(Created page with "<!-- Comments that appear only in the edit view are formatted like this. --> <!-- These comments are offered as an aid as you get started. Remove as you wish. --> <!-- next line ...")
 
(→‎Timeline: added category rainwater)
(33 intermediate revisions by 4 users not shown)
Line 2: Line 2:
<!-- These comments are offered as an aid as you get started. Remove as you wish. -->
<!-- These comments are offered as an aid as you get started. Remove as you wish. -->
<!-- next line is the code for inserting an image; delete if you don't have an image yet -->
<!-- next line is the code for inserting an image; delete if you don't have an image yet -->
[[File:Imageneeded.png|thumb|right|Sample photo caption.]]
{{template:Practivistas Dominicana student projects header}}
{{TOCright}}


<center>''You can put an abstract (a brief description of your project) here. ''</center>
== Background ==
[[image:las_malvinas_rainwater_catchment_system.jpg|left|300px|thumb|Rainwater team working on cleaning and reconstructing the roof]]
The Practivistas Domincana Program is currently a study abroad program involving Humboldt State University and UNIBE that takes place in Santo Domingo, Domincan Republic. The rainwater catchment system in Las Malvinas in Santo Domingo was first constructed in 2011 by Intelegencia Colectivo from UNIBE. The water from this system was used for washing but was not potable.


Some introduction text and background can go here.
== Objective ==
Vandalism and two years of wear and tear has caused the system to fail in its purpose to collect rainwater. The goal is to return the system to working condition and to improve on the previous design.


== Understanding the market ==
== Literature Review ==
Literature reviews from [[La Yuca rainwater catchment 2013|La Yuca rainwater catchment]] ([[La Yuca rainwater catchment 2013#Literature Review|2013]]) ([[La Yuca rainwater catchment 2012#Literature Review|2012]]) ([[La Yuca rainwater catchment 2011#Literature Review|2011]]) were utilized to understand and reconstruct the rainwater catchment system in Las Malvinas.


This is where you can describe what already exists, what is needed, etc.  You may want to include inline references. <ref> You can use the ref code to include inline references.  See [[Help:Footnotes]] for more.</ref>
==Criteria==
 
{| class="wikitable sortable"
To make bullets use the asterisk:
|-
* Like this
! Criteria
* and like this
! Constraints
** and two for the next indent
! Weight <br>(1-10)
* and back to one...
|-
 
| Accessibility
== Project goals ==
| <center>Convenient location for everything</center>
 
| <center>8</center>
Describe project goals here.
|-
 
| Level of Maintenance
To make a numbered list use the pound sign:
| <center>Necessary < 3X a year </center>
# Like this
| <center>8</center>
# and like this
|-
# See [[Help:Contents]] for more formatting code.
| Water Demand
| <center>enough to wash clothes for a few families</center>
|<center>8- depends on rain</center>
|-
| Educational
| <center>at least 1 person</center>
|<center>7</center>
|-
| Safety
|<center> Must be sturdy and clean enough for washing</center>
|<center>9</center>
|-
| Time
| <center>finish project before we leave</center>
|<center>10</center>
|-
| Materials
| <center> Materials are all local</center>
| <center>8</center>
|-
| Cost
| <center>as inexpensive as safely possible</center>
| <center>8</center>
|-
|Durability
|<center>Long lasting design</center>
|<center>8</center>
|-
|}


== Design ==
== Final Design ==
The final design of the rainwater catchment system in Las Malvinas consisted of reconstruction of the roof and first flush. Additionally a primary screening and PVC gutters were included in the design. The outcome consisted of a working rainwater catchment system that efficiently prevents contaminants from entering the tinaco(water storage tank).


Describe your design here.
{{gallery
|width=180
|height=135
|lines=2
|file:las_malvinas_roof_construction.jpg|Reconstruction of the roof
|file:las_malvinas_first_screening.jpg|Finished Rainwater catchment system
}}
===Maintenance===
This final design requires consistent upkeep in order to reduce the amount of contaminants.<br />
''Periodically OR Every Few Rainfalls''
*First Flush holes should be cleared of any blockage
''Every Month''
*Primary screening must be checked for damage or clogging
''Every Year''
*First Flush must be thoroughly cleaned
*Tinaco (or storage tank) must be emptied of sediment and disinfected
*Sediment must be replaced


<!-- Here is a sample gallery.  -->
==== Maintenance Video====
<gallery caption="Sample gallery">
Refer to the La Yuca rainwater catchment [[La_Yuca_rainwater_catchment_2013#Maintenance Video|2013]] maintenance video for guidance on how upkeep a rainwater catchment system.
File:Imageneeded.png|Sample caption text.
File:Imageneeded.png|More sample caption text. This would look better with different images. :)
File:Imageneeded.png|Even more sample caption text.
</gallery>


=== Next level heading ===
== Timeline ==
'''June 28th 2013'''
Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.


