(Created page with "<!-- Comments that appear only in the edit view are formatted like this. --> <!-- These comments are offered as an aid as you get started. Remove as you wish. --> <!-- next line ...")
 
m (Text replacement - "| affiliations = " to "| organizations = ")
 
(51 intermediate revisions by 8 users not shown)
Line 1: Line 1:
<!-- Comments that appear only in the edit view are formatted like this. -->
[[File:las malvinas first screening.jpg|thumb]]
<!-- These comments are offered as an aid as you get started. Remove as you wish. -->
<!-- next line is the code for inserting an image; delete if you don't have an image yet -->
[[File:Imageneeded.png|thumb|right|Sample photo caption.]]


<center>''You can put an abstract (a brief description of your project) here. ''</center>
{{Project data
| authors = User:Amp123
| status = Deployed
| completed = 2013
| location = Las Malvinas, Santo Domingo, Dominican Republic
}}


Some introduction text and background can go here.
{{Practivistas Dominicana menu}}


== Understanding the market ==
[[File:las malvinas rainwater catchment system.jpg|thumb|Rainwater team working on cleaning and reconstructing the roof]]


This is where you can describe what already exists, what is needed, etc.  You may want to include inline references. <ref> You can use the ref code to include inline references. See [[Help:Footnotes]] for more.</ref>
The Practivistas Domincana Program is currently a study abroad program involving Cal Poly Humboldt and UNIBE that takes place in Santo Domingo, Domincan Republic. The rainwater catchment system in Las Malvinas in Santo Domingo was first constructed in 2011 by Intelegencia Colectivo from UNIBE. The water from this system was used for washing but was not potable.


To make bullets use the asterisk:
== Objective ==
* Like this
* and like this
** and two for the next indent
* and back to one...


== Project goals ==
Vandalism and two years of wear and tear has caused the system to fail in its purpose to collect rainwater. The goal is to return the system to working condition and to improve on the previous design.


Describe project goals here.
== Literature Review ==


To make a numbered list use the pound sign:
Literature reviews from [[La Yuca rainwater catchment 2013|La Yuca rainwater catchment]] ([[La Yuca rainwater catchment 2013#Literature Review|2013]]) ([[La Yuca rainwater catchment 2012#Literature Review|2012]]) ([[La Yuca rainwater catchment 2011#Literature Review|2011]]) were utilized to understand and reconstruct the rainwater catchment system in Las Malvinas.
# Like this
# and like this
# See [[Help:Contents]] for more formatting code.


== Design ==
== Criteria ==


Describe your design here.
{| class="wikitable"
! Criteria
! Constraints
! Weight<br>(1-10)
|-
| Accessibility
| Convenient location for everything
| 8
|-
| Level of Maintenance
| Necessary < 3X a year
| 8
|-
| Water Demand
| enough to wash clothes for a few families
| 8- depends on rain
|-
| Educational
| at least 1 person
| 7
|-
| Safety
| Must be sturdy and clean enough for washing
| 9
|-
| Time
| finish project before we leave
| 10
|-
| Materials
| Materials are all local
| 8
|-
| Cost
| as inexpensive as safely possible
| 8
|-
| Durability
| Long lasting design
| 8
|}
 
== Final Design ==
 
The final design of the rainwater catchment system in Las Malvinas consisted of reconstruction of the roof and first flush. Additionally a primary screening and PVC gutters were included in the design. The outcome consisted of a working rainwater catchment system that efficiently prevents contaminants from entering the tinaco(water storage tank).


<!-- Here is a sample gallery.  -->
<gallery>
<gallery caption="Sample gallery">
File:Las malvinas roof construction.jpg|Reconstruction of the roof
File:Imageneeded.png|Sample caption text.
File:Las malvinas first screening.jpg|Finished Rainwater catchment system
File:Imageneeded.png|More sample caption text. This would look better with different images. :)
File:Imageneeded.png|Even more sample caption text.
</gallery>
</gallery>


=== Next level heading ===
=== Maintenance ===
 
This final design requires consistent upkeep in order to reduce the amount of contaminants.
''Periodically OR Every Few Rainfalls''
 
* First Flush holes should be cleared of any blockage
 
''Every Month''


You may need deeper level headings.  Just keep adding equal signs to get that.
* Primary screening must be checked for damage or clogging


== Costs ==
''Every Year''


You may describe your costs here.
* First Flush must be thoroughly cleaned
{| class="wikitable"
* Tinaco (or storage tank) must be emptied of sediment and disinfected
|-
* Sediment must be replaced
! header 1
 
! header 2
==== Maintenance Video ====
! header 3
 
|-
Refer to the La Yuca rainwater catchment [[La Yuca rainwater catchment 2013#Maintenance Video|2013]] maintenance video for guidance on how upkeep a rainwater catchment system.
| row 1, cell 1
 
| row 1, cell 2
== Timeline ==
| row 1, cell 3
 
|-
'''June 28th 2013'''
| row 2, cell 1
Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.
| row 2, cell 2
 
| row 2, cell 3
'''June 29th 2013'''
|}
Bought materials for the rainwater catchment system in the Play in Las Malvinas.
See [[Help:Tables]] and [[Help:Table examples]] for more.
Fixed the toilet/sink system, and first flush. The first screening still has to be modified.
 
