No edit summary |
|||
Line 7: | Line 7: | ||
==Humboldt WaveConnect™ Pilot Project== | ==Humboldt WaveConnect™ Pilot Project== | ||
<ref>"Humboldt WaveConnect Pilot Project." Pacific Gas & Electric, Web. 09 Oct. 2012. <http://www.pge.com/about/environment/pge/cleanenergy/waveconnect/projects.shtml>..</ref> | |||
The WaveConnectTM Program was introduced by PG&E in 2009.<ref>"Humboldt WaveConnect Pilot Project." Pacific Gas & Electric, Web. 09 Oct. 2012. <http://www.pge.com/about/environment/pge/cleanenergy/waveconnect/projects.shtml>..</ref> | |||
Part of the program proposed a pilot study to be conducted off the coast of Humboldt County in Northern California. | |||
The area of study was off to be located just outside of the Humboldt Bay. The preliminary permit allowed PG&E to conduct studies only, not construction, exclusion, or any physical disturbance.<ref>http://www.pge.com/includes/docs/pdfs/shared/environment/pge/waveconnect/FERCPreliminaryPermitAreaMap.pdf</ref> | |||
===Components=== | ===Components=== | ||
Revision as of 01:04, 11 October 2012
- 1 peer reviewed journal article
- 1 reference book
- a few reputable web reference
Introduction
Humboldt WaveConnect™ Pilot Project
The WaveConnectTM Program was introduced by PG&E in 2009.[1]
Part of the program proposed a pilot study to be conducted off the coast of Humboldt County in Northern California.
The area of study was off to be located just outside of the Humboldt Bay. The preliminary permit allowed PG&E to conduct studies only, not construction, exclusion, or any physical disturbance.[2]
Components
Conflicts
Costs
References
- ↑ "Humboldt WaveConnect Pilot Project." Pacific Gas & Electric, Web. 09 Oct. 2012. <http://www.pge.com/about/environment/pge/cleanenergy/waveconnect/projects.shtml>..
- ↑ http://www.pge.com/includes/docs/pdfs/shared/environment/pge/waveconnect/FERCPreliminaryPermitAreaMap.pdf
- ↑ http://www.renewableenergyworld.com/rea/news/article/2010/11/pg-e-no-longer-pursuing-humboldt-waveconnect-ocean-energy-project