Pasos y Lecciones Aprendidas ===


A big cultural lesson we learned from this project is that it can be difficult to obtain technical data in Mexico if one cannot receive it in person. Nearly all the e-mail communications between our team and Mexican bureaucrats failed to produce the necessary data. On the other hand, when we met face-to-face with local people and officials such as CONAGUA in Tuxtla Gutierrez we found the people extremely helpful and open.<br>
Los próximos pasos para este proyecto incluyen esperar para los datos hidrológicos más específicos de la Comisión Nacional del Agua (CONAGUA). Con esta información un estudio de la factibilidad se puede completar con más precisión. Además, el método que investigamos para reparar el canal usando cemento y rebar alargó el tiempo necesario para recuperar los costos. Aconsejamos que se investigue otros métodos para construir el canal utilizando este estudio para obtener una subvención para el sistema.


''Los próximos pasos para este proyecto incluyen esperar para los datos hidrológicos más específicos de la Comisión Nacional del Agua (ConAgua). Con esta información un estudio de la factibilidad se puede completar con más precisión. Además, el método que investigamos para reparar el canal usando cemento y rebar alargó el tiempo necesario para recuperar los costos. Aconsejamos que se investigue otros métodos para construir el canal utilizando este estudio para obtener una subvención para el sistema.''
Una lección que aprendimos de este proyecto es qué puede ser muy difícil obtener datos medioambiental por Internet o correo en México. Por el otro lado, cuando nos enfrentamos cara-a-cara con la gente local obteníamos datos circunstanciales. Además, cuando reunamos con los oficiales de ConAgua, en Tuxtla Gutiérrez, ellos nos oferten a enviar datos en dos meses.<br>


''Una gran lección que aprendimos de este proyecto se qué puede ser muy difícil obtener datos técnicos en México si uno no se puede recibirlos en persona. Casi toda la comunicación por e-mail entre nuestro equipo y los burócratas Mexicanos fracasaron en producir los datos necesarios. Por el otro lado, cuando nos enfrentamos cara-a-cara con la gente local y los oficiales de ConAgua en Tuxtla Gutierrez encontramos a unas personas sumamente amables y abiertas.''<br>
== Referencias ==


== References  ==
<references />


<references/>
{{Page data
| keywords = water
| authors = User:MeghanHeintz, User:Jessica.s.lamb, User:Rayrivera, User:Mattallan
| language = es
| derivative-of = Practivistas Chiapas micro hydro feasibility study
}}


[[Category:HSU_Chiapas_Program_2010]]
[[Category:HSU Chiapas Program]]
[[Category:HSU Chiapas Program 2010]]
[[Category:Microhydro]]
[[Category:Appropriate technology videos]]
[[Category:Water videos]]
[[Category:Water]]

Latest revision as of 15:24, 23 October 2023

BlackBoxPicture.png


Somos un pequeño equipo de estudiantes de licencia en Cal Poly Humboldt trabajando en un proyecto para investigar la factibilidad de construir, instalar, utlizar y mantener un sistema de micro-hídro para proveer la electricidad para una comunidad rural cerca de San Cristóbal de las Casas, Chiapas, México. Las pruebas de la factibilidad van a incluir estudio del poder potencial que se puede extraer de varios ríos y un estudio de las materias disponibles de construcción y costos de operación. Si el estudio de la factibilidad recomienda la implementación, el diseño y la construcción de este proyecto, quizás será implementado por otra parte en un futuro cercano. Tal acción sería coordinado con la comunidad que beneficiaría del sistem de micro-hídro.

mqdefault.jpgYouTube_icon.svg

Antecedentes[edit | edit source]

El poder hidroeléctrico ya es un método comun de generar energia en México.Lo constituye 26.2% de la electricidad del país, pero es generado principalmente por presas grandes que causan daños a los ecosistemas que rodean los ríos.[1] La meta de este proyecto era investigar la factibilidad de los sistemas de micro-hídro, cuales por definición generan menos electricidad pero tienen un más benévolo impacto medioambental. Las comunidades autónomas y el terreno montañoso de Chiapas parezcan indicar circunstancias positivas para el poder micro-hídro. El descenso en la elevación quizás provea la cantidad de caída necesaria para generar suficiente energía de un sistema del poder microhídro.

Aunque Chiapas sigue siendo uno de los estados más pobres de México, el estado contribuye una gran porción de la electricidad del país. Desafortunadamente, sólo 8% de los usuarios de la electricidad constituye para 50% del uso eléctrico del estado porque la Comisión Federal de la Electricidad (CFE) impone tarifas a comunidades que no pueden pagar para poder eléctrico.[2] Por eso, muchas cercanas comunidades Zapatistas y autónomas están en resistencia de pagar para la electricidad y han aprendido mantener sus propios cables de la luz.[3] Tales comunidades pueden por consiguiente beneficiar de la independencia aumentada aportado del poder micro-hídro para sus requirimientos de la luz, refrigeración de las medicinas y mantenimiento de los sistemas de comunicación.

