Line 115: Line 115:
**MRS - Rural recycling paper (Near finished, long version needs fixed up)
**MRS - Rural recycling paper (Near finished, long version needs fixed up)
**Tensile test of 3D prints
**Tensile test of 3D prints
**Forms [http://www.mtu.edu/gradschool/administration/academics/forms-deadlines/masters/]


*Dates:
*Dates:

Revision as of 20:30, 31 October 2012


  • Please complete the task and either 1) hyperlink to the page in our Appropedia space or 2) email Dr. Pearce and cross off the result
  • Update task list every Wednesday by midnight.

Allie

  • meet with Jerry - start exp

  • part for makerbot
  • get spooler setup, MOST RecycleBot Spooler]] - list BOM, instructions
  • get new energy values for processing HDPE,
  • paper draft,
  • process a bunch of HDPE, measure time it takes to do things, talk to Megan
  • and make a bunch of filament
  • work on printing

Ben

Brad

Brennan

  • D80 prez
  • Dial in laser speed and current
  • modulate laser power and time for line and spot welds
  • New motors for axis - higher torque

Chenlong


Joseph


Jephias

  • get report from Megan -- finish - put in your stuff and stack write TS report - ellipsometery
  • finish metamaterials, perfect absorber lit review
    • review article
  • learn ellipsometry- check complete protocol page
    • learn how to change stages -- document!
  • Plasmonics for solar cell

Mac

  • step 1 recreate grass and snow paper
  • Get material library
  • pick materials - look at database (check to see)
  • experimental design
  • Research Outline/Summary
  • calibrate reptile light

Megan

MRS

  • RecycleBot Paper
    • Finalizing
    • Need to create poster
  • RepRap Paper
    • Printed:
      • 1 PLA Water Spout
      • 1 PLA Juicer
      • 0%, 5%, 10%, 25%, 100% PLA Blocks (& 10%, 25% w/o support)
      • ABS Water Spout (1.5 hr print)
      • 25% ABS Block (1-3 hr print depending on %)
    • Need to Print:
      • ABS Juicer (6 hr print (in real time about 4 hours))

XRD

RepRap

  • Do mech testing -- prints for base tests

Thesis forms/etc

  • Committee
    • Pearce, Shonnard, Hackney
  • Thesis
    • Silane (Finished)
    • MRS - Print vs. conventional Paper
    • MRS - Rural recycling paper (Near finished, long version needs fixed up)
    • Tensile test of 3D prints
    • Forms [2]
  • Dates:
    • Before Nov 9th 5PM - MRS Registration $135 [3]
    • Oct 29-Nov 15 - MRS Manuscript Submission
    • Nov 16-26 - Thanksgiving Break (Essentially Campus Deadzone)
    • Nov 24-29 - MRS Trip
    • 2 wks before Defense - Pre-Defense Form (Day, Time, Place for Defense) [4]
    • 2 wks before Defense - Submit Draft to Graduate School/Committee [5]
    • Dec 7th - Defend by (not strict?)
    • Dec 15th - Graduation
    • Dec 10th - Within one week before submitting Final Thesis [6]
    • Dec 17th - Final Thesis by 4PM
    • Dec 17th - Before 4PM (Immediately after defense) Report on Final Oral Examination [7]
    • Dec 21st - Complete Final Degree Requirements by 4PM & Degree Completion Form?[8]


Ravi


Publications

Rodrigo

Dr. Pearce

(W= waiting on reply) (add to bottom of list before waiting/triggers)


  • figure out about thesis publishing

Deadlines


grants


To do

  • rewrite PL/ellip
  • PVT dispatch
  • outline open science

  • finish/submit lca distribute recycling - w
  • pv off grid - w
  • pv annuity - w
  • exergy -w
  • fuel cell - W
  • trigger Queens PV
  • Salt 2 - w
  • nano redo?
  • Enterprise - W

Pending Projects

open design

spectral pv

Open source hardware projects

Cookies help us deliver our services. By using our services, you agree to our use of cookies.