Line 26: Line 26:
|3|When concrete is in the entire bottom culm, fasten steel clamps around the diameter of the bamboo and leave to dry (may take several days).
|3|When concrete is in the entire bottom culm, fasten steel clamps around the diameter of the bamboo and leave to dry (may take several days).
|Image:Bamboo holes.jpeg| Digging Holes  
|Image:Bamboo holes.jpeg| Digging Holes  
|3|Dig holes that are wide enough and deep enough so that the bamboo poles will sit securely in the ground.
|4|Dig holes that are wide enough and deep enough so that the bamboo poles will sit securely in the ground.
|Image:Bamboo secured.jpeg | Fill holes with concrete
|Image:Bamboo secured.jpeg | Fill holes with concrete
|4|Fill holes with concrete and leave to dry for several days without disturbing the posts. (You may need to add supports on the side of the beams to prevent tilting).  
|5|Fill holes with concrete and leave to dry for several days without disturbing the posts. (You may need to add supports on the side of the beams to prevent tilting).  
}}
}}



Revision as of 02:27, 24 June 2014

Sample photo caption.
You can put an abstract (a brief description of your project) here.

Some introduction text and background can go here.

Building a Bamboo Shade Structure

These are the instructions for the assembly and construction of a bamboo shade structure designed by students enrolled in the Practivistas Dominicana Program in the Dominican Republic. The shade structure consists of bamboo, upcycled billboard tarps and flattened steel drums. Instructions are included below.

How To Build

Before building with bamboo, it is advised to research techniques and recommendations for appropriate season for harvesting as well as methods of harvesting and drying. (For our project we used bamboo that was still partially green which is not desirable but was necessary based on time and resource constraints).

Image:
Build a Bamboo Shade Structure

To make a numbered list use the pound sign:

  1. Like this
  2. and like this
  3. See Help:Contents for more formatting code.

Design

Describe your design here.

Next level heading

You may need deeper level headings. Just keep adding equal signs to get that.

Costs

You may describe your costs here.

header 1 header 2 header 3
row 1, cell 1 row 1, cell 2 row 1, cell 3
row 2, cell 1 row 2, cell 2 row 2, cell 3

See Help:Tables and Help:Table examples for more.

Discussion

Your discussion.

Next steps

The next steps.

Conclusions

Your conclusions.

References


Contact details

Add your contact information.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.