Las Alternativas de la Energía Locales[edit | edit source]

El modo principal para generar la energía en Chiapas es energía hidroeléctrica de una escala grande. El Cañon de Sumidero es una atracción popular para los turistas y al fin del viaje hay una presa grande y un central eléctrica visible. Esta presa se llam Chicasen y es la quinta más grande del mundo. La energía hidroeléctrica de una escala grande tiene varios desventajas importantes. Según New Scientist,[4] las presas de la energía hidroeléctrica producen cantidades considerables de metano y dióxido de carbono. También, destruyen los ecosistemas y altera la migración de algunas poblaciones de peces y causan inundaciones.

El Microhídro en América Central[edit | edit source]

  • Chel, Quiché, Guatemala[5]
    La comunidad rural de Chel está localizada en la región al norte de Quiché, Guatemala. Este área fue muy afectada por la Guerra Civil de Guatemala, que lo dejó sin acceso al al agua, la energía, o la transportación. La gente de Chel confió en la Fundación Solar (una organización no lucrativa) para organizar la planeficación y instalación del sistema de microhídro. Éste significó un gran paso hacia la curación del miedo del mundo afuera creado por el masacre de Chel durante la guerra. La gente trabajó unida para construir un camino para entrar en la comunidad y llevando las necesidades en pie del pueblo. El sistema de microhídro fue construido en el año 2000 y provee 110 kilowatts de energía para 440 hogares. La comunidad estaba muy entusmada sobre los mejoramientos de la calidad de la vida creado por tener la electricidad. Estos merjoramientos incluyeron el compramiento de un teléfono satelite empoderado usando solar que generó dinero para Chel porque salvó las comunidades alrededores un viaje de 10 horas para encontrar un teléfono. El éxito del teléfono los ayudó a tener dinero suficiente para comprar una máquina de fax, una computadora, y una camioneta para transportar las necesidades. La introducción de la energía de microhídro dio poder al pueblo de Chel para planear su futura en vez de tener miedo de la vida afuera.
USAIDGuatemala.pdf
  • La Pita del Carmen, Nicaragua[6]
    La comunidad de La Pita del Carmen está ubicada en Nicaragua al norte y tiene una población de casi 400 personas. El norte de Nicaragua es el hogar de muchos combatantes relocalizados de la Guerra Civil de Nicarague de 1980-90 quienes comunidades faltan la electricidad y están localizadas lejos de la infrastructura del poder federal. La Pita del Carmen está ubicada 70 kilometros de una fuente de energía, entonces un sistema de microhídro les proveió con una manera rentable para traer la electricidad al pueblo y ponerlos en el camino para el crecimiento económico del futuro. La Asociación del Trabajadores del Desarollo Renovable (ATDER) ayudó con la coordinación del sistema que trajo la electricidad a los hogares, campesinos, negocios, y las escuelas locales por primera vez. El sistema de microhídro en el Río La Pita comenzó a operar en el año 2000 y provee la gente con 120,000 kilowatt-horas cada año. Es uno de cuatro instalaciones de microhídro planeado por ATDER en el norte de Nicaragua en los años siguentes. También la comunidad se benefició de vencer contra las diferencias creadas por la guerra civil para trabajar unido hacia una meta
  • Camata, Department of La Paz, Bolivia[7]
    Camata is a small subsistence community of 70 households whose people live mainly by producing coffee, chile and corn. The hydro installation provides 27 kilowatts of power that provides electricity to homes, a police station and a school as well as a new agro-processing plant. The agro-processing plant is the perfect complement to the micro hydro installment for Camata because the plant uses the same power during the day that households use in the evening. The plant helps both save and generate income for Camata: it provides the locals with a way to process their crops of coffee, corn, and chile instead of selling their crops to someone else for processing. Members of surrounding communities can sell their products to the plant instead of taking them to town. The community formed the Committee for Electrification after the suggestion that their location was ideal for micro hydro by the Hydraulic and Hydrology Institute. The Committee for Electrification was responsible for the planning and construction of the hydro system and agro-plant and now oversees power regulations and system operations.
  • Camata, Department of La Paz, Bolivia[8]

Advice from a Local Water Engineer[edit | edit source]