You may need deeper level headings. Just keep adding equal signs to get that.
'''June 29th 2013'''
Bought materials for the rainwater catchment system in the Play in Las Malvinas.
Fixed the toilet/sink system, and first flush. The first screening still has to be modified.


== Costs ==
'''June 30th 2013'''
Started Construction on the Play rainwater catchment system.
*Removed roof
*Fixed bent sections of the roof
*Disassembled the rainwater catchment system
*Cleaned the tinaco


You may describe your costs here.
'''July 1st 2013'''
{| class="wikitable"
*Rain
|-
! header 1
! header 2
! header 3
|-
| row 1, cell 1
| row 1, cell 2
| row 1, cell 3
|-
| row 2, cell 1
| row 2, cell 2
| row 2, cell 3
|}
See [[Help:Tables]] and [[Help:Table examples]] for more.


== Discussion ==
'''July 2nd 2013'''
*Rain


Your discussion.
'''July 3rd 2013'''
*Worked on constructing the roof
*Worked on completing powerpoint for our project presentation


=== Next steps ===
'''July 4th 2013'''
*Presentation on our projects


The next steps.
'''July 5th 2013'''
*Sancocho and dancing in Las Malvinas


== Conclusions ==
'''July 6th 2013'''
*Installed the PVC gutters
*Drilled a hole into the cap of the tinaco for the PVC inlet
*Created the primary screening
*Finished constructing and gluing the first flush


Your conclusions.
'''July 7th 2013'''
*Completed project with the addition of a faucet and adding silicone to a leak.


== References ==


<!-- This code is for placing the citation you included above.  If you did not use the <ref> code, please delete this. -->
<references/>


== Contact details ==


Add your contact information. 


<!-- Don't change the next line unless you intend to change the categorization -->
   
<!-- Do add additional, appropriate categories. See http://www.appropedia.org/Appropedia:CategoryTree for ideas. -->
[[Category:Projects]]
[[Category:Projects]]
[[Category:Practivistas Dominicana Program]]
[[Category:Practivistas Dominicana Program]]
[[Category:Rainwater]]

Revision as of 03:56, 25 November 2016

Background

Rainwater team working on cleaning and reconstructing the roof

The Practivistas Domincana Program is currently a study abroad program involving Humboldt State University and UNIBE that takes place in Santo Domingo, Domincan Republic. The rainwater catchment system in Las Malvinas in Santo Domingo was first constructed in 2011 by Intelegencia Colectivo from UNIBE. The water from this system was used for washing but was not potable.

Objective

Vandalism and two years of wear and tear has caused the system to fail in its purpose to collect rainwater. The goal is to return the system to working condition and to improve on the previous design.

Literature Review

Literature reviews from La Yuca rainwater catchment (2013) (2012) (2011) were utilized to understand and reconstruct the rainwater catchment system in Las Malvinas.

Criteria

Criteria Constraints Weight
(1-10)
Accessibility
Convenient location for everything
8
Level of Maintenance
Necessary < 3X a year
8
Water Demand
enough to wash clothes for a few families
8- depends on rain
Educational
at least 1 person
7
Safety
Must be sturdy and clean enough for washing
9
Time
finish project before we leave
10
Materials
Materials are all local
8
Cost
as inexpensive as safely possible
8
Durability
Long lasting design
8

Final Design

The final design of the rainwater catchment system in Las Malvinas consisted of reconstruction of the roof and first flush. Additionally a primary screening and PVC gutters were included in the design. The outcome consisted of a working rainwater catchment system that efficiently prevents contaminants from entering the tinaco(water storage tank).

Maintenance

This final design requires consistent upkeep in order to reduce the amount of contaminants.
Periodically OR Every Few Rainfalls

  • First Flush holes should be cleared of any blockage

Every Month

  • Primary screening must be checked for damage or clogging

Every Year

  • First Flush must be thoroughly cleaned
  • Tinaco (or storage tank) must be emptied of sediment and disinfected
  • Sediment must be replaced

Maintenance Video

Refer to the La Yuca rainwater catchment 2013 maintenance video for guidance on how upkeep a rainwater catchment system.

Timeline

June 28th 2013 Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.

June 29th 2013 Bought materials for the rainwater catchment system in the Play in Las Malvinas. Fixed the toilet/sink system, and first flush. The first screening still has to be modified.

June 30th 2013 Started Construction on the Play rainwater catchment system.

  • Removed roof
  • Fixed bent sections of the roof
  • Disassembled the rainwater catchment system
  • Cleaned the tinaco

July 1st 2013

  • Rain

July 2nd 2013

  • Rain

July 3rd 2013

  • Worked on constructing the roof
  • Worked on completing powerpoint for our project presentation

July 4th 2013

  • Presentation on our projects

July 5th 2013

  • Sancocho and dancing in Las Malvinas

July 6th 2013

  • Installed the PVC gutters
  • Drilled a hole into the cap of the tinaco for the PVC inlet
  • Created the primary screening
  • Finished constructing and gluing the first flush

July 7th 2013

  • Completed project with the addition of a faucet and adding silicone to a leak.