Line 33: Line 33:


== Brennan ==
== Brennan ==
* Install new motors
* <s>Install new motors</s>
* Dial in laser speed and current
* Dial in laser speed and current
* Fix dimensional accuracy proble
* Weld HXs
* Confirm tensile test parameters with printed samples
* <s>Fix dimensional accuracy proble</s>
* Jerry print ABS tensile bars
* <s>Confirm tensile test parameters with printed sample</s>s
* <s>Jerry print ABS tensile bars</s>
* Pull tensile samples
* Pull tensile samples



Revision as of 14:41, 1 April 2013


  • Please complete the task and either 1) hyperlink to the page in our Appropedia space or 2) email Dr. Pearce and cross off the result
  • Update task list every Wednesday by midnight.

Allie

  • get spooler setup, MOST RecycleBot Spooler - list BOM, instructions
  • graph your data box plots
  • paper draft,
  • try PLA pellet extrusion
  • process a bunch of HDPE, measure time it takes to do things, talk to Megan
  • and make a bunch of filament
  • work on printing

Ben

Brad

Brennan

  • Install new motors
  • Dial in laser speed and current
  • Weld HXs
  • Fix dimensional accuracy proble
  • Confirm tensile test parameters with printed samples
  • Jerry print ABS tensile bars
  • Pull tensile samples

Chenlong


John

  • day 1 stuff

Joseph


Jephias

Mac

  • Figure out why the spectrum intensity does not match the paper
  • generate spectrum for different locations/seasons
  • Look at weather data for cloud data. (Idea being that some locations might have more cloudy days effecting the yearly spectrum)
  • Generate spectrum for various cloud formations
  • Find better water albedo data
  • Figure out how to format data for use in code
  • refine material picks
  • Go over theory, match calculations in code to variables and equations
  • experimental design
  • Research Outline/Summary
  • calibrate reptile light

Ravi

  • fix pv+internet paper
  • order list for welder
  • put lab in order elec
  • welding simulation

Publications

Dr. Pearce

(W= waiting on reply) (add to bottom of list before waiting/triggers)


Deadlines


grants


To do

  • rewrite PL/ellip
  • PVT dispatch
  • outline open science

  • finish/submit lca distribute recycling - w
  • pv off grid - w
  • pv annuity - w
  • exergy -w
  • fuel cell - W
  • trigger Queens PV
  • Salt 2 - w
  • nano redo?
  • Enterprise - W

Pending Projects

open design

spectral pv

Open source hardware projects

Cookies help us deliver our services. By using our services, you agree to our use of cookies.