During our visit to the technical department of the National Water Commission (CONAGUA) we spoke to a water engineer. He relayed some information that his organization and other groups working on feasibility studies discovered about micro hydro feasibility in San Cristobal de Las Casas. It appears that much like the City of México, D.F., San Cristóbal de Las Casas was previously located on top of a lake. As the population grew a solution had to be found to remove the water from the city. A tunnel was constructed and the water was removed from the city and transported to barren land. The water from the lake that was San Cristóbal suddenly made this land viable for cultivation and a farming community grew there. Previous hydrological and micro hydro studies in San Cristóbal concluded that micro hydro systems would only be efficient during the rainy months of the year in the mountains far outside the city. In order to reach an ideal cost-benefit ratio, the system must be closer to the center of the city. This presents a problem in disrupting the irrigation of farming communities that were created by the tunnel. Although we are researching run-of-the-river systems that do not impede water flows to these communities, micro hydro systems are therefore seen as a threat to their livelihood. Near the center of San Cristóbal there exists much resistance to micro hydro and heightened tension whenever the topic is broached.[9]

Criteria[edit | edit source]

Criteria Description Weight
Aesthetics Meets cultural needs. 6
Community Involvement Community has interest and need. 5
Cost Efficiency Cost/kW, availability of local materials, and low maintenance. 9.5
Educational System educates community about sustainable energy. 6
Environmental Effect Diverts an appropriate amount of water and does not harm aquatic life. 7
Location of Site Close to community with access to a continuously reliable water source. 9.5

¿Qué es Microhídro?[edit | edit source]

Simplemente, los sistemas del microhídro utilizan la energía cinética del agua cayendo para girar una turbina que convierte la energía cinética en la energía mecánica. Se puede usar la energía mecánica o para girar ruedas de agua o un generador puede convertir la energía mecánica en corriente continua eléctrica. Se puede usar el microhídro para dar energía a comunidades remotos o para proveer un recurso de energía renovable a una red de electricidad que ya existe.[10]

Aquí está una película pequeña sobre las ideas basicas de cómo funciona la energía eléctrica del microhídro. Éste es solamente un ejemplo de un sistema de microhídro. Hay varios diseños que se pueden usar dependiendo de las condiciones de su propio sitio.

mqdefault.jpgYouTube_icon.svg

Componentes del Sistema de Micro-Hídro[edit | edit source]

Un sistema de micro-hídro utilizaría una toma para desviar una parte del flujo del río. Luego este agua pasaría por un filtro de detritos y un canal a una cámara de carga que está situada por encima de la casa de máquinas. Desde la cámara de carga el agua fluye através de un conducto forzado cuesta abajo de un cerro, en donde se acumula una presión neto, menos la fricción perdida al tubo y empalmes, que le llamamos la caída. Esta caída accelera la fuerza con que el agua gira una turbina y aumenta la cantidad de la electricidad que se puede generar. Luego el agua vuelve al flujo del río por un canal de 'descarga. La energía mecánica de la turbina puede ser convertido en energía eléctrica através de un generador, cuyo corriente hay que ser mantenido por un controlador y luego puede ser transferido através de cables de la luz para proveer la electricidad a un consumidor o una empresa.

Scheme.png

El Mantenimiento del Sistema[edit | edit source]

  • Los sistemas de microhídro requieren mantenimiento aunque el costo de este mantenimiento sea generalmente bajo.[11]Por lo general, solamente un obrero puede completar estos trabajos. Hay que limpiar los filtros regularmente, pero se puede reducir el número de las limpiezas. Si se instala el filtro de un ángulo, el filtro se podrá limpiar. Hay que desembarazar los conductos forzados después de un período de tiempo, pero lo mejor el filtro, lo menos seguido que el conducto forzado se pondrá bloquear. Hay que lubricar algunas máquinas dentro de la casa de la turbina para que puedan seguir funcionando al nivel óptimo. Si se usa pilas para acumular energía, hay que igualarlas regularmente. El salario mínimo en el estado de Chiapas es 49 pesos/hora[12] para tres horas de mantenimiento cada mes estimado, el mantenimiento costaría 1,764 pesos cada año.

Pros and Cons of Micro Hydro[13][14][15][edit | edit source]

Pros Cons
  • Water is a concentrated and continuous source of energy
  • Energy availability is fairly predictable
  • Very little maintenance is required
  • There is very little environmental impact
  • Greenhouse gases are reduced by reduction of fossil fuel usage
  • Good sites close to communities are hard to find
  • There is not much room for expanding the power generated
  • Variations in seasonal river flow can limit power availability
  • Other uses for the water, such as irrigation, can take away from the desirability of the system
  • Lack of government support and subsidies
  • The additional work and maintenance may be undesirable if the electricity recipients are already grid tied

El Estudio de Factibilidad[edit | edit source]

La factibilidad de un sistema de microhídro es primeramente dependiente en el flujo y la caída disponibles en el sitio, y segundamente en la carga de electricidad y la proximidad del sistema a la comunidad. El estudio de factibilidad para un sistema de microhídro trata de responder a las siguientes preguntas para un sitio dado:[16]

16047612-Canada-Micro-Hydro-Guide.pdf
  • ¿Cuánta caída está disponible?
  • ¿Qué son los ritmos de flujo máximos y mínimos?
  • ¿Cómo largo tiene que ser el conducto forzado?
  • ¿Cuánto poder se puede generar con estos ritmos de flujo?
  • ¿Cuáles son los costos iniciales y anuales?
  • ¿Hay la posibilidad de afectar al medio ambiente con una instalación de microhídro?

