Line 52: Line 52:
'''''Do and show quantity calculations for materials, such as adobe needed (for blocks, mortar, maybe plaster), concrete (foundation etc), water (for adobe etc), paint, etc.'''''
'''''Do and show quantity calculations for materials, such as adobe needed (for blocks, mortar, maybe plaster), concrete (foundation etc), water (for adobe etc), paint, etc.'''''


== Process: Making the Adobe Mixture ==
 
== Process: Preparing the Site ==
<gallery>
<gallery>
Image:Cleaning area for adobe making.jpg|Fig 1: Here the students of the Parras 2006 program are clearing the area where the adobe bricks are going to be constructed. A majority of organic matter is removed so that it does not get mixed into the adobe. The ground both where the adobe matereals are mixed and where the adobes dry is leveled. This allowes for even drying of the adobes and a much smoother process.
Image:Cleaning area for adobe making.jpg|Fig 1: Here the students of the Parras 2006 program are clearing the area where the adobe bricks are going to be constructed. A majority of organic matter is removed so that it does not get mixed into the adobe. The ground both where the adobe matereals are mixed and where the adobes dry is leveled. This allowes for even drying of the adobes and a much smoother process.
Image:Clearing weeds and leveling ground -2.jpg|Fig 2: To clear and level the area tools such as hoes, shovels, rakes, and pick axes were used.
Image:Clearing weeds and leveling ground -2.jpg|Fig 2: To clear and level the area tools such as hoes, shovels, rakes, and pick axes were used.
Image:Compost pile.jpg|Fig 3: During the clearing process separate piles of the organic mater and trash were made. To dispose of the organic mater it was suggested to the homeowners to compost it.   
Image:Compost pile.jpg|Fig 3: During the clearing process separate piles of the organic mater and trash were made. To dispose of the organic mater it was suggested to the homeowners to compost it.   
Image:After the clearing and leveling.jpg|Fig 4: This process took 18 people only two hours to finish. We have found it to be enough area to dry approximately 250 bricks, an important thing to consider in terms of scheduling and drying time. Adobes take aproximately two days to dry enough to be moved in Parras´ hot climate.  
Image:After the clearing and leveling.jpg|Fig 4: This process took 18 people only two hours to finish. We have found it to be enough area to dry approximately 250 bricks, an important thing to consider in terms of scheduling and drying time. Adobes take aproximately two days to dry enough to be moved in Parras´ hot climate.
 
== Process: Making the Adobe Mixture ==
<gallery>
Image:Soaking_dirt.jpg|Fig: After the pile of dry dirt is made into a crater it needs to be filled with water and soaked over night so that the hard chunks of dirt will be easier to break up. This way most of the dirt will be wet for the following day.
Image:Soaking_dirt.jpg|Fig: After the pile of dry dirt is made into a crater it needs to be filled with water and soaked over night so that the hard chunks of dirt will be easier to break up. This way most of the dirt will be wet for the following day.
Image:Covering.jpg|Fig: Once the pile is soaked overnight, the dry dirt from the edges of the crater is piled onto the top of the pool of water. Now there are no extremely dry areas in the extremities, and mixing will be much easier.
Image:Covering.jpg|Fig: Once the pile is soaked overnight, the dry dirt from the edges of the crater is piled onto the top of the pool of water. Now there are no extremely dry areas in the extremities, and mixing will be much easier.

Revision as of 00:32, 8 July 2006

Please note this document is currently a work in progress.

Introduction

This 10 week project is a combination of social service and a comprehensive experience with natural building. The final goal of this project is to provide the Parras Desarollo Integral de la Familia (DIF) a refuge for homeless senior citizens to find shelter and companionship, as integration of the family is an important part of the Parras culture. The shelter is to be constructed out of adobe, a natural building material that is widely used here in Parras. This project also has provided hands on education for the participants of the Parras 2006 summer program and younger DIF volunteers.

Provide more background information, assume that readers do not already know what you are doing. This section should be dramatically expanded.

General Description

The final construction will consist of one large room measuring 4.40 x 6 meters. The adobe walls are 30 cm thick, making the building itself 5 x 6.60 meters. The projected number of adobes needed to complete the shelter is approximately 1,300. (How did you calculate this? State methodology. Adobes are made offsite and transported to DIF.

Location

The shelter is to be constructed in a small ranch town called Parras of approximately 32,000 citizens which is located in northern state of Coahuila Mexico. It will be constructed in the Parras DIF headquarters which is located on the calle Ramos Arizpe. At the DIF headquarters the senior center will be located in a far back right corner, behind the kitchen. The adobe blocks used to build the center were fabricated offsite from the DIF. The site provided ample storage space to allow approximately 250 adobe bricks to dry. We figured out this number first by approximating and then by seeing how many bricks we actually made in the given space.


Proposed Materials and Budget

Quantity Materials Source Cost (pesos) Total
8 Strawbales WHERE FROM? 50 400
4 Truckloads (HOW MUCH) Dirt WHERE FROM? 330 1420
4 Adoberas WHERE FROM? 120 120
(HOW MUCH) Water WHERE FROM? 200 200
TBD Bags Cement WHERE FROM? TBD TBD
Floor (HUH?) WHERE FROM? TBD TBD
Total Cost MATH

Too casual.

Address topics such as plumbing, wiring, windows, doors, framing, paint , sealant, plasters, required mortar, design, labor (there are different costs for different specialities and levels of experience - thus separate out the cost of different laborers), equipment, actual cost of water, rooving, foundation reinforcement and construction. Itemize costs for the floor and roof.

Do and show quantity calculations for materials, such as adobe needed (for blocks, mortar, maybe plaster), concrete (foundation etc), water (for adobe etc), paint, etc.


Process: Preparing the Site

Timeline

Where is your timeline?

Project Participants

Project Coordinators

Project Participants

Parras 2006 Humboldt students and coordinators, Parras DIF employees; Bernardo Reyes and Adrian, Parras DIF volunteers, Adobe educator; Martin (Ciro Liro).

References

http://www.cahe.nmsu.edu/pubs/_g/G-521.pdf
http://www.terracruda.com/architetturadiffusione.htm

Please find Credible Sources

http://www.greenhomebuilding.com/adobe.htm
http://networkearth.org/naturalbuilding/oven.html
http://www.adobebuilder.com/
http://www.adobebuilder.com/adobe-home-construction-2.html
http://www.firebudd.com/adobe/
Cookies help us deliver our services. By using our services, you agree to our use of cookies.