'''June 30th 2013'''
Started Construction on the Play rainwater catchment system.
 
* Removed roof
* Fixed bent sections of the roof
* Disassembled the rainwater catchment system
* Cleaned the tinaco
 
'''July 1st 2013'''
 
* Rain
 
'''July 2nd 2013'''
 
* Rain
 
'''July 3rd 2013'''


== Discussion ==
* Worked on constructing the roof
* Worked on completing powerpoint for our project presentation


Your discussion.
'''July 4th 2013'''


=== Next steps ===
* Presentation on our projects


The next steps.
'''July 5th 2013'''


== Conclusions ==
* Sancocho and dancing in Las Malvinas


Your conclusions.
'''July 6th 2013'''


== References ==
* Installed the PVC gutters
* Drilled a hole into the cap of the tinaco for the PVC inlet
* Created the primary screening
* Finished constructing and gluing the first flush


<!-- This code is for placing the citation you included above.  If you did not use the <ref> code, please delete this. -->
'''July 7th 2013'''
<references/>


== Contact details ==
* Completed project with the addition of a faucet and adding silicone to a leak.


Add your contact information.
{{Page data
| keywords = rainwater, rainwater catchment, pvc
| sdg = SDG06 Clean water and sanitation, SDG11 Sustainable cities and communities, SDG12 Responsible consumption and production
| published = 2013
| organizations = Practivistas Dominicana Program, Cal Poly Humboldt
| license = CC-BY-SA-3.0
| language = en
}}


<!-- Don't change the next line unless you intend to change the categorization -->
<!-- Do add additional, appropriate categories.  See http://www.appropedia.org/Appropedia:CategoryTree for ideas. -->
[[Category:Projects]]
[[Category:Practivistas Dominicana Program]]
[[Category:Practivistas Dominicana Program]]
[[Category:Rainwater]]

Latest revision as of 11:56, 28 February 2024

Las malvinas first screening.jpg
FA info icon.svg Angle down icon.svg Project data
Authors Andres Pineda
Location Las Malvinas, Santo Domingo, Dominican Republic
Status Deployed
Completed 2013
OKH Manifest Download
Rainwater team working on cleaning and reconstructing the roof

The Practivistas Domincana Program is currently a study abroad program involving Cal Poly Humboldt and UNIBE that takes place in Santo Domingo, Domincan Republic. The rainwater catchment system in Las Malvinas in Santo Domingo was first constructed in 2011 by Intelegencia Colectivo from UNIBE. The water from this system was used for washing but was not potable.

Objective[edit | edit source]

Vandalism and two years of wear and tear has caused the system to fail in its purpose to collect rainwater. The goal is to return the system to working condition and to improve on the previous design.

Literature Review[edit | edit source]

Literature reviews from La Yuca rainwater catchment (2013) (2012) (2011) were utilized to understand and reconstruct the rainwater catchment system in Las Malvinas.

Criteria[edit | edit source]

Criteria Constraints Weight
(1-10)
Accessibility Convenient location for everything 8
Level of Maintenance Necessary < 3X a year 8
Water Demand enough to wash clothes for a few families 8- depends on rain
Educational at least 1 person 7
Safety Must be sturdy and clean enough for washing 9
Time finish project before we leave 10
Materials Materials are all local 8
Cost as inexpensive as safely possible 8
Durability Long lasting design 8

Final Design[edit | edit source]

The final design of the rainwater catchment system in Las Malvinas consisted of reconstruction of the roof and first flush. Additionally a primary screening and PVC gutters were included in the design. The outcome consisted of a working rainwater catchment system that efficiently prevents contaminants from entering the tinaco(water storage tank).

Maintenance[edit | edit source]

This final design requires consistent upkeep in order to reduce the amount of contaminants. Periodically OR Every Few Rainfalls

  • First Flush holes should be cleared of any blockage

Every Month

  • Primary screening must be checked for damage or clogging

Every Year

  • First Flush must be thoroughly cleaned
  • Tinaco (or storage tank) must be emptied of sediment and disinfected
  • Sediment must be replaced

Maintenance Video[edit | edit source]

Refer to the La Yuca rainwater catchment 2013 maintenance video for guidance on how upkeep a rainwater catchment system.

Timeline[edit | edit source]

June 28th 2013 Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.

June 29th 2013 Bought materials for the rainwater catchment system in the Play in Las Malvinas. Fixed the toilet/sink system, and first flush. The first screening still has to be modified.

June 30th 2013 Started Construction on the Play rainwater catchment system.

  • Removed roof
  • Fixed bent sections of the roof
  • Disassembled the rainwater catchment system
  • Cleaned the tinaco

July 1st 2013

  • Rain

July 2nd 2013

  • Rain

July 3rd 2013

  • Worked on constructing the roof
  • Worked on completing powerpoint for our project presentation

July 4th 2013

  • Presentation on our projects

July 5th 2013

  • Sancocho and dancing in Las Malvinas

July 6th 2013

  • Installed the PVC gutters
  • Drilled a hole into the cap of the tinaco for the PVC inlet
  • Created the primary screening
  • Finished constructing and gluing the first flush

July 7th 2013

  • Completed project with the addition of a faucet and adding silicone to a leak.