Data Collection Methods[edit | edit source]

Midiendo el Ritmo del Flujo[edit | edit source]

Hay varios metodos para medir el ritmo del flujo. El metodo que usamos fue medir una sección atrás del río y medir el período del tiempo de un objeto flotando bajo de la sección atrás. Tomamos el promedio de nuestras diez pruebas y multiplicamos el medio tiempo por la área estimado de la sección atrás para calcular el flujo en pies cúbicos cada minuto. Entonces convirtimos éste en galones cada minuto. Hay a menos de un otro metodo para determinar el ritmo del flujo que tiene que ver con la construcción de una presa temporaria y después poniendo un tubo fuera de la presa que divierta el agua a una holla de una capacidad específica. Midiendo el ritmo en que llena la holla y entonces multiplicando el medio tiempo para llenar la holla por el la capacidad de volumen de la holla nos da el ritmo del flujo.[17]

Midiendo la Caída Disponible[edit | edit source]

La manera en que medimos la caída fue usar un nivel del carpintero y un polo calibrado de cinco pies en longitud. Tuvimos una persona cambinando en frente del nivel contando las zancadas hasta que sus pies estuvieron directamente en linea con el nivel significando que el caminante se había subido cinco pies de elevación. Entonces, movimos el nivel a donde paró el caminante y repetimos este paso. Empezamos a medir de donde querría poner nuestra casa de turbina y caminamos hasta que lleguemos a la elevaciónd del río. Por contando cuantas veces paró el caminante, pudimos determinar la cantidad de la carrera del cerro que nos permita a determinar la cantidad de tubo necesaria para el conducto forzado. Por multiplicando la cantidad de zancadas por la longitud de una zancada del caminante, pudimos determinar la cantidad de caída disponible desde el río hasta la casa de turbina.[18]

Power Output Equation[edit | edit source]

  A common field equation to measure the theoretical maximum power available in a moving body of water is:


Where:

  • Pmax=Maximum Power Available (kW)
  • Qmax=Flow (Volume/time)
  • Hmax=Head (Vertical drop in ft)
  • emax=Efficiency of the turbine (use a value of 1 for max power available)
  • K=Unit conversion factor (see table below for some common values)
For Q measured in K is equal to
ft3/min 708 (ft4)/(min*kW)
ft3/sec (CFS) 11.8 (ft4)/(sec*kW)
l/sec 102 (l*ft)/(sec*kW)
gal/min (GPM) 5302 (gal*ft)/(min*kW)


To find the actual power you will get from that moving body of water, calculate Pnet with the following changes made.

Where:

  • Pnet= The net power extracted from the river, not including loss in delivery from power station to load (kW)
  • Qnet= Flow (Volume/time) - Only take a portion of the max flow (%take). For delicate streams this may be a small percentage of the total flow
    • Qnet=Qmax*%take
  • Hnet= Head (Vertical drop in feet) - This is the actual head that you have available due to losses from friction. Calculate friction loss using tables based on the materials you use for diversion (e.g. PVC)
    • Determine equivalent length of pipe by adding actual length of pipe and equivalent lengths of fittings based on tables using pipe size
    • Find Frictional Pressure Loss Ratio (FPL) coefficient in ftloss/ftpipe based upon flow rate and pipe size
    • Calculate Hloss=equivalent length of pipe * FPL
    • Hnet=Hmax-Hloss
  • enet= Efficiency of the turbine - Always between 0 and 1, usually between.5 and.9 depending on the turbine type and flow rate. A value of 0.78 is a good guess for modern turbines in average conditions
  • K=Unit conversion factor (see table above for some common values)

Note that these equations are static in time. You must run these equations with a resolution high enough to cover periods of variation (e.g. monthly river data).

Costos[edit | edit source]

Las pruebas de la factibilidad que ejecutamos utilizaron al programa de software RETScreen para estimar el poder potencial que sería disponible de nuestro sistema prepuesto. Este programa también nos permitó a estimar los costos potenciales de la instalación del sistema y prever la cantidad del tiempo que sería necesario para que la comunidad se recupere tales costos. Éste incluye las tarifas posibles de conectar la energia renovable a la red eléctrica pagadas por la Comisión Federal de la Electricidad (CFE) a la comunidad, la venta de los créditos internacionales de las emisiones de gases invernaderos (de aquí en adelenta conocidos como créditos de carbón) en el mercado internacional, y la formación de una empresa independiente de electricidad por la comunidad que entonces vendría su electricidad al gobierno.

