• Please complete the task and either 1) hyperlink to the page in our Appropedia space or 2) email Dr. Pearce and cross off the result
  • Update task list every Wednesday by midnight.

Allie

  • get spooler setup, MOST RecycleBot Spooler - list BOM, instructions
  • graph your data box plots
  • paper draft,
  • try PLA pellet extrusion
  • process a bunch of HDPE, measure time it takes to do things, talk to Megan
  • and make a bunch of filament
  • work on printing

Ben

Brad

Brennan

  • Dial in laser speed and current
  • modulate laser power and time for line and spot welds
  • New motors for axis - higher torque Permanently install
  • Motor driver chips - solder piggyback or use higher current chips Still need more current? Triple stack?
  • Confirm tensile test parameters with printed samples
  • Work with Megan to print more tensile bars

Chenlong


Joseph


Jephias

  • get report from Megan -- finish - put in your stuff and stack write TS report - ellipsometery

  • finish metamaterials, perfect absorber lit review
    • review article
  • learn ellipsometry- check complete protocol page
    • learn how to change stages -- document!
  • Plasmonics for solar cell

Mac

  • Figure out why the spectrum intensity does not match the paper
  • generate spectrum for different locations/seasons
  • Look at weather data for cloud data. (Idea being that some locations might have more cloudy days effecting the yearly spectrum)
  • Generate spectrum for various cloud formations
  • Find better water albedo data
  • Figure out how to format data for use in code
  • refine material picks
  • Go over theory, match calculations in code to variables and equations
  • experimental design
  • Research Outline/Summary
  • calibrate reptile light

Megan

XRD

RepRap

Thesis forms/etc

  • Committee
    • Pearce, Shonnard, Hackney
  • Thesis
    • Silane (Finished)
    • MRS - Print vs. conventional Paper (Short finished, long needs work)
    • MRS - Rural recycling paper (Short finished, long needs work)
    • Tensile test of 3D prints
    • Forms [2]
  • Dates:
    • 2 wks before Defense (Approx. Nov 30)- Pre-Defense Form (Day, Time, Place for Defense) [3]
    • 2 wks before Defense (Approx. Nov 30)- Submit Draft to Graduate School/Committee [4]
    • Dec 14th - Defense
    • Dec 15th - Graduation
    • Dec 10th - Within one week before submitting Final Thesis [5]
    • Dec 17th - Final Thesis by 4PM
    • Dec 17th - Before 4PM (Immediately after defense) Report on Final Oral Examination [6]
    • Dec 21st - Complete Final Degree Requirements by 4PM & Degree Completion Form?[7]


Ravi

  • fix pv+internet paper
  • order list for welder
  • put lab in order elec
  • welding simulation

Publications

Rodrigo

Dr. Pearce

(W= waiting on reply) (add to bottom of list before waiting/triggers)


  • figure out about thesis publishing

Deadlines


grants


To do

  • rewrite PL/ellip
  • PVT dispatch
  • outline open science

  • finish/submit lca distribute recycling - w
  • pv off grid - w
  • pv annuity - w
  • exergy -w
  • fuel cell - W
  • trigger Queens PV
  • Salt 2 - w
  • nano redo?
  • Enterprise - W

Pending Projects

open design

spectral pv

Open source hardware projects

Cookies help us deliver our services. By using our services, you agree to our use of cookies.