Line 48: Line 48:
== Description of final project ==
== Description of final project ==


== Costs ==
== Costs ==
== Costs ==
{| class="wikitable"
{| class="wikitable"

Revision as of 23:40, 5 April 2012

Template:ENGR215inprogress

Abstract

Text and pictures will be inserted later

Acoustic Dampening Project Plan

More text and figures will be inserted here as well.

Background

Problem Statement and Criteria

Criteria Weight Description
Safety 10 Must be designed to...
Aesthetics 8 Design must be aesthetically pleasing.
Cost 3 Entire design must cost less than $400.
Durability 5 Must last until Humboldt Coastal Nature Center's remodel
Inspiration 7 Design inspirational quality of using alternative building methods.
Ease of Maintenance and Installation 7 Design must be easy to install and free of a lot of maintenance
Functionality 10 Design must improve acoustics within Humboldt Coastal Nature Center.

Description of final project

Costs

Material What We Paid Retail Price
Burlap $150.00 $150.00
Shipping and Handling $5.00 $5.00
Concrete Fasteners (4x) $12.00 $12.
Wood $32.00 $84.00
Lag Bolts (12x) $22.68 $22.68
Newspaper Donated $12
ChickenWire (2'x25') $15.53 $15.53
Total $242.21 $284.21

Testing Results

How to build

Discussion and next steps

References

Cookies help us deliver our services. By using our services, you agree to our use of cookies.