Los Costos Específicos a los Sitios[edit | edit source]

Los costos estimados iniciales para los sistemas de microhídro diseñados en cada local fueron un parte importante del analisis de RetScreen, fueron usado para determinar el período.

Financiamiento[edit | edit source]

Las opciones potenciales para aumentar la factibilidad de un sistema incluyen: las subvenciones, vendiendo créditos del carbón basado en los gases del efecto invernadero evitado por un sistema de microhídro, o vendiendo la energía a la empresa de energía local para recibir dinero entre tarifas de conectar al red.

Las Subvenciones[edit | edit source]

La ubicación de, intento de, o grupo ayudado por este proyecto; la energía renovable generada; la protección de recursos; la evitación los gases del efecto invernadero; o el uso final de la electricidad puede ayudar a obtener algunas subvenciones por fuentes diferentes para ayudar con capital inicial requisito para construir este sistema. Algunas ejemplos de organizaciones de subvenciones que posiblemente sería relevante a un proyecto de microhídro son:

for projects that combat environmental problems and protect human rights.[19]

  • Terra Viva is a "directory of international grant funding for agriculture, energy, environment, and natural resources in the developing world."[20]
Créditos de Carbono[edit | edit source]

Vendiendo créditos de carbono en el mercado internacional es una manera de aumentar la factibilidad de este sistema. Por cada megatonelada de dióxido de carbono no emitida por esta energía limpia forma un crédito de carbono o OCO que se puede vender a una empresa generando estos gases del efecto invernadero. Este mercado existe a cause del limite de emisiones creado por el tratado de Kioto. Precios varian, pero 3Degrees[21] compra estos créditos por $15 dólares (EEUU) cada tonelada métrica de dioxido de carbono.

Feed-In Tariffs[edit | edit source]

Feed-in tariffs pay a rate for electricity fed back into the grid from a renewable energy technology such as solar, wind or hydro.  Feed-in tariffs both encourage investment in renewable energy technologies and supplement the grid with cleaner sources of power otherwise going unused by the owner of the system.[22] The Mexican government approved small-scale solar grid tie-in in 2007, but there are not yet any laws for wind or hydro power technologies.[23][24]

FI.pdf

Permits and Grid Tie-In Feasibility[edit | edit source]

  • Requirements to obtain a permit for construction[25]
  • Required Application
  • Copy of property payment for the year
  • Copy of owner´s identification
    • Copy of exact location and official updated number
  • Sketch of what will be constructed and a copy (architectural and with structural details, legal-size or double letter size)
  • Copy of feasibility and use of site (in case of commercial use or if there is more than one occupant in the same property)
  • According to Artículo 192 from La Ley Federal de Derechos from La Constitución Política de los Estados Unidos Mexicanos, applicable fees for use of national water are $2,745.00 (MXN); for use of land within 10 meters of national water are $1,163.00 (MXN)[26]
  • According to Capítulo 3 of Artículo 80 from La Ley de Agua Nacionales from La Constitución Políica de los Estados Unidos Mexicanos,concessions are not required for small scale hydro power projects[27]

Consideraciones del Medio Ambiente[edit | edit source]

La Clima y la Lluvia[edit | edit source]

El clima y la cantidad de la lluvia de la región determinan el flujo del agua en el río del tiempo. Una ubicación más factible para construir un sistema de microhídro tiene una gama anual de flujo pequeña (contra a un área con una gama amplia de ralentización entre las estaciones). La información de la duración del flujo y los cambios temporales afectan la calculaciones de la energía.[28]

16047612-Canada-Micro-Hydro-Guide.pdf

Sites[edit | edit source]

River near Pueblo Molino de los Arcos[edit | edit source]

MolinoDeLosArcos.jpg

Date Visited: 12 July 2010
Flow rate calculated: 3015 GPM
Head:
30 feet
Length of Pipe:
110 feet
P max:
17 kW
P net:
540 Watts
GPS Coordinates: 
N 62.8º W -92.6º
Feasibility: 
The river of Peje de Oro flows through this small community, which lies within San Cristóbal de Las Casas. They currently have a micro hydro system infrastucture such as a weir, turbine house, forebay tank and part of a canal that is not in use. Federal power has been cheap enough to make the cost of repairs unjustifiable, but recently the community expressed an interest in repairing the system. Since the infrastructure is already in place the feasibility study would be on the cost of repairing the canal, replacing parts and getting the system running again.

Río de Alcanfores[edit | edit source]

Alcanfores.jpg


Date Visited: 17 June 2010
Flow rate calculated:
120 GPM
Head:
15 feet
Length of Pipe:
87 feet
P max: 670 Watts
P net:
220 Watts
GPS Coordinates:
N 16º44.730' W 92º38.028'
Feasibility:
This small river is close to the neighborhood of Alcanfores, outside of San Cristóbal de Las Casas. The amount of power generated by this stream during the rainy season is sufficient enough to consider the site feasible for the construction of a pico-hydro system. This stream is of interest because the community of Alcanfores is near the site surveyed, and a Zapatista community seeking independence from the government lies approximately an hour further upstream. But the amount of available head did not warrant futher investigation of the site.


