(Created page with "== Abstract == Paragraph of information with the following: background and next steps Information == Problem statement and criteria == == Description of final project == Text...") |
No edit summary |
||
Line 1: | Line 1: | ||
{{Template:ENGR215inprogress}} | |||
== Abstract == | == Abstract == | ||
Line 68: | Line 70: | ||
== Testing Results == | == Testing Results == | ||
Add some numbers and results of compost system. | Add some numbers and results of compost system. | ||
[[Category:Engr215 Introduction to Design]] | |||
[[Category:Friends of the Dunes]] |
Revision as of 22:16, 5 April 2012
Abstract
Paragraph of information with the following: background and next steps Information
Problem statement and criteria
Description of final project
Text text...
File:
Compost System
Cost
Text Text.....
Hours input
Figure 8: Time Invested
Table 1: Expense
Materials | Unit Cost($) | Quantity | Subtotal($) | Tax($) | Total($) |
Our own materials | Cost | Number of units | C times Number of Units | taxes | time taxes |
Our own materials | 4.49 | 1 | 4.49 | 0.40 | 4.89 |
Our own material | 2.99 | 12 | 35.88 | 3.23 | 39.11 |
Total | $ Total |
---|
Testing Results
Add some numbers and results of compost system.