Río Jataté en el Pueblo de Corralito[edit | edit source]

ElCorralito.jpg


Date Visited: 14 July 2010
Feasibility: This site lies a bit further from San Cristóbal de Las Casas on the way to Ocosingo and Palenque. Winding down out of the mountains, we could see that the vegetation grew more lush and the maps indicated that heading in this direction would be an ideal zone in terms of rainfall, topographic variety and community location. Corralito is a tiny farming community known for its small touristic attraction of a waterfall in the headwaters of Río Jataté, which goes on to power the Cascadas of Agua Azul. We did not take measurements of its width and depth due to lack of both time and proper introduction to the community. We did speak with a local agronomist, who informed us that the local power lines came from the CFE and we observed a billboard near the center of the community reading that it was being supported by government construction, which could prove useful as a source of grants. We also passed many signs posted outside of autonomous communities reading that they were in protest of paying high government taxes for electricity to power their lights, which may present opportunities for further investigation.

Parque Ecología Las Canastas, San Cristóbal[edit | edit source]

LasCanastas.jpg



Date Visited: 21/23 July 2010
Flow rate calculated: 197,800 GPM
Head: 15 Feet
Length of Pipe: 80 feet
P max:
558 kW
P net: 220 Watts
GPS Coordinates: N 16º43.969' W 092º36.135'
Feasibility: This site is situated just outside of San Cristóbal de Las Casas behind the neighborhood of La Revolución. A weir and canal have already been constructed on this site for irrigation purposes. A road brings you about 100 feet from the dam. The fact that some of the infrastructure necessary for a hydro set up makes this location very promising. We spoke with a local resident who told us the river had relatively steady year-round flow. There are a few homes, a permaculture community that we learned about which may be constructed in the hills above the river and a nearby factory that may be interested in the generation of micro-hydro power. Although our RETScreen analysis did not indicate a current feasibility, more accurate river flow data, a grant or subsidy from the government for the community, or interest from the factory may be enough to change the financial circumstances.

Parque Ecoturística Arcotete, San Cristóbal [edit | edit source]

    

ElArcotete.jpg


Date Visited: 23 July 2010
Feasibility: This river is part of an ecological park outside of San Cristóbal de Las Casas further upstream from Las Canastas along the same river. Attempting to test the flow of the river proved unsuccessful. Matt took one step into the river and immediately began sinking rapidly into the mud. Tests were discontinued for safety reasons. In addition to difficult testing conditions there did not appear to be any communities nearby. For these reasons Arcotete was ruled out as a feasible location, however should a community someday form, we can extrapolate from our word-of-mouth information on the flow data in Las Cnastas that the site maintains a strong year-round flow.



Los Diseños de los Sistemas[edit | edit source]

Both systems at the two most feasible sites of Las Canastas and Molino de los Arcos are designed to be AC integrated systems. AC integrated systems bring the generated electricity directly to a user, unlike a battery system where the user must pick up a charged battery at the powerhouse. The available power is limited by the potential of the stream. If the site has enough flow and head, this system can be designed to the highest load requirement of the community.[29]

Figure 3: Image credited to: Homepower Magazine


Ambos sistemas de los dos sitios más factibles de Las Canastas y Molino de los Arcos están diseñado para sistemas del corriente alternado. Los sistemas de corriente alternado lleva la electricidad generada directamente al consumidor, diferente de un sistema de pilas en que el consumidor tiene que llevar una pila encargada de la casa de la turbina. La energía disponible está limitadi por la potencial del arroyo. Si el sito tenga suficiente flujo, se podrá diseñar este sistema al requisito lo más alto de la carga de la comunidad.[30]

Las Canastas[edit | edit source]

El sistema en Las Canastas está diseñado para una situación que falta la caída, pero tiene mucho flujo. Escogimos la Ampair UW100 Turbina de Agua, que es una turbina de reacción que se puede poner a dentro del agua que obtiene la energía por su lugar directamente en el río.[31] Este sistema fue deseñado para ser conectado al red de electricidad y por eso utiliza el cable de transmisión para llevar la electricidad a los consumidores.


Molino de los Arcos[edit | edit source]

Molino de los Arcos ya tiene la infrastructura de microhídro que no ha estado usada para algunos años, pues mucho del diseño de este sistema es dependiente en reparando los partes que ya existen. El agua estará divertido del río con un canal que es aproximadamente 1 kilometro que estará construido de concreto y rebar. El conducto forzado estará reemplazado con aproximadamente 100 pies de tubo con un diámetro de 28 pulgadas que va a la casa de turbina. La casa de turbina recibirá una turbina nueva de 12 kilowatts y un generador. Es posible que el sistema de cable de transmisión vaya a requirir algunas mejoras porque posiblemente la carga nueve sea más que lo que el sistema tenía originalmente.


mqdefault.jpgYouTube_icon.svg

Conclusión[edit | edit source]

Suposiciones Usados para los Resultados[edit | edit source]

  • Los datos anuales del flujo del río vinieron del Río Grijalva que es un río en Chiapas, pero no está conectado a Peje de Oro. Esperamos datos más precisos.
  • Los salarios de los obreros de construcción y metros de construcción del canal cada día estimado. Basado en citas de obreros de construcción en San Cristóbal de Las Casas.
  • Se puede vender los créditos de carbono en el mercado internacional. El precio del mercado internacional de http://www.3degreesinc.com/. Este precio no es específico al región. Probablemente variará debido al valor de los créditos de carbono depende de cómo sucia está la generación de electricidad en cada región
  • Las tarifas para conectar al red de electricidad para microhídro son legales. Algunas fuentes dicen sí, y algunas dicen solamente para solar.

Sitio Propuesto y Suposiciones[edit | edit source]

Para estimar la fiabilidad de nuestro sistema extrapolamos los valores del flujo de todo el año del río con datos del cercano Río Grijalva. Hemos inidicado el trámite de obtener datos más específicos del río Peje de Oro que fluye por Molino de Los Arcos. También estimamos nuestros costos laborales del sueldo de obreros locales de la construcción y cálculos aproximados de la eficiencia del trabajo obtenidos de las conversaciones con trabajadores y albañiles locales. Los precios de los créditos carbonos que utilizamos fueron obtenidos de los precios corrientes en el mercado internacional y no son específicos para la región. Encontramos información contradictoria sobre la legalidad de las tarifas para conectarse a la red eléctrica en México para el poder micro-hidroeléctrico, pero está legal conectarse directamente a la red eléctrica para los productores de la energia solar y ellos reciben tarifas.

Resultados del Estudio de Factibilidad[edit | edit source]

Para este estudio, el equipo de Team Micro Hydro utilizó RetScreen, un software proveido gratis por el estado de Canada para evaluar proyectos de energía renovable internacionalmente. Entramos nuestros costos de la infraestructura, varias tarifas de introducción de energía renovable a la red eléctrica basadas en los precios de la CFE (Comisión Federal de Electricidad), el precio corriente para los créditos de carbón en el mercado internacional y las cuotas previstas de mantener al sistema anualmente. Basado en las kilowatt-horas que podría generar el sistema, el programa RetScreen calcula cuando la producción de electricidad va a recuperar los costos de la instalación inicial. En este paso, el studio de la factibilidad no está muy exacto tomando en cuento los límites del tiempo del proyecto. Los ONGs (Organizaciones No-Gubernamentales) no nos podían decir antes de terminar el estudio con datos específicos de la hídrologia de la zona, entonces el flujo de los meses del año para el sitio de Peje de Oro fue estimado con datos sustituítos del otro río chiapaneco, el Río Grijalva. El data se puede ver en este pdf.[32] Los datos extrapolados se puede ver en esta hoja de cálculo. File:Hydrodata.xls

Los resultos siguientes son de los dos sitios en cuales enfocamos la mayoría de nuestro sitio: Las Canastas y Molino de Los Arcos. Los tres gráficos de cada uno están basados en las tarifas potenciales de energía a la red eléctrica. El gráfico primero indica el precio corriente de la electricidad de región 1 menos diez porciento para las cuotas administrativas, con las ganancias de los créditos de carbón incluso. El segundo se muestra la tárifa como si la comunidad hubiera formado su empresa propia de electricidad y hubiera dado un descuento de treinta porciento basado en el precio de la electricidad de la CFE. El tercero usa la tarifa de región 1 menos cuarenta porciento para las cuotas administrativas, sin los créditos de carbón. Enlaces a las hojas de cálculo para cada situación hipotética se puede encontar en el pie de cada gráfico.

Las Canastas[edit | edit source]

Molino de los Arcos[edit | edit source]


Como se puede ver en los gráficos la relación costo/beneficio de este sistema específico en Las Canastas nunca favorece. Aconsejamos que no se persiga un sistema de microhídro en Las Canastas. En Molino de Los Arcos encontramos una relación costo/beneficio presupuesta que se luzca más prometedor. El tiempo necesario para recuperar los costos para el caso mejor es aproximadamente 18 años. En el caso segundo es aproximadmente 22 años. En el caso tercero y peor es aproximademnte 25 años.

Sugerencias[edit | edit source]

Technical Vocabulary of Renewable Energies in English-Spanish and Spanish-English

Próximos Pasos y Lecciones Aprendidas[edit | edit source]

Los próximos pasos para este proyecto incluyen esperar para los datos hidrológicos más específicos de la Comisión Nacional del Agua (CONAGUA). Con esta información un estudio de la factibilidad se puede completar con más precisión. Además, el método que investigamos para reparar el canal usando cemento y rebar alargó el tiempo necesario para recuperar los costos. Aconsejamos que se investigue otros métodos para construir el canal utilizando este estudio para obtener una subvención para el sistema.

Una lección que aprendimos de este proyecto es qué puede ser muy difícil obtener datos medioambiental por Internet o correo en México. Por el otro lado, cuando nos enfrentamos cara-a-cara con la gente local obteníamos datos circunstanciales. Además, cuando reunamos con los oficiales de ConAgua, en Tuxtla Gutiérrez, ellos nos oferten a enviar datos en dos meses.

Referencias[edit | edit source]

  1. Islas, J., F. Manzini, and M. Martinez, "Cost-benefit analysis of energy scenarios for the Mexican power sector," Energy 28 (2002): 979-992.
  2. "Electrical Energy in Mexico and Chiapas: Rights, Resistances and Privatization," Maderas del Pueblo del Sureste, A.C. (July 2007): http://www.maderasdelpueblo.org.mx/pdf/DocENERGIA%20ELECTRICA%20MEXICO%20Y%20CHIAPAS.pdf
  3. Public denouncement of government tariff increases, Pueblos Unidos en Defensa de la Energia Eléctrica (23 November 2008)
  4. "Hydroelectric power's dirty secret revealed," New Scientist (February 24, 2005): http://www.newscientist.com/article/dn7046
  5. Hanei, Jeff. USAID. Micro-Hydro Energy for Post War Rehabilitation.
  6. Royce, Michael, "La Pita Micro Hydro: Bringing Power to the People," Hydro World Review March 2000: 32-33.
  7. GEF Small Grants Program. United Nations Development Program. Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia. Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.
  8. GEF Small Grants Program. United Nations Development Program. Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia. Micro-Hydro Power for Agro-Processing in Rural Areas, Bolivia.
  9. Ing. J. Horita. Personal Communication. July 24, 2010
  10. Micro-Hydropower Systems: A Buyer's Guide, CanmetENERGY, Natural Resources Canada: http://web.archive.org/web/20111111192513/http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca:80/fichier/79276/buyersguidehydroeng.pdf
  11. Natural Resources Canada, "An Introduction to Micro-Hydropower Systems," Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2005):2-7.
  12. SIPAZ
  13. Micro-hydro, The Ashden Awards for Sustainable Energy [1].
  14. Micro Hydro Power--Pros and Cons, Alternative Energy News (October 26, 2006) [2].
  15. Small Hydro Power: Technology and Current Status, Renewable and Sustainable Energy Reviews Vol 6, Issue 6 (December 2002): 537-556
  16. Natural Resources Canada,Micro-Hydropower Systems: A Buyer's Guide, Her Majesty the Queen in Right of Canada (2004). Appendix B has a form to fill out based on the site's stream info and electrical needs
  17. Jim Norman,Micro Hydro Power Design Booklet, ABS Alaskan Inc. (uploaded to www.scribd.com 15 May 2010): Appendix 2 Micro Hydro Power Design Booklet by Jim Norman.
  18. Chiras, Daniel D., The Homeowner's Guide to Renewable Energy: Achieving Energy Independence, Gabriola Island, BC, CA: New Society Publishers, 2006.
  19. GEF Small Grants Program
  20. Terra Viva Grants
  21. 3 Degrees Inc.
  22. Energy Matters - Australia. "Feed in tariff for grid connected solar power systems." 2009. [3]
  23. Gobierno de Mexico. Diario Oficial de la Secretaria de Energía. Resolucion No. RES/176/2007. 27 Junio 2007.
  24. Mills, Jsun. "Re: Feed-In Tariffs in Mexico." Email with Alta Energía. 26 July 2010.
  25. Constancias,Licencias y Permisos, Secretary of Public Works and Urban Development, Government of Tuxtla Gutierrez, Capital of Chiapas, http://www.tuxtla.gob.mx/2009/secretaria_obpub.php?sec=licencias
  26. Ley Federal de Derechos
  27. Ley de Agua Nacionales]
  28. Natural Resources Canada, Micro-Hydropower Systems: A Buyer's Guide, Ottawa, Ontario, Canada: Her Majesty the Queen in Right of Canada (2004).
  29. Cunningham, Paul. Homepower Magazine. "Microhydro Electricity Basics" Homepower Magazine
  30. Cunningham, Paul. Homepower Magazine. "Microhydro Electricity Basics" Homepower Magazine
  31. ABSAK
  32. http://www.apfm.info/pdf/case_studies/cs_mexico.pdf
Cookies help us deliver our services. By using our services, you agree to our use of cookies.